唐洪俊, 钟水清, 徐永高, 等. 用不稳定试井确定气井产能方法的评价与研究[J]. 钻采工艺, 2006, 29(3): 31-32. Tang Hongjun, Zhong Shuiqing, Xu Yonggao, et al. Evaluation and research of determining gas well deliverability method by using nonstabilized well test[J]. Drilling & Production Technology, 2006, 29 (3): 31-32.
[2]
李治平, 赵必荣, 张敏渝, 等. 应用气井压力恢复曲线确定气井产能[J]. 天然气工业, 1998, 18(6): 63-65. Li Zhiping, Zhao Birong, Zhang Minyu, et al. By use of the pressure build-up curve of gas well to determine its productivity[J]. Natural Gas Industry, 1998, 18(6): 63-65.
[3]
唐洪俊, 赵必荣. 用压力恢复试井资料预测气井产能的新方法[J]. 钻采工艺, 1996, 19(6): 41-43. Tang Hongjun, Zhao Birong. Evaluation and research of determining gas well deliverability method by using the pressure build-up test[J]. Drilling & Production Technology, 1996, 19(6): 41-43.
[4]
陈元千. 气井垂直管流计算方法的推导与应用[J]. 断块油气田, 2010, 17(4): 443-447. Chen Yuanqian. Derivation and application of calculating methods of vertical pipe fiow in gas wells[J]. Fault-Block Oil & Gas Field, 2010, 17(4): 443-447.
[5]
李士伦. 天然气工程[M]. 北京: 石油工业出版社, 2008. Li Shilun. Natural gas engineering[M]. Beijing: Petroleum Industry Press, 2008.
Jensen C L, Mayson H J. Evluation of permeability determined from repeat formation tester measurements made in the Prudhoe Bay field[C]// SPE 60th Annual Technical Conference, Las Vegas, USA, September 22-25, 1985.
[8]
Yildiz Turhan, Langlinais Julius. A reservoir model for wireline formation testing[C]//SPE Rocky Mountain Regional/Low Permeability Reservoirs Symposium, Denver, USA, March 6-8, 1990.
[9]
Semmelbeck M E, Dewan J T, Holditch S A. Invasion-based method for estimating permeability from logs[C]//SPE Annual Technical Conference, Dalas, USA, October 22-25, 1995.
[10]
Akram A H, Fitzpatrick A J, Halford F R. A model to predict wireline formation tester sample contamination[C]//SPE Annual Technical Conference, New Orleans, Louisiana, USA, September 27-30, 1998.