Andersson G,Donalek P,Farmer R,et al.Causes of the 2003 major grid blackouts in north America and Europe,and recommended means to improve system dynamic performance[J].IEEE Transactions on Power Systems,2005,20(4):1922-1928.
[2]
陈亦平,洪军.巴西“11.10”大停电原因分析及我国对南方电网的启示[J].电网技术,2010,34(5):77-82.Chen Yiping,Hong Jun.Analysis on causes of blackout occurred in Brazilian Power Grid on Nov.11,2009 and lessons drawn from it to China Southern Power Grid[J].Power System Technology,2010,34(5):77-82(in Chinese).
[3]
毛安家,张戈力,吕跃春,等.2011年9月8日美墨大停电事故的分析及其对我国电力调度运行管理的启示[J].电网技术,2012,36(4):74-78.Mao Anjia,Zhang Geli,Lü Yuechun,et al.Analysis on large-scale blackout occurred in South America and North Mexico interconnected power grid on Sept. 8,2011 and lessons for electric power dispatching in China[J].Power System Technology,2012,36(4):74-78(in Chinese).
[4]
梁志峰,葛睿,董昱,等.印度“7.30”、“7.31”大停电事故分析及对我国电网调度运行工作的启示[J].电网技术,2013,37(7):1841-1848.Liang Zhifeng,Ge Rui,Dong Yu,et al.Analysis of large-scale blackout occurred on July 30 and July 31,2012 in India and its lessons to China’s Power Grid dispatch and operation[J].Power System Technology,2013,37(7):1841-1848(in Chinese).
[5]
Anderson P M,Fouad A A.Power System Control and Stability (Second Edition) [M].Wiley-IEEE Press,USA,2003:3-39.
[6]
Tang C K,Graham C E,EI-Kady M.Transient stability index from conventional time domain simulation[J].IEEE Transactions on Power Systems,1994,9(3):1524-1530.
[7]
汪芳宗,陈德树,何仰赞.大规模电力系统暂态稳定性实时仿真及快速判断[J].中国电机工程学报,1993,13(6):13-19.Wang Fangzong,Chen Deshu,He Yangzan.On-line transient stability simulation and assessment of large-scale power system[J].Proceedings of the CSEE,1993,13(6):13-19(in Chinese).
[8]
Padiyar K R,Krishna S.Online detection of loss of synchronism using energy function criterion[J].IEEE Transactions on Power Delivery,2006,21(1):46-55.
[9]
吕志来,张保会,哈恒旭.基于改进的势能界面判据实时预测电力系统稳定性[J].中国电机工程学报,2002,22(4):94-98.Lü Zhilai,Zhang Baohui,Ha Hengxu.Real time fast predict transient stability based corrected potential surface criterion[J].Proceedings of the CSEE,2002,22(4):94-98(in Chinese).
[10]
Xue Y,Cutsem T V,Pavella M.Extended equal-area criterion justifications,generalizations,applications[J].IEEE Transactions on Power Systems,1989,4(1):44-52.
[11]
薛禹胜.EEAC与直接法的机理比较[J].电力系统自动化,2001,25(11):6-11.Xue Yusheng.A critical comparison of various methods for transient stability assessment[J].Automation of Electric Power Systems,2001,25(11):6-11(in Chinese).
[12]
吴为,汤涌,孙华东,等.基于广域量测信息的电力系统暂态稳定研究综述[J].电网技术,2012,36(9):81-87.Wu Wei,Tang Yong,Sun Huadong,et al.A survey on research of power system transient stability based on wide-area measurement information[J].Power System Technology,2012,36(9):81-87(in Chinese).
[13]
宋方方,毕天姝,杨奇逊.基于广域测量系统的电力系统多摆稳定性评估方法[J].中国电机工程学报,2006,26(16):38-45.Song Fangfang,Bi Tianshu,Yang Qixun.Study on WAMS based multi-swing stability assessment for power systems[J].Proceedings of the CSEE,2006,26(16):38-45(in Chinese).
[14]
刘道伟,马世英,李柏青,等.基于响应的电网暂态稳定态势在线量化评估方法[J].中国电机工程学报,2013,23(4):85-95.Liu Daowei,Ma Shiying,Li Baiqing,et al.Quantitative method for on-line power system transient stability assessment based on response information[J].Proceedings of the CSEE,2013,23(4):85-95(in Chinese).
[15]
卢芳,于继来.基于广域相量测量的暂态稳定快速评估方法[J].电力系统自动化,2010,34(8):24-28.Lu Fang,Yu Jilai.WAMS based power system transient stability assessment[J].Automation of Electric Power Systems,2010,34(8):24-28(in Chinese).
[16]
卢芳,于继来,李彧,等.基于临界机组对的暂态稳定紧急控制策略[J].电网技术,2012,36(10):153-158.Lu Fang,Yu Jilai,Li Yu,et al.Transient stability emergency control based on critical generator pairs[J].Power System Technology,2012,36(10):153-158(in Chinese).
Pai M A.Energy function analysis for power system stability[M].USA:Kluwer Academic Publisher,1989:26-33.
[19]
刘笙,汪静.电力系统暂态稳定的能量函数分析[M].上海:上海交通大学出版社,1996:58-64.
[20]
蔡国伟,穆钢,Chan K W,等.基于网络信息的暂态稳定性定量分析—支路势能法[J].中国电机工程学报,2004,24(5):1-6.Cai Guowei,Mu Gang,Chan K W,et al.Branch potential energy method for power system transient stability assessment based on network dynamic variables[J].Proceedings of the CSEE,2004,24(5):1-6(in Chinese).
[21]
Cai G W,Chan K W,Yuan W P,et al.Identification of the vulnerable transmission segment and cluster of critical machines using line transient potential energy[J].International Journal of Electrical Power & Energy System,2007(29):199-207.
[22]
刘友波,刘俊勇,王民昆,等.计及动能注入介数的线路暂态脆弱性快速评估[J].中国电机工程学报,2011,31(13):40-47.Liu Youbo,Liu Junyong,Wang Minkun,et al.Fast assessment method for transient vulnerability of transmission lines based on kinetic energy injection betweenness[J].Proceedings of the CSEE,2011,31(13):40-47(in Chinese).
[23]
徐林,王秀丽,王锡凡.电气介数及其在电力系统关键线路辨识中的应用[J].中国电机工程学报,2010,30(1):33-39.Xu Lin,Wang Xiuli,Wang Xifan.Electric betweenness and its application in vulnerable line identification in power system[J].Proceedings of the CSEE,2010,30(1):33-39(in Chinese).
[24]
Gomez F R,Rajapakse A D,Annakkage U D,et al.Support vector machine-based algorithm for post-fault transient stability status prediction using synchronized measurements[J].IEEE Transactions on Power Systems,2011,26(3):1474-1483.