迟永宁,刘燕华,王伟胜,等.风电接入对电力系统的影响[J],电网技术,2007,31(3):77-81.Chi Yongning,Liu Yanhua,Wang Weisheng,et al.Study on impact of wind power integration on power system[J].Power System Technology,2007,31(3):77-81(in Chinese).
[2]
关宏亮,迟永宁,王伟胜,等.双馈变速风电机组频率控制的仿真研究[J].电力系统自动化,2007,31(7):61-65.Guan Hongliang,Chi Yongning,Wang Weisheng,et al.Simulation on frequency control of doubly fed induction generator based wind turbine[J].Automation of Electrical Power Systems,2007,31(7):61-65(in Chinese).
[3]
刘巨,姚伟,文劲宇,等.大规模风电参与系统频率调整的技术展望[J].电网技术,2014,38(3):638-646.Liu Ju,Yao Wei,Wen Jinyu,et al.Prospect of technology for large-scale wind farm participating into power grid frequency regulation[J].Power System Technology,2014,38(3):638-646(in Chinese).
[4]
孙元章,吴俊,李国杰.风力发电对电力系统的影响[J].电网技术,2007,31(20):55-62.Sun Yuanzhang,Wu Jun,Li Guojie.Influence research of wind power generation on power systems[J].Power System Technology,2007,31(20):55-62(in Chinese).
[5]
Banakar H,Luo C L,Ooi B T.Impacts of wind power minute-to-minute variations on power system operation[J].IEEE Transactions on Power Systems,2008,23(1):150-160.
[6]
丁立,乔颖,鲁宗相,等.高比例风电对电力系统调频指标影响的定量分析[J].电力系统自动化,2014,38(14):1-8.Ding Li,Qiao Ying,Lu Zongxiang,et al.Impact on frequency regulation of power system from wind power with high penetration[J].Automation of Electrical Power Systems,2014,38(14):1-8(in Chinese).
[7]
董博,许晓艳,马烁,等.基于长过程动态仿真的风电接入对系统频率控制影响研究[J].电力系统保护与控制,2014,42(12):57-64.Dong Bo,Xu Xiaoyan,Ma Shuo,et al.Influence study of wind power on system frequency control based on long-term dynamic simulation[J].Power System Protection and Control,2014,42(12):57-64(in Chinese).
[8]
Luo C L,Far H G,Banakar H,et al.Estimation of wind penetration as limited by frequency deviation[J].IEEE Transactions on Energy Conversion,2007,22(3):783-791.
[9]
王伟胜,范高锋,赵海翔.风电场并网技术规定比较及其综合控制系统初探[J].电网技术,2007,31(18):73-77.Wang Weisheng,Fan Gaofeng,Zhao Haixiang.Comparison of technical regulations for connecting wind farm to power grid and preliminary research on its integrated control system[J].Power System Technology,2007,31(18):73-77(in Chinese).
ESB National Grid.Wind farm power station grid code provisions[Z].Ireland,2002.
[12]
Eltra.Specifications for connecting wind farms to the transmission networks Second edition[Z].Denmark,2002.
[13]
王颖,张凯锋,付嘉渝,等.抑制风电爬坡率的风储联合优化控制方法[J].电力系统自动化,2013,37(13):17-23.Wang Ying,Zhang Kaifeng,Fu Jiayu,et al.Optimization control method of wind/storage for suppressing wind power ramp rate[J].Automation of Electrical Power Systems,2013,37(13):17-23(in Chinese).
[14]
Kundur P.Power system stability and contrl[M].NewYork:McGrawHill,1994:581-602.
[15]
唐聪岚,卢继平,谢应昭,等.基于改进数据流在线分割的超短期负荷预测[J].电网技术,2014,38(7):2014-2020.Tang Conglan,Lu Jiping,Xie Yingzhao,et al.Improved data stream on-line segmentation based ultra short-term load forecasting[J].Power System Technology,2014,38(7):2014-2020(in Chinese).
Grigg C,Wong P,Albrecht P,et al.The IEEE reliability test system-1996, a report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee[J].IEEE Transactions on Power Systems,1999,14(3):1010-1020.