电网技术  2014 

应对光伏并网的抽水蓄能电站优化运行

DOI: 10.13335/j.1000-3673.pst.2014.08.012, PP. 2095-2101

Keywords: 光伏并网,抽水蓄能,遗传算法,蒙特卡罗模拟,禁忌搜索

Full-Text   Cite this paper   Add to My Lib

Abstract:

随着太阳能光伏的快速发展,光伏发电随机性与间歇性特点对电力系统的安全稳定运行带来了诸多挑战。建立供电可靠性评估模型评价光伏并网对电力系统运行的影响。提出采用抽水蓄能电站配合光伏发电运行来提高系统的可靠性。以成本最小化为目标建立抽水蓄能电站优化调度模型,采用蒙特卡罗模拟需求负载的不确定性,光伏出力的不确定性以及传统机组故障。运用遗传算法配合禁忌搜索对模型求解。通过IEEE-24节点算例分析验证模型与算法的可行性。仿真结果表明提出的方法在电力系统运行具有可靠性。而且,

References

[1]  陈赟,严正.可再生能源并网发电的可靠性分析和节能分析[J].水电能源科学,2009,27(1):215-218.
[2]  Chen Bin,Yan Zheng.Reliability evaluation and energy saving analysis of renewable energy generation in power system[J].Water Resources and Power,2009,27(1):215-218(in Chinese).
[3]  王海波,杨秀,张美霞,等.平抑光伏系统波动的混合储能控制策略[J].电网技术,2013,37(9):2452-2457.
[4]  Wang Haibo,Yang Xiu,Zhang Meixia,et al.A control strategy of hybrid energy storage system capable of suppressing output fluctuation of photovoltaic generation system[J].Power System Technology,2013,3 Chinese).
[5]  李妍,荆盼盼,王丽,等.通用储能系统数学模型及其PSASP建模研究[J].电网技术,2012,36(1):51-57.
[6]  Li Yan,Jing Panpan,Wang Li,et al.A mathematical model of versatile energy storage system and its modeling by power system analysis software package[J].Power System Technology,2012,36(1):51-57(in Chinese).
[7]  何俊,邓长虹,徐秋实,等.风光储联合发电系统的可信容量及互补效益评估[J].电网技术,2013,37(11):3030-3035.
[8]  He Jun,Deng Changhong,Xu Qiushi,et al.Peaking units expansion planning with weekly regulation pumped storage power station[J].Power System Technology,2013,37(11):3030-3035(in Chinese).
[9]  娄素华,吴耀武,黄智.考虑周调节抽水蓄能电站的调峰电源优化[J].高电压技术,2007,39(3):80-84.
[10]  Lou Suhua,Wu Yaowu,Huang Zhi.Reliability evaluation and energy saving analysis of renewable energy generation in power system[J].High Voltage Engineering,2007,39(3):80-84(in Chinese).
[11]  陈峦,陈池.基于旋转备用和出力预测的风电抽水蓄能并网调度策略[J].水力发电,2011,37(12):65-68.
[12]  Chen Luan,Chen Chi.Grid connection scheduling strategy for pumped-storage and wind power based on spinning reserve and output prediction[J].Hydroelectric Generation,2011,37(12):65-68(in Chinese).
[13]  孔令国,蔡国伟,杨德友,等.光储联合并网发电系统建模与协调研究[J].电网技术,2013,37(2):313-318.
[14]  Kong Lingguo,Cai Guowei,Yang Deyou,et al.Modeling and coordinated control of grid connected PV generation system with energy storage devices[J].Power System Technology,2013,37(2):313-318(in Chinese).
[15]  杨维满,王兴贵.光伏微源特性对串联型微网电压稳定性的影响[J].电网技术,2013,37(4):2446-2451.
[16]  Yang Weiman,Wang Xinggui.Influence of photovoltaic micro source characteristics on voltage stability of the series micro grid[J].Power System Technology,2013,37(4):2446-2451(in Chinese).
[17]  刘健,林涛,同向前,等.分布式光伏电源对配电网短路电流影响的仿真分析[J].电网技术,2013,37(8):2080-2085.
[18]  Liu Jian,Lin Tao,Tong Xiangqian,et al.Simulation analysis on influences of distributed photovoltaic generation on short circuit current in distribution network[J].Power System Technology,2013,37(8):2080-2085(in Chinese).
[19]  刘琳,陶顺,邓建辉,等.基于最优梯度的滞环比较光伏最大功率点跟踪算法[J].电网技术,2012,36(8):56-61.
[20]  Liu Lin,Tao Shun,Deng Jianhui,et al.Improved maximum power point tracking algorithm for photovoltaic generation based on combination of hysteresis comparison with optimal gradient[J].Power System Technology,2012,36(8):56-61(in Chinese).
[21]  Aihara R,Yokoyama A,Nomiyama F,et al.Impact of operational scheduling of pumped storage power plant considering excess energy and reduction of fuel cost on power supply reliability in a power system with a large penetration of photovoltaic generations[C]//Proc 2010 International Conference on Power System Technology.Hangzhou,China,2010.
[22]  黄业斌,刘国刚,文福拴.电力市场环境下抽水蓄能电站的运营模式与效益分析[J].电力科学与工程,2006(3):56-62.
[23]  Huang Yebin,Liu Guogang,Wen Fushuan.A preliminary investigation on operating modes and benefit analysis of pumped storage power plants in electricity market environment[J].Electric Power Science and Engineering,2006(3):56-62(in Chinese).
[24]  Wood A J,Wollenberg B F.Power generation, operation, and control[M].John Wiley& Son,1996.
[25]  杜欣慧,孙红玲.节能发电调度机组组合算法的研究[J].现代电力,2010,27(3):21-24.
[26]  Du Xinhui,Sun Hongling.Study of energy-saving power generation dispatching unit combination algorithm[J].Modern Electric Power,2010,27(3):21-24(in Chinese).
[27]  Gandibleux X,Sevaux M,Sörensen K,et al.Metaheuristics for multiobjective optimization[M].Springer,2004.
[28]  Srinivasan D,Tettamanz A.Heuristics-guided evolutionary approach to multiobjective generation scheduling[J].IEEE Proceedings Generation, Transmission Distribution,1996,143(6):553-559.
[29]  Reliability Test System Task Force of the Application of Probability Methods subcommittee[J].IEEE Transactions on Power Apparatus and Systems,1979,98(6):2047-2054.
[30]  曾倬颖,刘东.光伏储能协调控制的信息物理融合建模研究[J].电网技术,2013,36(6):1506-1513.
[31]  Zeng Zhuoying,Liu Dong.Study on cyber physical system modeling on coordinated control of photovoltaic generation and battery energy storage system[J].Power System Technology,2013,36(6):1506-1513(in Chinese).
[32]  李碧辉,申洪,汤涌,等.风光储联合发电系统储能容量对有功功率的影响及评价指标[J].电网技术,2011,35(4):123-128.
[33]  Li Bihui,Shen Hong,Tang Yong,et al.Impacts of energy storage capacity configuration of HPWS to active power characteristics and its relevant indices[J].Power System Technology,2011,35(4):123-128(in Chinese).