孔涛,程浩忠,李钢,等.配电网规划研究综述[J].电网技术,2009,33(19):92-99.Kong Tao,Cheng Haozhong,Li Gang,et al.Review of power distribution network planning[J].Power System Technology,2009,33(19):92-99(in Chinese).
[2]
范明天.基于可靠性的配电网规划思路和方法 讲座一 基于可靠性的配电网规划的概况和基本理念[J].供用电,2011(1):11-14.Fan Mingtian.Ideas and methods of power distribution network planning based on reliability lecture 1 outline and basic conception of power distribution network planning based on reliability[J].Distribution and Utilization,2011(1):11-14(in Chinese).
[3]
陈华光,杜栋,庞庆华,等.基于可靠性的配电网规划评估体系[J].电力科学与技术学报,2013(1):63-68.Chen Huaguang,Du Dong,Pang Qinghua,et al.Reliability based distribution network planning evaluation system[J].Journal of Electric Power Science and Technology,2013(1):63-68(in Chinese).
[4]
王浩浩.配电网可靠性规划及其技术评估方法研究[D].广州:华南理工大学,2012.
[5]
刘洪.面向供电质量提高的城市电网专项规划研究[D].天津:天津大学,2008.
[6]
Kueck J D,Kirby B J,Overholt P N,et al.Measurment practices for reliability and power quality[R].US:Department of Energy,2004.
[7]
Pataki G E.Report of the New York state energy planning board on the reliability of New York State’s electric transmission and distribution systems[R].New York:New York State Energy Planning Board,2000.
[8]
Holland W F.Electric service reliability in Pennsylvania 2005[R].Pennsylvania:Pennsylvania Public Utility Commission,2006.
[9]
Florida Public Service Commission.Review of Florida’s investorowned electric utilities’ service reliability in 2005[R].2006
[10]
程林,蕉岗,田浩.可靠性与经济性相协调的配电网规划方法[J].电网技术,2010,34(11):106-110.Cheng Lin,Jiao Gang,Tian Hao.A method of distribution network planning with coordination of reliability and economics[J].Power System Technology,2010,34(11):106-110(in Chinese).
[11]
韦钢,吴伟力,张子阳,等.综合考虑可靠性成本与缺电成本的电网规划[J].继电器,2006,34(17):38-41.Wei Gang,Wu Weili,Zhang Ziyang,et al.Power network planning considering reliability cost and unerved energy cost[J].Relay,2006,34(17):38-41(in Chinese).
[12]
宋云亭,张东霞,梁才浩,等.南方电网“十一五”城市供电可靠性规划[J].电网技术,2009,33(8):48-54.Song Yunting,Zhang Dongxia,Liang Caihao,et al.Power supply reliability planning for urban power network of China Southern Power Grid[J].Power System Technology,2009,33(8):48-54(in Chinese).
[13]
周湶,孙威,任海军,等.基于最小二乘支持向量机和负荷密度指标法的配电网空间负荷预测[J].电网技术,2011,35(1):66-71.Zhou Quan,Sun Wei,Ren Haijun,et al.Spatial load forecasting of distribution network based on least squares support vector machine and load density index system[J].Power System Technology,2011,33(1):66-71(in Chinese).
[14]
肖白,杨修宇,穆钢,等.基于元胞历史负荷数据的负荷密度指标法[J].电网技术,2014,38(4):1014-1019.Xiao Bai,Yang Xiuyu,Mu Gang,et al.A load density index method based on historical data of cell load[J].Power System Technology,2014,38(4):1014-1019(in Chinese).
[15]
李洪发,刘中胜,王江福.小区负荷密度指标法在格尔木城区电网负荷预测中的应用[J].青海电力,2007,26(2):30-33.Li Hongfa,Liu Zhongsheng,Wang Jiangfu.Application of district load density index method in power grid load forecast of Ge'ermu Urban Areas[J].Qinghai Electric Power,2007,26(2):30-33(in Chinese).
[16]
王永川,陈光明,张海峰,等.可转移电力峰值负荷的新型双向相变储能系统[J].热力发电,2004(9):9-12.Wang Yongchuan,Chen Guangming,Zhang Haifeng,et al.A new bi-phase change energy storage system for electricity peak load that can be transferred[J].Thermal Power Generation,2004(9):9-12(in Chinese).
[17]
李春山,李志国,李淑慧.节能发电调度模式下东北电网运行存在的问题及建议[J].电网技术,2008,32(S1):14-16.Li Chunshan,Li Zhiguo,Li Shuhui.Problems of Northeast China power grid under energy-saving generation dispatching mode and the relative suggestions[J].Power System Technology,2008,32(S1):14-16(in Chinese).
[18]
张宁,周天睿,段长刚,等.大规模风电场接入对电力系统调峰的影响[J].电网技术,2010,34(1):152-158.Zhang Ning,Zhou Tianrui,Duan Changgang,et al.Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J].Power System Technology,2010,34(1):152-157(in Chinese).
[19]
衣立东,朱敏奕,魏磊,等.风电并网后西北电网调峰能力的计算方法[J].电网技术,2010,34(2):129-132.Yi Lidong,Zhu Minyi,Wei Lei,et al.A computing method for peak load regulation ability of Northwest China power grid connected with large-scale wind farms[J].Power System Technology,2010,34(2):129-132(in Chinese).
[20]
杨宏,刘建新,苑津莎.风电系统中常规机组负调峰能力研究[J].中国电机工程学报,2010,30(16):26-31.Yang Hong,Liu Jianxin,Yuan Jinsha.Research of peak load regulation of conventional generators in wind power grid[J].Proceedings of the CSEE,2010,30(16):26-31(in Chinese).
[21]
吴雄,王秀丽,李骏,等.考虑风电外送的省级系统调峰分析模型[J].电网技术,2013,37(6):1578-1583.Wu Xiong,Wang Xiuli,Li Jun,et al.A model to analyze peak load regulation of provincial power system considering sending-out of wind power[J].Power System Technology,2013,37(6):1578-1583(in Chinese).
[22]
赵洁,刘涤尘,杨楠,等.核电机组参与电网调峰的运行方式及效益分析[J].电网技术,2012,36(12):250-255.Zhao Jie,Liu Dichen,Yang Nan,et al.Operation mode and benefits of nuclear power plant participating in peak load regulation of power system[J].Power System Technology,2012,36(12):250-255(in Chinese).
[23]
赵洁,刘涤尘,雷庆生,等.核电机组参与电网调峰及与抽水蓄能电站联合运行研究[J].中国电机工程学报,2011,21(7):1-6.Zhao Jie,Liu Dichen,Lei Qingsheng,et al.Analysis of nuclear power plant participating in peak load regulation of power grid and combined operation with pumped storage power plant[J].Proceeding of the CSEE,2011,21(7):1-6(in Chinese).
[24]
王璞,王承民,张焰,等.城市配电网规划中变电站最佳供电半径及容量的实用计算方法[J].电气应用,2011,30(23):38-41.Wang Pu,Wang Chengmin,Zhang Yan,et al.Practical calculation method of the optimal power substation radius and capacity of urban distribution network planning[J].Power Distribution,2011,30(23):38-41(in Chinese).