电网技术  2014 

基于等效电量函数法的含DG配电网接线方式可靠性分析

DOI: 10.13335/j.1000-3673.pst.2014.08.028, PP. 2200-2206

Keywords: 等效电量函数法,分布式电源,配电网,接线方式,可靠性

Full-Text   Cite this paper   Add to My Lib

Abstract:

在传统等效电量函数法的基础上,引入了DG的出力模型与负荷的持续曲线模型,并以此计算出含DG的负荷的失负荷概率与系统失负荷电量期望值。再与常见的配电网网架结构相结合,将分布式电源(distributedgenerator,DG)等效为具有等效故障率的常规电源,进而计算线路可靠性指标。算例比较了常见接线方式接入DG后的可靠性指标变化,分析了DG容量与模型参数对等效故障率的影响,探讨了接入DG后不同配电网接线方式可靠性的改善情况,分析了通过选择接线方式或配置合理的DG容量满足可靠性要求的可行性。

References

[1]  Celli G,Ghiani E,Pilo F,et al.Reliability assessment in smart distribution networks[J].Electric Power Systems Research,2013(104):164-175.
[2]  Qin Z,Li W,Xiong X.Incorporating multiple correlations among wind speeds,photovoltaic powers and bus loads in composite system reliability evaluation[J].Applied Energy,2013(110):285-294.
[3]  Ferreira G D,Bretas A S.A nonlinear binary programming model for electric distribution systems reliability optimization[J].International Journal of Electrical Power & Energy Systems,2012,43(1):384-392.
[4]  Zhaohong B,Peng Z,Gengfeng L,et al.Reliability evaluation of active distribution systems including microgrids[J].IEEE Transactions on Power Systems,2012,27(4):2342-2350.
[5]  Shouxiang W,Zhixin L,Lei W,et al.New metrics for assessing the reliability and economics of microgrids in distribution system[J].IEEE Transactions on Power Systems,2013,28(3):2852-2861.
[6]  王锡凡.电力系统随机生产模拟的等效电量函数法[J].西安交通大学学报,1984,18(6):13-26.
[7]  Wang Xifan.EPP aproach to power system probabilitic modeling [J].Journal of Xi’an Jiaotong University,1984,18(6):13-26(in Chinese).
[8]  Pei Z,Lee S T.Probabilistic load flow computation using the method of combined cumulants and Gram-Charlier expansion[J].IEEE Transactions on Power Systems,2004,19(1):676-682.
[9]  Usaola J.Probabilistic load flow in systems with wind generation[J].Generation,Transmission & Distribution,IET,2009,3(12):1031-1041.
[10]  高赐威,何叶.考虑风力发电接入的电网规划[J].电力科学与技术学报,2009,24(4):19-24.
[11]  Gao Ciwei,He Ye.Research of electric network planning with wind power integration considered[J].Journal of Electric Power Science and Technology,2009,24(4):19-24(in Chinese).
[12]  Kai Z,Agalgaonkar A P,Muttaqi K M,et al.Distribution system planning with incorporating DG reactive capability and system uncertainties[J].IEEE Transactions on Sustainable Energy,2012,3(1):112-123.
[13]  杨毅,韦钢,周冰,等.含分布式电源的配电网模糊优化规划[J].电力系统自动化,2010,34(13):19-23.
[14]  Yang Yi,Wei Gang,Zhou Bing,et al.Optimized fuzzy planning of the distribution network including distributed generation[J].Automation of Electric Power Systems,2010,34(13):19-23(in Chinese).
[15]  龚春景.大容量太阳能光伏发电站交流输出功率计算方法研究[J].华东电力,2009,37(8):1309-1312.
[16]  Gong Chunjing.Research on the calculation method of large capacity solar energy PV power generation station with AC output[J].East China Electric Power,2009,37(8):1309-1312(in Chinese).
[17]  谢晓文,刘洪.中压配电网接线模式综合比较[J].电力系统及其自动化学报,2009,21(4):94-99.
[18]  Xie Xiaowen,Liu Hong.Integrated contrast on connection modes of mid-voltage distribution networks[J].Proceedings of the CSU-EPSA,2009,21(4):94-99(in Chinese).
[19]  吴正骅,程浩忠,厉达,等.基于负荷密度比较法的中心城区典型功能区中压配电网接线方式研究[J].电网技术,2009,33(9):24-28.
[20]  Wu Zhenghua,Cheng Haozhong,Li Da,et al.Connection modes for medium voltage distribution networks located in typical functional district of central urban area based on load desity comparison[J].Power System Technology,2009,33(9):24-28(in Chinese).
[21]  葛少云,张国良,申刚,等.中压配电网各种接线模式的最优分段[J].电网技术,2006,30(4):87-91.
[22]  Ge Shaoyun,Zhang Guoliang,Shen Gang,et al.Optimal sectioning of connection modes in medium voltage distribution systems[J].Power System Technology,2006,30(4):87-91(in Chinese).
[23]  周景宏.能效电厂理论与综合资源战略规划模型研究[D].北京:华北电力大学,2011.
[24]  张谦,朱雪凌,黄俊辉,等.负荷持续曲线的解析化模型及其预测方法[J].中国电力,2009,42(09):49-53.
[25]  Zhang Qian,Zhu Xueling,Huang Junhui,et al.Mathematical model and forecasting method of load duration curve[J].Electric Power,2009,42(09):49-53(in Chinese).
[26]  胡泽春,王锡凡.基于半不变量法的随机潮流误差分析[J].电网技术,2009,33(18):32-37.
[27]  Hu Zechun,Wang Xifan.Error analysis of the probabilistic load flow based on cumulant method[J].Power System Technology,2009,33(18):32-37(in Chinese).
[28]  Usaola J.Probabilistic load flow with wind production uncertainty using cumulants and Cornish-Fisher expansion[J].International Journal of Electrical Power & Energy Systems,2009,31(9):474-481.
[29]  王成山,王赛一,葛少云,等.中压配电网不同接线模式经济性和可靠性分析[J].电力系统自动化,2002,26(24):34-39.
[30]  Wang Chengshan,Wang Saiyi,Ge Shaoyun,et al.Economy and reliability analysis of different connection modes in MV distribution systems[J].Automation of Electric Power Systems,2002,26(24):34-39(in Chinese).