Brown D. The US hot dry rock program-20 years of experience in reser-voir testing[C]. World Geothermal Congress, Florence, Italy, May 18-31, 1995.
[2]
张慧. 新型旋转防喷器的设计研究[D]. 成都: 西南石油大学, 2007. Zhang Hui. Research and design of new type rotating blowout preventer[D]. Chengdu: Southwest Petroleum University, 2007.
[3]
万秀琦. 旋转防喷液压控制系统研制[D]. 山东: 中国石油大学(华 东), 2008. Wan Xiuqi. Research and development of RBOP hydraulic control system[D]. Shandong: China University of Petroleum, 2008.
[4]
Finger J, Blankenship D. Handbook of best practices for geothermal drilling[M]. New mexico: Sandia National Laboratories, 2010.
[5]
Anderson I. Blowout blights future of Hawaii's geothermal power[J]. New Scientist, 1991, 131: 17.
[6]
Meier U, Ernst P L. Drilling and completion of the Urach III HDR test well[C]. The International Conference on Geothermal Drilling and Com-pletion Technology, Hannover, Germany, January 21-23, 1981.
[7]
杨庆理. 石油天然气钻井井控[M]. 北京: 石油工业出版社, 2008. Yang Qingli. Oil and gas well control[M]. Beijing: Petroleum Industry Press, 2008.
[8]
罗宁根. FX28-35型旋转防喷器的研制[J]. 海洋石油, 2003, 23(12S): 106-110. Luo Ninggen. The design and manufacture of FX28-35 type of rotating blowout preventer[J]. Offshore Oil, 2003, 23(12S): 106-110.
金迅. 旋转控制头工作机理研究及结构设计[D]. 成都: 西南石油大 学, 2004: 3. Jin Xun. Research and design of rotary control head[D]. Chengdu: Southwest Petroleum University, 2004: 3.