王睿琛,薛安成,毕天姝,等.继电保护装置时变失效率估算及其区域性差异分析[J].电力系统自动化,2012,36(5):11-15. Wang Ruichen,Xue Ancheng,Bi Tianshu,et al.Time-varying failure rate estimation of relay protection devices and their regional differences analysis[J].Automation of Electric Power Systems,2012,36(5):11-15(in Chinese).
[2]
ABB Research Ltd.Reliability calculation for substation automation systems[P].Switzerland:EP 2480941 B1,08.05.2013.
[3]
张沛超,高翔.全数字化保护系统的可靠性及元件重要度分析[J].中国电机工程学报,2008,28(1):77-82. Zhang Peichao,Gao Xiang.Analysis of reliability and component importance for all-digital protective systems[J].Proceedings of the CSEE,2008,28(1):77-82(in Chinese).
[4]
李永丽,李致中,杨维.继电保护装置可靠性及其最佳检修周期的研究[J].中国电机工程学报,2001,21(6):64-66. Li Yongli,Li Zhizhong,Yang Wei.Study of reliability and optimal routine test interval of protective relays[J].Proceedings of the CSEE,2001,21(6):64-66(in Chinese).
[5]
刘守刚.110 kV智能变电站设计及其可靠性分析[D].北京:华北电力大学,2012.
[6]
张沛超,高翔.数字化变电站系统结构[J].电网技术,2006,30(24):73-77. Zhang Peichao,Gao Xiang.System architecture of digitized substation[J].Power System Technology,2006,30(24):73-77(in Chinese).
[7]
韩小涛,尹项根,张哲.故障树分析法在变电站通信系统可靠性分析中的应用[J].电网技术,2004,28(1):56-59. Han Xiaotao,Yin Xianggen,Zhang Zhe.Application of fault tree analysis method in reliability analysis of substation communication system[J].Power System Technology,2004,28(1):56-59(in Chinese).
[8]
Jiang K,Singh C.Reliability modeling of all-digital protection systems including impact of repair[J].IEEE Transactions on Power Delivery,2010,25(2):579-587.
[9]
王勇,韩学山,丁颖,等.基于马尔科夫链的电力系统运行可靠性快速评估[J]. 电网技术,2013,37(2):405-410. Wang Yong,Han Xueshan,Ding Ying,et al.Markov chain-based rapid assessment on operational reliability of power grid[J].Power System Technology,2013,37(2):405-410(in Chinese).
[10]
Damchi Y,Sadeh J.Determination of the optimum routine and selfchecking test time intervals for power system protection considering remote back-up protection system failure[J].IET Generation,Transmission & Distribution,2013,7(10):1163-1171.
[11]
Etemadi A H,Fotuhi-Firuzabad M.Design and routine test optimization of modern protection systems with reliability and economic constraints[J].IEEE Transactions on Power Delivery,2012,27(1):271-278.
[12]
薛安成,罗麟,景琦,等.基于Markov模型的高压输电线继电保护装置风险评估[J].电网技术,2014,38(7):1995-2000. Xue Ancheng,Luo Lin,Jing Qi.Research on Markov model based risk assessment of protective relaying for high voltage transmission line[J].Power System Technology,2014,38(7):1995-2000(in Chinese).
[13]
Billinton R,Fotuhi-Firuzabad M,Sidhu T S.Determination of the optimum routine test and self-checking intervals in protective relaying using a reliability model[J].IEEE Transactions on Power Systems,2002,17(3):663-669.
[14]
Anderson P M,Chintaluri G M,Magbuhat S M,et al.An improved reliability model for redundant protective systems-Markov models[J].IEEE Transactions on Power Systems,1997,12(2):573-578.
樊陈,倪益民,窦仁辉,等.智能变电站过程层组网方案分析[J].电力系统自动化,2011,25(18):67-71. Fan Chen,Ni Yimin,Dou Renhui,et al.Analysis of network scheme for process layer in smart substation[J].Automation of Electric Power Systems,2011,25(18):67-71(in Chinese).
[18]
严骏,李永贵,凌海风,等.基于延迟时间理论的设备点检周期模型[J].解放军理工大学学报:自然科学版,2010(5):557-560. Yan Jun,Li Yonggui,Ling Haifeng,et al.Interval model of spot checking for equipment based on principle of delay time model[J].Journal of PLA University of Science and Technology:Natural Science Edition,2010(5):557-560(in Chinese).
暴英凯,王越,唐俊熙,等.序贯蒙特卡洛方法在电力系统可靠性评估中的应用差异分析[J].电网技术,2014,38(5):1189-1195. Bao Yingkai,Wang Yue,Tang Junxi,et al.Analysis on differences of applying sequential Monte Carlo methods in power gird reliability assessment[J].Power System Technology,2014,38(5):1189-1195(in Chinese).