张翔,肖小玲,徐光佑.一种确定高斯核模型参数的新方法[J].计算机工程,2007,33(12):52-53.Zhang Xiang,Xiao Xiaoling,Xu Guangyou.A new method for determining the parameter of gaussian kernal[J].Computer Engineering,2007,33(12):52-53.
[5]
国家发展和改革委员会.可再生能源中长期发展规划[R].北京:国家发展和改革委员会,2007.
[6]
Yianis G,Dimitis G,Vaggelis P.Coupling of a mesoscale atmospheric prediction system with a CFD microclimate model for production forecasting of wind farms in complex terrain[C]//European Wind Energy Conference & Exhibition.Athens,Greece:EWEA,2006:1-10.
[7]
Giebel G,Badger J, Marti Perez I.Short-term forecasting using advanced physical modelling-the results of the anemos project results from mesoscale, microscale and CFD modeling[C]//European Wind Energy Conference.Athens,Greece:EWEA,2005:1-29.
[8]
Smith B,Link H,Randall G,et al.Applicability of nacelle anemometer measurements for use in turbine power performance tests[C]//Wind Power 2002 Conference.Oregon,USA:AWEA,2002:1-20.
[9]
Hossieni A,Rasouli V,Rasouli S.Wind energy potential assessment in order to produce electrical energy for case study in Divandareh, Iran [C]//2014 International Conference on Renewable Energy Research and Application(ICRERA).Milwaukee,WI:IEEE,2014:133-137.
[10]
姜文玲,冯双磊,孙勇,等.基于机舱风速数据的风电场弃风电量计算方法研究[J].电网技术,2014,38(3):647-652.Jiang Wenling,Feng Shuanglei,Sun Yong,et al.Study on energy loss calculation during wind power curtailment based on wind speed measured by turbine nacelle anemometers[J].Power System Technology,2014,38(3):647-652.
[11]
任华,姚秀萍,张新燕,等.风电场弃风电量统计方法研究[J].华东电力,2013,41(10):2148-2152.Ren Hua,Yao Xiuping,Zhang Xinyan,et al.Statistical method for wind farm abandoned wind power[J].East China Electric Power,2013,41(10):2148-2152.
[12]
宋颖巍,万杰,刘岩,等.基于修正风速的风电并网运行弃风电量评估[J].电气应用,2014,33(23):42-45.Song Yingwei,Wan Jie,Liu Yan,et al.Wind power integration curtailment electricity assessment based on improved wind speed[J].Electrotechnical Application,2014,33(23):42-45.
[13]
冯双磊,王伟胜,刘纯,等.风电场功率预测物理方法研究[J].中国电机工程学报,2010,30(2):1-6.Feng Shuanglei,Wang Weisheng,Liu Chun,et al.Study on the physical approach to wind power prediction[J].Proceedings of the CSEE,2010,30(2):1-6.
[14]
冯双磊,王伟胜,刘纯,等.基于物理原理的风电场短期风速预测研究[J].太阳能学报,2011,32(5):611-616.Feng ShuangLei,Wang Weisheng,Liu Chun,et al.Short term wind speed prediction based on physical principle[J].Acta Energiae Solaris Sinica,2011,32(5):611-616.
[15]
陈希孺,柴根象.非参数统计教程[M].上海:华东师范大学出版社,1993:272-287.
[16]
张守一,葛新权,王斌.非参数回归及其应用[J].数量经济技术经济研究,1997(10):60-65.Zhang Shouyi,Ge Xinquan,Wang Bin.Non-parameter regression and applications[J].The Journal of Quantitative & Technical Economics,1997(10):60-65.