电网技术  2015 

基于多级可拓评价法的变电站建设项目功能效果后评价

DOI: 10.13335/j.1000-3673.pst.2015.04.041, PP. 1146-1152

Keywords: substation,construction,project,post-

Full-Text   Cite this paper   Add to My Lib

Abstract:

References

[1]  韦钢,杨毅,王建,等.基于综合评价方法的输变电工程技术后评价[J].电网技术,2010,34(3):112-116. Wei Gang,Yang Yi,Wang Jian,et al.Technical post-evaluation on power transmission and transformation project based on comprehensive evaluation method[J].Power System Technology,2010,34(3):112-116(in Chinese).
[2]  Niu Dongxiao,Zhang Hongyun,Zhou Kun,et al.Fuzzy comprehensive evaluation model based on post economic efficiency evaluation of power plant[C]// 2nd International Conference on Artificial Intelligence,Management Science and Electronic Commerce (AIMSEC).Deng Leng:IEEE,2011:3996-3998.
[3]  李君宏.基于模糊综合评价的输变电工程经济效益后评价研究[J].华北电力大学学报:社会科学版,2012(5):42-44. Li Junhong.Study on post-evaluation of economic benefits for the power transmission and transformation project on fuzzy comprehensive evaluation[J].Journal of North China Electric Power University:Social Sciences,2012(5):42-44(in Chinese).
[4]  Ma Xiufan,Lu Siyao,Zhou Ying.The post-evaluation index system for preparatory work of transmission and transformation projects[C]// Power Engineering and Automation Conference (PEAM),2011.Wuhan:IEEE,2011:363-366.
[5]  王婧,寇凌岳,刘娟,等.电网投资项目全过程后评价体系研究[J].华北电力技术,2012(3):67-70. Wang Jing,Kou Lingyue,Liu Juan,et al.Whole process post evaluation system of grid investment projects[J].North China Electric Power,2012(3):67-70(in Chinese).
[6]  Wang Hong,Lin Zhenzhi,Wen Fushuan,et al.A comprehensive evaluation index system for power system operation[C]// International Conference on Sustainable Power Generation and Supply (SUPERGEN 2012).Hangzhou:IET,2012:1-6.
[7]  曾鸣,鄢帆,田廓,等.基于三角模糊数的智能电网投资效益分析[J].华东电力,2010,38(5):638-641. Zeng Ming,Yan Fan,Tian Kuo,et al.Analysis of investment benefit of smart electric grid based on triangular fuzzy numbers[J].East China Electric Power,2010,38(5):638-641(in Chinese).
[8]  杨卫红,何永秀,李德智,等.模糊区间评价与层次分析相结合的电网改造项目综合后评估方法[J].电网技术,2009,33(5):33-37. Yang Weihong,He Yongxiu,Li Dezhi,et al.Comprehensive post-evaluation method of power network renovation project based on fuzzy interval evaluation and analytic hierarchy process[J].Power System Technology,2009,33(5):33-37(in Chinese).
[9]  Zhang Guiqin,Zhang Wei,Xu Zhifei.Transformer substation construction project postevaluation base on improved gray fuzzy theory[C]// 2011 International Conference on Electric Technology and Civil Engineering (ICETCE).Lushan:IEEE,2011:1829-1832.
[10]  王宗耀,范莉,苏浩益.基于区间数理论的电能质量综合评估模型[J].电力系统保护与控制,2012,40(3):41-45. Wang Zongyao,Fan Li,Su Haoyi.A comprehensive power quality evaluation model based on interval number theory[J].Power System Protection and Control,2012,40(3):41-45(in Chinese).
[11]  曾鸣,邹建平,许文秀,等.基于区间数理论的风力发电全寿命周期减排效益估算[J].电力系统自动化,2011,35(13):17-21. Zeng Ming,Zou Jianping,Xu Wenxiu,et al.Estimation of life-cycle emission reduction benefits for wind power project based on interval-number theory[J].Automation of Electric Power Systems,2011,35(13):17-21(in Chinese).
[12]  王宏,林振智,文福拴,等.基于区间数的黑启动决策方法[J].电力系统自动化,2013,37(11):26-32. Wang Hong,Lin Zhenzhi,Wen Fushuan,et al.A black-start decision-making method based on interval values[J].Automation of Electric Power Systems,2013,37(11):26-32(in Chinese).
[13]  Long Peng,Sheng Gehao,Liu Yadong,et al.A comprehensive assessment on the online monitoring condition for transformer based on the extension theory[C]// 2012 Asia-Pacific on Power and Energy Engineering Conference (APPEEC).Shanghai:IEEE,2012:1-6.
[14]  蔡子龙,束洪春,谢静,等.电动汽车充换电站选址规划的可拓评价研究[J].数学的实践与认识,2013,43(21):72-81. CaiZilong,Shu Hongchun,Xie Jing,et al.Research of the extension evaluation to charging and exchanging station site selection planning for electric vehicle[J].Mathematics in Practice and Theory,2013,43(21):72-81(in Chinese).
[15]  Zhang Juncai,Zhao Jinhui,Qian Xun.Risk assessment of mobile payment system security based on extension theory[C]// 2012 International Conference on Computer Science & Service System (CSSS).Nanjing:IEEE,2012:880-883.
[16]  李蕊,李跃,徐浩,等.基于层次分析法和专家经验的重要电力用户典型供电模式评估[J].电网技术,2014,38(9):2336-2341. Li Rui,Li Yue,Xu Hao,et al.Assessment on typical power supply mode for important power consumers based on analytical hierarchy process and expert experience[J].Power System Technology,2014,38(9):2336-2341(in Chinese).
[17]  张心洁,葛少云,刘洪,等.智能配电网综合评估体系与方法[J].电网技术,2014,38(1):3642-3648. Zhang Xinjie,Ge Shaoyun,Liu Hong,et al.Comprehensive assessment system and method of smart distribution grid[J].Power System Technology,2014,38(1):3642-3648(in Chinese).
[18]  王敬敏,施婷.智能电网评价指标体系的构建[J].华东电力,2012,40(2):193-197. Wang Jingmin,Shi Ting.Construction of evaluation index system for smart grid[J].East China Electric Power,2012,40(2):193-197(in Chinese).
[19]  李泓泽,郭森,唐辉,等.基于改进变权物元可拓模型的电能质量综合评价[J].电网技术,2013,37(3):653-659. Li Hongze,Guo Sen,Tang Hui,et al.Comprehensive evaluation on power quality based on improved matter-element extension model with variable weight[J].Power System Technology,2013,37(3):653-659(in Chinese).
[20]  王敬敏,朱益平.基于模糊层次分析法的变电站建设项目节能综合评价研究[J].华东电力,2012,40(4):552-555. Wang Jingmin,Zhu Yiping.Comprehensive energy-saving evaluation for substation construction projects based on FAHP[J].East China Electric Power,2012,40(4):552-555(in Chinese).
[21]  马丽叶,卢志刚,胡华伟.基于区间数的城市配电网经济运行模糊综合评价[J].电工技术学报,2012,27(8):163-171. Ma Liye,Lu Zhigang,Hu Huawei.A fuzzy comprehensive evaluation method for economic operation of urban distribution network based on interval number[J].Transactions of China Electrotechnical Society,2012,27(8):163-171(in Chinese).
[22]  曾鸣,赵建华,刘宏志,等.基于区间数的分布式电源投资效益分析[J].电力自动化设备,2012,32(8):22-26. Zeng Ming,Zhao Jianhua,Liu Hongzhi,et al.Investment benefit analysis based on interval number for distributed generation[J].Electric Power Automation Equipment,2012,32(8):22-26(in Chinese).
[23]  李汶华,郭均鹏.AHP中判断矩阵的区间权重及其一致性检验[J].系统工程理论方法应用,2004,13(6):530-532. Li Wenhua,Guo Junpeng.Interval weights and consistency check of judgment matrix in the analytic hierarchy process[J].Systems Engineering-Theory Methodology Applications,2004,13(6):530-532(in Chinese).