徐志远, 才庆祥, 刘宪权. 安太堡露天煤矿采区转向过渡若干问题及对 策[J]. 煤炭工程, 2006(12): 9-11. Xu Zhiyuan, Cai Qingxiang, Liu Xianquan. Several problems and countermeasures on mining block direction change period of Antaibao Open Pit Mine[J]. Coal Engineering, 2006(12): 9-11.
张防修. 大型露天煤矿采区转向过渡开拓运输系统的研究[J]. 露天采 矿技术, 2007(6), 1-3. Zhang Fangxiu. Research on block steering transition and development transport system in large surface coal mine[J]. Opencast Coal Mining Technology, 2007(6): 1-3.
[4]
顾正洪, 李曙光. 近水平缓倾斜露天矿开采程序探讨[J]. 化工矿山技 术, 1993, 22(1): 10-13. Gu Zhenghong, Li Shuguang. Research on mining sequence for flat or gentle inclined surface mines[J]. Industrial Minerals & Processing, 1993, 22(1): 10-13.
[5]
马进岩. 条区转向接续期间排土系统优化[J]. 露天采煤技术, 2002(6): 9-10. Ma Jingyan. Dumping system optimization while strip zones converse direction during the continual period[J]. Opencast Coal Mining Technology, 2002(6): 9-10.
[6]
Liu G W, Bai R C, Zhao J C. Research on three-dimensional template driven simulation of open pit mining[C]. International Conference on Computer Application and System modeling, Taiyuan, China, October 22-24, 2010.
[7]
刘光伟, 白润才, 曹兰柱. 基于多层DEM的露天矿三维地质模型构建 及其应用[J]. 煤炭工程, 2010(9): 73-75. Liu Guangwei, Bai Runcai, Cao Lanzhu. Establishment and application of surface mine 3D geological model base on multi DEM[J]. Coal Engineering, 2010(9): 73-75.
[8]
刘光伟, 白润才, 赵浩. 露天矿数字开采过程仿真及其应用[J]. 科技导 报, 2011, 29(34): 41-44. Liu Guangwei, Bai Runcai, Zhao Hao. Simulation of digital exploration process and its application in surface mine[J]. Science & Technology Review, 2011, 29(34): 41-44.
[9]
刘宪权, 李志强, 史建华. 分区开采转向接续期间存在的问题及对策[J]. 露天采煤技术, 2001(4): 8-9. Liu Xianquan,