朱凌志,陈宁,韩华玲.风电消纳关键问题及应对措施分析[J].电力系统自动化,2011,35(22):29-34. Zhu Lingzhi,Chen Ning,Han Hualing.Key problems and solutions of wind power accommodation[J].Automation of Electric Power System,2011,35(22):29-34(in Chinese).
[3]
Banakar H,Luo Changling,Boon T O.Impacts of wind power minute-to-minute variations on power system operation[J].IEEE Trans on Power Systems,2008,23(1):150-160.
[4]
Makarov Y,Loutan C,Ma Jian,et al.Operational impacts of wind generation on California power systems[J].IEEE Trans on Power Systems,2009,24(2):1039-1050.
[5]
Holttinen H.Impact of hourly wind power variations on the system operation in the Nordic countries[J].Wind Energy,2005,8(2):197-218.
[6]
张宁,周天睿,段长刚,等.大规模风电场接入对电力系统调峰的影响[J].电网技术,2010,34(1):152-158. Zhang Ning,Zhou Tianrui,Duan Changgang,et al.Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J].Power System Technology,2010,34(1):152-158(in Chinese).
[7]
林旻,朱艳卉,胡百林.基于供电成本的峰谷时段划分及分时电价研究[J].华东电力,2005,33(12):90-91. Lin Min,Zhu Yanhui,Hu Bailin.Peak and valley periods division and time-of-use price based on power generation cost[J].East China Electric Power,2005,33(12):90-91(in Chinese).
[8]
丁宁,吴军基,邹云.基于DSM的峰谷时段划分及分时电价研究[J].电力系统自动化,2001,25(23):9-13. Ding Ning,Wu Junji,Zou Yun.Research of peak and valley time period partition approach and TOU price on DSM[J].Automation of Electric Power System,2001,25(23):9-13(in Chinese).
[9]
翟娜娜.基于用户需求响应的峰谷时段划分研究[D].北京:华北电力大学,2011.
[10]
李晖,康重庆,夏清.考虑用户满意度的需求侧管理价格决策模型[J].电网技术,2004,28(23):1-6. Li Hui,Kang Chongqing,Xia Qing.Price based decision making for demand side management considering customer satisfaction index[J].Power System Technology,2004,28(23):1-6(in Chinese).
[11]
丁伟,袁家海,胡兆光.基于用户价格响应和满意度的峰谷分时电价决策模型[J].电力系统自动化,2005,29(20):10-14. Ding Wei,Yuan Jiahai,Hu Zhaoguang.Time-of-use price decision model considering users reaction and satisfaction index[J].Automation of Electric Power System,2005,29(20):10-14(in Chinese).
[12]
阮文骏,王蓓蓓,李扬,等.峰谷分时电价下的用户响应行为研究[J].电网技术,2012,36(7):86-93. Ruan Wenjun,Wang Beibei,Li Yang,et al.Customer response behavior in time-of-use price[J].Power System Technology,2012,36(7):86-93(in Chinese).
[13]
李强,袁越,李振杰,等.考虑峰谷电价的风电-抽水蓄能联合系统能量转化效益研究[J].电网技术,2009,33(6):13-18. Li Qiang,Yuan Yue,Li Zhenjie,et al.Research on energy shifting benefits of hybrid wind power and pumped hydro storage system considering peak-valley electricity price[J].Power System Technology,2009,33(6):13-18(in Chinese).
[14]
王卿然,谢国辉,张粒子.含风电系统的发用电一体化调度模型[J].电力系统自动化,2011,35(5):15-18. Wang Qingran,Xie Guohui,Zhang Lizi.An integrated generation-consumption dispatch model with wind power[J].Automation of Electric Power Systems,2011,35(5):15-18(in Chinese).
[15]
姚明涛,胡兆光,张宁.工业负荷提供辅助服务的多智能体响应模拟[J].中国电机工程学报,2014,34(25):4219-4226. Yao Mingtao,Hu Zhaoguang,Zhang Ning,et al.Multi-agent response simulation of industrial loads for ancillary services[J].Proceedings of the CSEE,2014,34(25):4219-4226(in Chinese).
[16]
杨冬锋,周苏荃,鲍锋.风电并网系统低谷时段的调峰能力分析[J].电网技术,2014,38(6):1446-1451. Yang Dongfeng,Zhou Suquan,Bao Feng.Analysis on peak load regulation capability of power grid integrated with wind farms in valley load period[J].Power System Technology,2014,38(6):1446-1451(in Chinese).
[17]
刘德伟,黄越辉,王伟胜,等.考虑调峰和电网输送约束的省级系统风电消纳能力分析[J].电力系统自动化,2011,35(22):77-81. Liu Dewei,Huang Yuehui,Wang Weisheng,et al.Analysis on provincial system capability of accommodating wind power considering peak load dispatch and transmission constraints[J].Automation of Electric Power Systems,2011,35(22):77-81(in Chinese).
[18]
杨宏,刘建新,苑津莎.风电系统中常规机组负调峰能力研究[J].中国电机工程学报,2010,30(16):26-31. Yang Hong,Liu Jianxin,Yuan Jinsha.Research of peak load regulation of conventional generators in wind power grid[J].Proceedings of the CSEE,2010,30(16):26-31(in Chinese).