吴雄,王秀丽,李骏,等.考虑风电外送的省级系统调峰分析模型[J].电网技术,2013,37(6):1578-1583.Wu Xiong,Wang Xiuli,Li Jun,et al.A model to analyze peak load regulation of provincial power system considering sending-out of wind power[J].Power System Technology,2013,37(6):1578-1583(in Chinese).
[2]
张志锋,徐箭,闫秉科,等.考虑特高压送风电的湖北电网调峰方案[J].电力自动化设备,2013,33(4):6-11.Zhang Zhifeng,Xu Jian,Yan Bingke,et al.Hubei power grid peak load regulation considering wind power transmitted by UHV network[J].Electric Power Automation Equipment,2013,33(4):6-10(in Chinese).
[3]
湖北省电力公司.湖北电网电力需求预测及负荷特性研究报告[R].武汉:湖北省电力公司,2010.
[4]
杨正瓴,田勇,张广涛,等.相似日短期负荷预测的非线性理论基础与改进[J].电网技术,2006,30(6):63-66.Yang Zhengling,Tian Yong,Zhang Guangtao,et al.Nonlinear theoretical foundation and improvement of similar days method for short term load forecasting[J].Power System Technology,2006,30(6):63-66(in Chinese).
[5]
肖白,丛晶,高晓峰,等.风电-抽水蓄能联合系统综合效益评价方法[J].电网技术,2014,38(2):400-404.Xiao Bai,Cong Jing,Gao Xiaofeng,et al.A method to evaluate comprehensive benefits of hybrid wind power-pumped storage system[J].Power System Technology,2014,38(2):400-404(in Chinese).
[6]
Carrion M,Arroyo J M.A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem[J].IEEE Trans on Power Systems,2006,21(3):1371-1378.
[7]
徐帆,刘军,张涛,等.考虑抽水蓄能机组的机组组合模型及求解[J].电力系统自动化,2012,36(12):36-40.Xu Fan,Liu Jun,Zhang Tao,et al.Unit commitment problem with pumped-storage units[J].Automation of Electric Power Systems,2012,36(12):36-40(in Chinese).
[8]
雷亚洲.与风电并网相关的研究课题[J].电力系统自动化,2003,27(8):84-89.Lei Yazhou.Studies on wind farm integration into power system[J].Automation of Electric Power Systems,2003,27(8):84-89(in Chinese).
[9]
李俊峰.2013中国风电发展报告[M].北京:中国环境科学出版社,2011:1-30.
[10]
陈炳森,胡华丽.我国风电发展概况及展望[J].电网技术,2008,32(2):272-275.Chen Bingsen,Hu Huali.General situation and prospect of wind power in China[J].Power System Technology,2008,32(2):272-275(in Chinese).
[11]
Tuohy A,Meibom P,Denny E,et al.Unit commitment for systems with significant wind penetration[J].IEEE Trans on Power Systems,2009,24(2):592-601.
[12]
肖创英,汪宁渤,丁坤,等.甘肃酒泉风电功率调节方式的研究[J].中国电机工程学报,2010,30(10):1-7.Xiao Chuangying,Wang Ningbo,Ding Kun,et al.System power regulation scheme for Jiuquan wind power base[J].Proceedings of the CSEE,2010,30(10):1-7(in Chinese).
[13]
侯佑华,房大中,齐军,等.大规模风电入网的有功功率波动特性分析及发电计划仿真[J].电网技术,2010,34(5):60-66.Hou Youhua,Fang Dazhong,Qi Jun,et al.Analysis on active power fluctuation characteristics of large-scale grid-connected wind farm and generation scheduling simulation under different capacity power injected from wind farms into power grid[J].Power System Technology,2010,34(5):60-66(in Chinese).
[14]
迟永宁,刘燕华,王伟胜,等.风电接入对电力系统的影响[J].电网技术,2007,31(3):77-81. Chi Yongning,Liu Yanhua,Wang Weisheng,et al.Study on impact of wind power integration on power system[J].Power System Technology,2007,31(3):77-81(in Chinese).
[15]
汪宁渤,王建东,何世恩.酒泉风电跨区消纳模式及其外送方案[J].电力系统自动化,2011,35(22):82-89. Wang Ningbo,Wang Jiandong,He Shien.Cross-border accommodation method and transmission scheme of Jiuquan wind power[J].Automation of Electric Power Systems,2011,35(22):82-89(in Chinese).
[16]
湖北省电力公司.湖北电网“十二五”发展规划报告[R].武汉:湖北省电力公司,2010.
[17]
张丽英,叶廷路,辛耀中,等.大规模风电接入电网的相关问题及措施[J].中国电机工程学报,2010,30(25):1-9.Zhang Liying,Ye Tinglu,Xin Yaozhong,et al.Problems and measures of power grid accommodating large scale wind power[J].Proceedings of the CSEE,2010,30(25):1-9(in Chinese).
[18]
衣立冬,朱敏奕,魏磊,等.风电并网后西北电网调峰能力的计算方法[J].电网技术,2010,34(2):129-132.Yi Lidong,Zhu Minyi,Wei Lei,et al.A computing method of peak load regulation ability of northwest china power grid connected with large scale wind farms[J].Power System Technology,2010,34(2):129-132(in Chinese).
[19]
张宁,周天睿,段长刚,等.大规模风电接入对电力系统调峰的影响[J].电网技术,2010,34(1):152-158.Zhang Ning,Zhou Tianrui,Duan Changgang,et al.Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J].Power System Technology,2010,34(1):152-159(in Chinese).
[20]
张宏宇,印永华,申洪,等.大规模风电接入后的系统调峰充裕性评估[J].中国电机工程学报,2011,31(22):26-31.Zhang Hongyu,Yin Yonghua,Shen Hong,et al.Peak-load regulating adequacy evaluation associated with large-scale wind power integration[J].Proceedings of the CSEE,2011,31(22):26-31(in Chinese).
[21]
刘德伟,黄越辉,王伟胜,等.考虑调峰和电网输送约束的省级系统风电消纳能力分析[J].电力系统自动化,2011,352(2):77-81.Liu Dewei,Huang Yuehui,Wang Weisheng,et al.Analysis on provincial system available capacity of accommodating wind power considering peak load dispatch and transmission constraints[J].Automation of Electric Power Systems,2011,352(2):77-81(in Chinese).
[22]
Zhang Lizi,Cao Fang.Algorithm on optimal wind power capacity using peak load regulation restraints[C]//2012 IEEE International Conference on Power System Technology(POWERCON).Auckland,New Zealand:IEEE,2012:1-5.