雷亚洲.与风电并网相关的研究课题[J].电力系统自动化,2003,27(8):84-89. Lei Yazhou.Studies on wind farm integration into power system[J].Automation of Electric Power Systems,2003,27(8):84-89(in Chinese).
[2]
陈炳森,胡华丽.我国风电发展概况及展望[J].电网技术,2008,32(2):272-275. Chen Bingsen,Hu Huali.General situation and prospect of wind power in China[J].Power System Technology,2008,32(2):272-275(in Chinese).
[3]
韩小琪,孙寿广,戚庆茹.从系统调峰角度评估电网接纳风电能力[J].中国电力,2010,43(6):16-18. Han Xiaoqi,Sun Shouguang,Qi Qingru.Evaluation of wind power penetration limit from peak regulation[J].Electric Power,2010,43(6):16-18(in Chinese).
[4]
王芝茗,苏安龙,鲁顺.基于电力平衡的辽宁电网接纳风电能力分析[J].电力系统自动化,2010,34(3):86-89. Wang Zhiming,Su Anlong,Lu Shun.Analysis on capacity of wind power integrated into Liaoning power grid based on power balance[J].Automation of Electric Power Systems,2010,34(3):86-89(in Chinese).
[5]
孙荣富,张涛,梁吉.电网接纳风电能力的评估及应用[J].电力系统自动化,2011,35(4):70-75. Sun Rongfu,Zhang Tao,Liang Ji.Evaluation and application of wind power integration capacity in power grid[J].Automation of Electric Power Systems,2011,35(4):70-75(in Chinese).
[6]
张宁,周天睿,段长刚,等.大规模风电场接入对电力系统调峰的影响[J].电网技术,2010,34(1):152-157. Zhang Ning,Zhou Tianrui,Duan Changgang,et al.Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J].Power System Technology,2010,34(1):152-157(in Chinese).
[7]
侯佑华,房大中,齐军,等.大规模风电入网的有功功率波动特性分析及发电计划仿真[J].电网技术,2010,34(5): 60-66. Hou Youhua,Fang Dazhong,Qi Jun,et al.Analysis on active power fluctuation characteristics of large-scale grid-connected wind farm and generation scheduling simulation under different capacity power injected from wind farms into power grid[J].Power System Technology,2010,34(5):60-66(in Chinese).
[8]
张宏宇,印永华,申洪,等.大规模风电接入后的系统调峰充裕性评估[J].中国电机工程学报,2011,31(22):26-31. Zhang Hongyu,Yin Yonghua,Shen Hong,et al.Peak-load regulating adequacy evaluation associated with large-scale wind power integration[J].Proceedings of the CSEE,2011,31(22):26-31(in Chinese).
[9]
衣立东,朱敏奕,魏磊,等.风电并网后西北电网调峰能力的计算方法[J].电网技术,2010,34(2):129-132. Yi Lidong,Zhu Minyi,Wei Lei,et al.A computing method for peak load regulation ability of Northwest China power grid connected with large-scale wind farms[J].Power System Technology,2010,34(2):129-132(in Chinese).
[10]
杨宏,刘建新,苑津莎.风电系统中常规机组负调峰能力研究[J].中国电机工程学报,2010,30(16):26-31. Yang Hong,Liu Jianxin,Yuan Jinsha.Research of peak load regulation of conventional generators in wind power grid[J].Proceedings of the CSEE,2010,30(16):26-31(in Chinese).
[11]
赵晓丽,王玫,赵越,等.基于火电机组容量差异的调峰辅助服务补偿机制改进模型[J].电力系统自动化,2013,37(4):57-61. Zhao Xiaoli,Wang Mei,Zhao Yue,et al.A model of compensation mechanism on peak-regulating ancillary services based on capacity variance across thermal power units[J].Automation of Electric Power Systems,2013,37(4):57-61(in Chinese).
[12]
刘德伟,黄越辉,王伟胜,等.考虑调峰和电网输送约束的省级系统风电消纳能力分析[J].电力系统自动化,2011,35(22):77-81. Liu Dewei,Huang Yuehui,Wang Weisheng,et al.Analysis on provincial system available capability of accommodating wind power considering peak load dispatch and transmission constraints[J].Automation of Electric Power Systems,2011,35(22):77-81(in Chinese).
[13]
柳进,于继来,柳焯.针对风电间歇式扰动的旋转备用智能优化调度策略[J].中国电机工程学报,2013,33(1):163-170. Liu Jin,Yu Jilai,Liu Zhuo.An intelligent optimal dispatch strategy for spinning reserve coping with wind intermittent disturbance[J].Proceedings of the CSEE,2013,33(1):163-170(in Chinese).
[14]
王彩霞,鲁宗相.风电功率预测信息在日前机组组合中的应用[J].电力系统自动化,2011,35(7):13-18. Wang Caixia,Lu Zongxiang.Unit commitment based on wind power forecast[J].Automation of Electric Power Systems,2011,35(7):13-18(in Chinese).
[15]
吴宏宇,管晓宏,翟桥柱,等.水火电联合短期调度的混合整数规划方法[J].中国电机工程学报,2009,29(28):82-88. Wu Hongyu,Guan Xiaohong,Zhai Qiaozhu,et al.Short-term hydrothermal scheduling using mixed-integer linear programming[J].Proceedings of the CSEE,2009,29(28):82-88(in Chinese).