周景宏,胡兆光,田建伟,等.含能效电厂的电力系统生产模拟[J].电力系统自动化,2012,34(18):27-31. Zhou Jinghong,Hu Zhaoguang,Tian Jianwei,et al.Power system production simulation including efficiency power plant[J].Automation of Electric Power Systems,2012,34(18):27-31(in Chinese).
[3]
王锡凡,王秀丽.随机生产模拟及其应用[J].电力系统自动化,2003,27(8):10-15. Wang Xifan,Wang Xiuli.Probabilistic production simulation method and its application[J].Automation of Electric Power Systems,2003,27(8):10-15(in Chinese).
[4]
陈皓勇,王锡凡.电源规划JASP的改进算法[J].电力系统自动化,2000,24(11):22-25,44. Chen Haoyong,Wang Xifan.Generation planning using lagrangian relaxation method and probabilistic production simulation[J].Automation of Electric Power Systems,2000,24(11):22-25,44(in Chinese).
[5]
王锡凡.电力系统规划基础[M].北京:中国电力出版社,1994:67-71.
[6]
宋晓通.基于蒙特卡洛方法的电力系统可靠性评估[D].济南:山东大学,2008:29-37.
[7]
康重庆,夏清,相年德,等.随机生产模拟的序列化分析[J].中国电机工程学报,2002,22(9):6-11. Kang Chongqing,Xia Qing,Xiang Qiande,et al.Sequence-based analysis of probabilistic production cost simulation[J].Proceedings of the CSEE,2002,22(9):6-11(in Chinese).
[8]
张宁,康重庆,陈治坪,等.基于序列运算的风电可信容量计算方法[J].中国电机工程学报,2011,31(25):1-9. Zhang Ning,Kang Chongqing,Chen Zhiping,et al.Wind power credible capacity evaluation model based on sequence operation[J].Proceedings of the CSEE,2011,31(25):1-9(in Chinese).
[9]
胡兆光,方燕平.智能工程及其在电力发展战略研究中的应用[J]. 中国电机工程学报,2000,20(3):45-49. Hu Zhaoguang,Fang Yanping.Intelligent engineering and its application to power development strategy study[J].Proceedings of the CSEE,2000,20(3):45-49 (in Chinese).
[10]
丁伟,胡兆光.智能工程理论扩展及其在电网规划中的应用[J].中国电机工程学报,2008,28(16):15-21. Ding Wei,Hu Zhaoguang.Intelligent engineering theory expanding and its application in transmission planning[J].Proceedings of the CSEE,2008,28(16):15-21(in Chinese).
范杰,杨立兵,李晓刚,等.基于智能代理模型的跨省集中交易平台仿真分析[J].电力系统自动化,2013,37(9):60-65. Fan Jie,Yang Libing,Li Xiaogang,et al.Simulation analysis on trans-provincial centralized trade platform based on smart agent model[J].Automation of Electric Power Systems,2013,37(9):60-65(in Chinese).
[13]
康重庆,夏清,相年德,等.序列运算理论及其应用[M].北京:清华大学出版社,2003:1-5.
[14]
周景宏.能效电厂理论与综合资源战略规划模型研究[D].北京:华北电力大学,2011:23-27.
[15]
A Report Prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee.IEEE reliability test system[J].IEEE Transactions on Power Apparatus and Systems,1979,98(6):2047-2054.
[16]
Allan R N,Billinton R,Abdel-Gawad N M K.The IEEE reliability test system-extensions to and evaluation of the generation system[J].IEEE Transactions on Power Systems,1986,1(4):1-7.