曾庆禹.特高压交直流输电系统可靠性分析[J].电网技术,2013,37(10):2681-2688.Zeng Qingyu.Analysis on reliability of UHVDC transmission systems[J].Power System Technology,2013,37(10):2681-2688(in Chinese).
[2]
赵渊,张进,芦晶晶,等.大电网可靠性评估的卷积计算模型[J].电网技术,2013,37(9):2467-2473.Zhao Yuan,Zhang Jin,Lu Jingjing,et al.A convolution model for bulk power grid reliability evaluation[J].Power System Technology,2013,37(9):2467-2473 (in Chinese).
[3]
暴英凯,王越,唐俊熙,等.序贯蒙特卡洛方法在电力系统可靠性评估中的应用差异分析[J].电网技术,2014,38(5):1189-1195.Bao Yingkai,Wang Yue,Tang Junxi,et al.Analysis on differences of applying sequential Monte Carlo mehtods in power gird reliability assessment[J].Power System Technology,2014,38(5):1189-1195(in Chinese).
[4]
梁惠施,程林,刘思革.基于蒙特卡罗模拟的含微网配电网可靠性评估[J].电网技术,2011,35(10):76-81.Liang Huishi,Cheng Lin,Liu Sige.Monte Carlo simulation based reliability evaluation of distribution system containing microgrids[J].Power System Technology,2011,35(10):76-81(in Chinese).
[5]
丁明,张瑞华.发输电组合系统可靠性评估的蒙特卡罗模拟[J].电网技术,2000,24(3):9-12.Ding Ming,Zhang Ruihua.Monte-Carlo simulation of reliability evaluation for composite generation and transmission system[J].Power System Technology,2000,24(3):9-12(in Chinese).
[6]
Billinton R,Li W.Reliability assessment of electric power systems using Monte Carlo methods[M].New York:Plenum Press,1994:35-36.
[7]
Olveira G C,Pereira M V F,Cunha S H F.A technique for reducing computational effort in Monte-Carlo based composite reliability evaluation[J].IEEE Transactions on Power Systems,1989,4(4):1309-1315.
[8]
Melo A C G,Olveira G C,Morozowski F M,et al.A hybrid algorithm for Monte Carlo enumeration/based composite reliability evaluation [C]//Proceedings of 3rd International Conference on Probabilistic Methods Applied to Electric Power Systems.London,1991:70-74.
[9]
Lieber D,Nemirovskii A,Rubinstein R Y.A fast Monte Carlo method for evaluating reliability indexes [J].IEEE Transactions on Reliability,1999,48(3):256-261.
[10]
宋晓通,谭震宇.改进的重要抽样法在电力系统可靠性评估中的应用[J].电网技术,2005,29(13):56-59.Song Xiaotong,Tan Zhenyu.Application of improved importance sampling method in power system reliability evaluation[J].Power System Technology,2005,29(13):56-59 (in Chinese).
[11]
汪新槐.多维数值积分的数论方法及其在结构可靠度分析中的应用[D].南京:河海大学,2005.
[12]
董成.拟蒙特卡罗方法在亚式期权敏感性参数估计中的应用[D].北京:清华大学,2011.
[13]
Boyle P,Broadie M,Glasserman P.Monte Carlo methods for security pricing[J].Journal of Economic Dynamics and Control,1997,21(8):1267-1321.
[14]
Hongzhe Dai,Wei Wang.Application of low-discrepancy sampling method in structural reliability analysis[J].Structural Safety,2009,31(1):55-64.
[15]
Singhee A,Rutenbar R Why Quasi-Monte Carlo is better than Monte Carlo or Latin hypercube sampling for statistical circuit analysis[J].IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems,2010,29(11):1763-1776.
[16]
雷桂媛.关于蒙特卡罗及拟蒙特卡罗方法的若干研究[D].杭州:浙江大学,2003.
[17]
Niederreiter H.Random number generation and quasi-Monte Carlo methods[M].SIAM,Philadelphia,1992.
[18]
Halton J H.On the efficiency of certain quasi-random sequences of points in evaluating multi-dimensional integrals[J].Numer.Math,1960,2(1):84-90.
[19]
Niederreiter H.Low-discrepancy and low-dispersion sequences[J].Number Theory,1988,30(1):51-70.
[20]
Sobol’ I M.The distribution of points in a cube and the approximate evaluation of integrals(English translation)[J].USSR Comp Math Math Phys,1967,7(4):86-112.
[21]
Antonov I A,Saleev V M.An economic method of computing LP τ-sequences(English translation) [J].USSR Comput Math and Math Phys,1979,19(1):252-256.
[22]
王晶.电力系统可靠性评估中的抽样方法研究[D].济南:山东大学,2007.
[23]
王锡凡.电力系统规划基础[M].北京:中国电力出版社,1994:53-56.
[24]
Reliability Test System Task Force.The IEEE Reliability TestSystem—1996[J].IEEE Transactions on Power Systems,1999,14(3):1010-1020.