静铁岩,吕泉,郭琳,等.水电-风电系统日间联合调峰运行策略[J].电力系统自动化,2011,35(22):97-104.Jing Tieyan,Lv Quan,Guo Lin,et al.An inter-day combined operation strategy of hydro and wind power system for regulating peak load[J].Automation of Electric Power Systems,2011,35(22):97-104(in Chinese).
[2]
尚志娟,周晖,王天华.带有储能装置的风电与水电互补系统的研究[J].电力系统保护与控制,2012,40(2):99-105.Shang Zhijuan,Zhou Hui,Wang Tianhua.Research of complementary system for wind power with energy storage devices and hydro power[J].Power System Protection and Control,2012,40(2):99-105(in Chinese).
[3]
陈森林.电力电量平衡算法及其应用研究[J].水力发电,2004,30(2):8-10.Chen Senlin.Study and application of the algorithm of the electric power and energy balance method[J].Water Power,2004,30(2):8-10(in Chinese).
[4]
曲翀,王秀丽,谢绍宇,等.含风电电力系统随机生产模拟的改进算法[J].西安交通大学学报,2012,46(6):115-121.Qu Chong,Wang Xiuli,Xie Shaoyu,et al.An improved algorithm for probabilistic production simulation of power systems with wind power[J].Journal of Xi’an Jiaotong University,2012,46(6):115-121(in Chinese).
[5]
Zhang N,Kang C,Duan C,et al.Simulation methodology of multiple wind farms operation considering wind speed correlation[J].International Journal of Power & Energy Systems,2010,30(4):264.
[6]
Peter B L,Yu Yaowen,Zhang Bingjie,et al.Grid integration of intermittent wind generation:a Markovian approach[J].IEEE Transactions on Smart Grid,2014,5(2):732-741.
[7]
Santos J M,Pinazo J M,Canada J.Methodology for generating daily clearness index values starting from the monthly average daily value determining the daily sequence using stochastic models[J].Renewable Energy,2003,28:1523-1544.
[8]
王锡凡.电力系统规划基础[M].北京:中国电力出版社,1994:107-126.
[9]
张宁,周天睿,段长刚,等.大规模风电场接入对电力系统调峰的影响[J].电网技术,2010,34(1):152-158.Zhang Ning,Zhou Tianrui,Duan Changgang,et al.Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J].Power System Technology,2010,34(1):152-158(in Chinese).
[10]
刘新东,方科,陈焕远,等.利用合理弃风提高大规模风电消纳能力的理论研究[J].电力系统保护与控制,2012,40(6):35-39.Liu Xindong,Fang Ke,Chen Huanyuan,et al.Research on rational wind power casting theory for large-scale wind power integration improvement[J].Power System Protection and Control,2012,40(6):35-39(in Chinese).
[11]
衣立东,朱敏奕,魏磊,等.风电并网后西北电网调峰能力的计算方法[J].电网技术,2010,34(2):129-132.Yi Lidong,Zhu Minyi,Wei Lei,et al.A Computing method for peak load regulation ability of Northwest China Power Grid connected with large-scale wind farms[J].Power System Technology,2010,34(2):129-132(in Chinese).
[12]
王芝茗,苏安龙,鲁顺.基于电力平衡的辽宁电网接纳风电能力分析[J].电力系统自动化,2010,34(3):86-90.Wang Zhiming,Su Anlong,Lu Shun.Analysis on capacity of wind power integrated into Liaoning Power Grid based on power balance[J].Automation of Electric Power Systems,2010,34(3):86-90(in Chinese).
[13]
王锡凡.电力系统随机生产模拟的等效电量函数法[J].西安交通大学学报,1984,18(6):13-26.Wang Xifan.EEF approach to power system probabilistic modeling[J].Journal of Xi’an Jiaotong University,1984,18(6):13-26(in Chinese).
[14]
王锡凡.包含多个水电机组的电力系统随机生产模拟[J].西安交通大学学报,1985,19(4):69-81.Wang Xifan.Probabilistic simulation of multiple assigned-energy hydroelectric units[J].Journal of Xi’an Jiaotong University,1985,19(4):69-81(in Chinese).
[15]
Carrión M,Arroyo J M.A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem[J].IEEE Transactions on Power Systems,2006,21(3):1371-1378.
[16]
Ting T O,Rao M V C,Loo C K.A novel approach for unit commitment problem via an effective hybrid particle swarm optimization[J].IEEE Transactions on Power Systems,2006,21(1):411-418.