全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
电网技术  2015 

考虑风电场灵活性及出力不确定性的机组组合

DOI: 10.13335/j.1000-3673.pst.2015.03.022, PP. 730-736

Keywords: 风电,灵活性,不确定性建模,机组组合,风电接纳能力评估,随机优化

Full-Text   Cite this paper   Add to My Lib

Abstract:

充分利用现有数据采集与监控系统的数据是当前提高风电机组运行可靠性最迅速、有效的方式。首先根据风电场数据采集与监控数据,确定了风电机组状态参数和监测数据

References

[1]  Constantinescu E M,Zavala V M,Rocklin M,et al.A computational framework for uncertainty quantification and stochastic optimization in unit commitment with wind power generation[J].IEEE Trans on Power Systems.2011,26(1):431-441.
[2]  Wang Q,Guan Y,Wang J.A chance-constrained two-stage stochastic program for unit commitment with uncertain wind power output[J].IEEE Trans on Power Systems.2012:27(1):206-215.
[3]  魏韡.电力系统鲁棒调度模型与应用[D].北京:清华大学,2013.
[4]  魏韡,刘锋,梅生伟.电力系统鲁棒经济调度(一)理论基础[J].电力系统自动化.2013,37(17):37-43.Wei Wei,Liu Feng,Mei Shengwei,et al.Robust and economical scheduling methodology for power systems part one theoretical foundations[J].Automation of Electric Power Systems.2013,37(17):37-43(in Chinese).
[5]  魏韡,刘锋,梅生伟.电力系统鲁棒经济调度(二)应用实例[J].电力系统自动化.2013,37(18):60-67.Wei Wei,Liu Feng,Mei Shengwei.Robust and economical scheduling methodology for power systems part two application examples[J].Automation of Electric Power Systems.2013,37(18):60-67(in Chinese).
[6]  Wang Y,Xia Q,Kang C.Unit commitment with volatile node injections by using interval optimization[J].IEEE Trans on Power Systems.2011,26(3):1705-1713.
[7]  Jiang R,Wang J,Zhang M,et al.Two-stageminimax regret robust unit commitment[J].IEEE Trans on Power Systems.2013,28(3):2271-2282.
[8]  Wang Q,Watson J,Guan Y.Contingency-Constrained Unit Commitment[J].IEEE Trans on Power Systems.2013,28(3):2366-2375.
[9]  Zhao L,Zeng B.Robust unit commitment problem with demand response and wind energy[C]//IEEE PES.San Diego:IEEE,2012:1-8.
[10]  第十一届全国人民代表大会常务委员会第十二次会议.中华人民共和国可再生能源法修正案[Z].2009-12-26.
[11]  肖创英,汪宁渤,陟晶,等.甘肃酒泉风电出力特性分析[J].电力系统自动化.2010,34(17):64-67.Xiao Chuangying,Wang Ningbo,Zhi Jing,et al.Analysis of wind power characteristics in Jiuquan of Gansu Province[J].Automation of Electric Power Systems.2010,34(17):64-67(in Chinese).
[12]  汪宁渤.大规模风电送出与消纳[M].北京:中国电力出版社,2012:189-203.
[13]  迟永宁,关宏亮,王伟胜,等.SVC与桨距角控制改善异步机风电场暂态电压稳定性[J].电力系统自动化.2007,31(3):95-100.Chi Yongning,Guan Hongliang,Wang Weisheng,et al.Enhancement of transient voltage stability of induction generator based wind farm by SVC and pitch control[J].Automation of Electric Power Systems.2007,31(3):95-100(in Chinese).
[14]  Zhao J H,Dong Z Y,Xu Z,et al.A statistical approach for interval forecasting of the electricity price[J].IEEE Trans on Power Systems.2008,23(2):267-276.
[15]  Tibshirani R.A comparison of some error estimates for neural network models[J].Neural Computation.1996,8(1):152-163.
[16]  林元烈,梁宗霞.随机数学引论[M].北京:清华大学出版社,2003:137-179.
[17]  Lofberg J.YALMIP: a toolbox for modeling and optimization in MATLAB[C]//IEEE International Symposium on Computer Aided Control Systems Design.Taipei:IEEE,2004:284-289.
[18]  IBM.CPLEX User's Manual 12.4[R].IBM ILOG CPLEX,2011.
[19]  Eirgrid.Wind generation: all island[DB/OL].Dublin:EIRGRID,2014[2014-06-10].http://www.eirgrid.com/operations/systemperformancedata/windgeneration/.
[20]  于尔铿,刘广一,周京阳.能量管理系统[M].北京:科学出版社,1998:1-5.
[21]  Barth R,Soeder L,Weber C,et al.Methodology of the scenario tree tool-deliverable 6.2 (d)[R].Stuttgart:Institute of Energy Economics and the Rational Use of Energy,University of Stuttgart,2006.
[22]  Wang J,Shahidehpour M,Li Z.Security-constrained unit commitment with volatile wind power generation[J].IEEE Trans on Power Systems.2008,23(3):1319-1327.
[23]  Pappala V S,Erlich I,Rohrig K,et al.A stochastic model for the optimal operation of a wind-thermal power system[J].IEEE Trans on Power Systems.2009,24(2):940-950.
[24]  Bertsimas D,Litvinov E,Sun X A,et al.Adaptive robust optimization for the security constrained unit commitment problem[J].IEEE Trans on Power Systems.2013,28(1):52-63.
[25]  Jiang R,Wang J,Guan Y.Robust unit commitment with wind power and pumped storage hydro[J].IEEE Trans on Power Systems.2012,27(2):800-810.
[26]  Wei W,Feng L,Shengwei M.Game theoretical scheduling of modern power systems with large-scale wind power integration[C]//IEEE PES.San Diego:IEEE,2012:1-8.
[27]  孙健,刘斌,刘锋,等.计及预测误差相关性的风电出力不确定性集合建模与评估[J].电力系统自动化.2014,38(18):27-32.Sun Jian,Liu Bin,Liu Feng,et al.Modeling and evaluation of uncertainty set considering wind power prediction error correlation[J].Automation of Electric Power Systems.2014,38(18):27-32(in Chinese).
[28]  Laothumyingyong N,Damrongkulkamjorn P.Security-constrained unit commitment using mixed-integer programming with benders decomposition[C]//International Conference on ECTI-CON.Chaing Mai:IEEE,2010:626-630.
[29]  Wu L,Shahidehpour M,Li T.Stochastic security-constrained unit commitment[J].IEEE Trans on Power Systems.2007,22(2):800-811.
[30]  Barth R U D,Brand H,Meibom P,et al.A stochastic unit-commitment model for the evaluation of the impacts of integration of large amounts of intermittent wind power[C]// International Conference on Probabilistic Methods Applied to Power Systems.Stockholm:IEEE,2006:1-8.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133