电网技术  2015 

输电线路差异化运维计划优化

DOI: 10.13335/j.1000-3673.pst.2015.04.034, PP. 1101-1108

Keywords: 输电线路,差异化运维计划,优化模型,多目标拟态物理学优化算法

Full-Text   Cite this paper   Add to My Lib

Abstract:

针对当前输电线路运行与维护工作资源不足、管理粗放等缺陷,提出输电线路差异化运维方法。建立以经济性、安全性、可靠性为目标函数的多目标优化模型,采用约束多目标拟态物理学(multi-objectiveartificialphysicsoptimization,MOAPO)优化算法对该模型进行优化求解,非劣解集修剪采用虚拟力排序法,约束处理采用可行规则法,该算法收敛性能好,解决高维度多目标优化问题时计算速度快,且能有效保持解集分布性。将该模型与优化算法应用于某地区输电网络年度运维计划优化,与遗传算法计算结果的比较,验证了该方法的实用性。

References

[1]  郭云鹏,黄民翔,许旭锋.输变电设备的检修策略[J].华东电力,2006(12):36-41. Guo Yunpeng,Huang Minxiang,Xu Xufeng.Maintenance strategies for transmission and distribution equipment[J].East China Electric Power,2006(12):36-41(in Chinese).
[2]  要焕年.电气设备两种维修制度的比较[J].电网技术,1997,21(5):55-56+61. Yao Huannian.Comparison between two methods for determining time of maintenance outage of electrical equipment-at definite interval,or by state of the equipment[J].Power System Technology,1997,21(5):55-56+61(in Chinese).
[3]  许婧,王晶,高峰,等.电力设备状态检修技术研究综述[J].电网技术,2000,24(8):48-52. Xu Jing,Wang Jing,Gao Feng,et al.A survey of condition based maintenance technology for electric power equipment[J].Power System Technology,2000,24(8):48-52(in Chinese).
[4]  田玲,邢建国.电气设备实施状态维修决策方法的探讨[J].电网技术,2004,28(16):60-63. Tian Ling,Xing Jianguo.Discussion on making decision about electric equipment for condition based maintenance[J].Power System Technology,2004,28(16):60-63(In Chinese).
[5]  刘永梅,盛万兴.基于网络拓扑和遗传算法的配电设备检修计划优化模型[J].电网技术,2007,31(21):11-15. Liu Yongmei,Sheng Wanxing.Optimization model for distribution equipment maintenance scheduling based on network topology and genetic algorithm[J].Power System Technology,2007,31(21):11-15(in Chinese).
[6]  许旭锋,黄民翔,王婷婷,等.基于机会约束2层规划的输电线路检修计划优化[J].电力系统自动化,2009,33(2):25-29. Xu Xufeng,Huang Minxiang,Wang Tingting,et al.Optimization of transmission line maintenance scheduling based on chance-constrained bi-level programming[J].Automation of Electric Power Systems,2009,33(2):25-29(in Chinese).
[7]  丁明,冯永青.发输电设备联合检修安排模型及算法研究[J].中国电机工程学报,2004,24(5):22-27. Ding Ming,Feng Yongqing.Research on the modeling and algorithm to global generator and transmission maintenance scheduling[J].Proceedings of the CSEE,2004,24(5):22-27(in Chinese).
[8]  Yellen J,Al-Khamis T M,Vemuri S,et al.A decomposition approach to unit maintenance scheduling[J].IEEE Trans on Power Systems,1992,7(2):726-733.
[9]  许旭锋,黄民翔,王婷婷,等.供电设备检修优化算法及其在地区电网中的应用[J].电网技术,2009,33(14):31-35. Xu Xufeng,Huang Minxiang,Wang Tingting,et al.Optimization algorithm of power supply equipment maintenance scheduling and its application in regional power network[J].Power System Technology,2009,33(14):31-35(in Chinese).
[10]  林海华,李卫东.输电线路检修计划的优化算法综述[J].继电器,2005(14):87-91. Lin Haihua,Li Weidong.Summarizing the optimized algorithms to transmission line maintenance scheduling[J].Ralay,2005(14):87-91(in Chinese).
[11]  束洪春,胡泽江,谢一工.计及隐性损失的输电线路检修计划优化方法[J].电力系统自动化,2008,32(9):34-38. Shu Hongchun,Hu Zejiang,Xie Yigong.An optimized scheduling method for transmission network maintenance with minimum hidden losses[J].Automation of Electric Power Systems,2008,32(9):34-38(in Chinese).
[12]  Pinto L M V G,Filho J F P,Pereira M V F.A model for the maintenance schedule of an electrical generation transmission system[C]//Proceedings of IEEE International Symposium on Circuits and Systems.Singapore,Piscataway,NY,USA:IEEE,1991:1216-1219.
[13]  魏少岩,徐飞,闵勇.输电线路检修计划模型[J].电力系统自动化,2006,30(17):41-44+49. Wei Shaoyan,Xu Fei,Min Yong.Modeling on maintenance scheduling of transmission lines [J].Automation of Electric Power Systems,2006,30(17):41-44+49(in Chinese).
[14]  刘文颖,谢昶,文晶,等.基于小生境多目标粒子群算法的输电网检修计划优化[J].中国电机工程学报,2013,34(4):141-148+19. Liu Wenying,Xie Chang,Wen Jing,et al.Optimization of transmission network maintenance scheduling based on niche multi-objective particle swarm algorithm [J].Proceedings of the CSEE,2013,34(4):141-148+19(in Chinese).
[15]  李明,韩学山,杨明,等.电网状态检修概念与理论基础研究[J].中国电机工程学报,2011,31(34):43-52+6. Li Ming,Han Xueshan,Yang Ming,et al.Basic concept and theoretical study of condition-based maintenance for power transmission system[J].Proceedings of the CSEE,2011,31(34):43-52+6(in Chinese).
[16]  冯永青,吴文传,张伯明,等.基于可信性理论的输电网短期线路检修计划[J].中国电机工程学报,2007,27(4):65-71. Feng Yongqing,Wu Wenchuan,Zhang Boming,et al.Short-term transmission line maintenance scheduling based on credibility theory[J].Proceedings of the CSEE,2007,27(4):65-71(in Chinese).
[17]  Li W,Korczynski J.A reliability based approach to transmission maintenance planning and its application in BC Hydro system//Power Engineering Society Summer Meeting,Vancouver, BC, Canada,2001:510,515.
[18]  王艳,曾建潮.解决多目标优化问题的拟态物理学优化算法[J].计算机工程,2010,36(20):188-190. Wang Yan,Zeng Jianchao.Artificial physics optimization algorithm solving multi-objective optimization problem[J].Computer Engineering,2010,36(20):188-190(in Chinese).
[19]  Kalyanmoy D,Amrit P,Sameer A,et al.A fast and elitist multi-objective genetic algorithm:NSGA-II[J].IEEE Trans on Evolutionary Computation,2002,6(2):182-197.
[20]  李丽荣,郑金华.基于Pareto Front的多目标遗传算法[J].湘潭大学自然科学学报,2004,26(1):39-41+48. Li Lirong,Zheng Jinhua.Multi-objective genetic algorithm based on Pareto Front[J].Natural Science Journal of Xiangtan University,2004,26(1):39-41+48(in Chinese).
[21]  赖红松,董品杰,祝国瑞.求解多目标规划问题的Pareto多目标遗传算法[J].系统工程,2003,21(5):24-28. Lai Honsong,Dong Pinjie,Zhu Guorui.A Pareto multi-objective genetic algorithm for multi-objective programming problem[J].Systems Engineering,2003,21(5):24-28(in Chinese).
[22]  鲍培明,朱庆保.用于多目标进化的归一化排序非支配集构造方法[J].电子学报,2009,37(9):2010-2015. Bao Peiming,Zhu Qingbao.A technique of building non-dominated set based on normalized sort in evolutionary multi-objective optimization.Acta Electronica Sinica,2009,37(9):2010-2015(in Chinese).
[23]  Deb K.Multi-objective genetic algorithms:problem difficulties and construction of test problems[J].Evolutionary Computation 1999,7(3):205-230.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133