回填施工对覆土波纹钢板拱桥受力性能的影响

, PP. 22-28

Keywords: 桥梁工程,覆土波纹钢板拱桥,回填施工,受力性能,有限元分析,施工控制

Full-Text   Cite this paper   Add to My Lib

Abstract:

根据有限元软件和内蒙古某座拱桥参数,用beam3二维梁单元模拟波纹钢板,用plan42二维实体单元模拟回填土体,建立了考虑回填高度与拱圈相互作用的平面模型,计算了不同回填高度下的拱圈弯矩和轴力,分析了回填高度对拱圈应力和变形的影响。计算结果表明在对称回填施工过程中,拱圈最大径向绝对位移约为0.9mm,拱圈最大、最小应力分别约为10-、27MPa;在不对称回填施工过程中,拱圈最大径向绝对位移约为1.4mm,拱圈最大、最小应力分别约为12、-18MPa,且最大径向绝对位移和最大应力均出现在拱圈右侧的1/8跨度附近。在回填施工过程中,应重点监控拱圈右侧1/8跨度附近拱圈的应力和变形。

References

[1]  白义松,高 伟,李洪峰.波纹钢管涵洞在公路工程中的应用研究[J].森林工程,2008,24(2):28-30. BAI Yi-song, GAO Wei, LI Hong-feng. Application research of corrugated steel pipe culvert in highway engineering[J]. Forest Engineering, 2008, 24(2): 28-30.(in Chinese)
[2]  刘 戈,符 进,章金钊.多年冻土地区金属波纹管涵设计[J].公路,2008(9):315-318. LIU Ge, FU Jin, ZHANG Jin-zhao. Design of corrugated metal culvert in the region of frozen soil[J]. Highway, 2008(9): 315-318.(in Chinese)
[3]  王军刚,刘 强.钢波纹管涵在山区高速公路中的应用[J].中外公路,2009,29(2):165-168. WANG Jun-gang, LIU Qiang. Application of corrugated steel culvert in highway of mountain area[J]. Journal of China and Foreign Highway, 2009, 29(2): 165-168.(in Chinese)
[4]  WEBB M C. Improved design and construction of large-span culverts[D]. Amherst: University of Massachusetts, 1999.
[5]  FLENER E B, KAROUMI R, SUNDQUIST H. Field test-ing of a long-span arch steel culvert during backfilling and in service[J]. Structure and Infrastructure Engineering, 2005, 1(3): 181-188.
[6]  FLENER E B. Soil-steel interaction of long-span box culverts―performance during backfilling[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2010, 136(6): 823-832.
[7]  MANKO Z Z, BEBEN D. Tests during three stages of construction of a road bridge with a flexible load-carrying structure made of super cor type steel corrugated plates interacting with soil[J]. Journal of Bridge Engineering, 2005, 10(5): 570-591.
[8]  MANKO Z Z, BEBEN D. Research on steel shell of a road bridge made of corrugated plates during backfilling[J]. Journal of Bridge Engineering, 2005, 10(5): 592-603.
[9]  黄 豪,赵雷鸣,邹志强,等.高填方涵洞分层回填的数值模拟和土压力分析[J].交通与计算机,2008,26(1):96-98. HUANG Hao, ZHAO Lei-ming, ZOU Zhi-qiang, et al. Numerical simulation and earth pressure analysis of backfilling in layers for high embankment culvert[J]. Computer and Communications, 2008, 26(1): 96-98.(in Chinese)
[10]  徐群丽,季文玉.青藏线波纹管涵洞现场试验及理论分析[J].中国铁道科学,2006,27(6):55-59. XU Qun-li, JI Wen-yu. Field test and theoretical analysis of corrugated pipe culvert on Qinghai-Tibet Railway[J]. China Railway Science, 2006, 27(6): 55-59.(in Chinese)
[11]  张 峰.覆土波纹钢板拱桥模型试验和有限元分析[D].北京:北京交通大学,2008. ZHANG Feng. Experimental study and finite element analysis of a tested buried corrugated steel arch bridge[D]. Beijing: Beijing Jiaotong University, 2008.(in Chinese)
[12]  CAN/CSA-S6-00, Canadian highway bridge design code[S].
[13]  范 鹤,付春辉,范 泽.考虑不同填土参数的高填土涵洞土压力分布研究[J].北方交通,2008(10):31-34. FAN He, FU Chun-hui, FAN Ze. Research on earth pressure distribution of high earth fill culvert under different parameter of earth filling[J]. Northern Communications, 2008(10): 31-34.(in Chinese)