KISHK M, Al-HAJJ A. Fuzzy modelling of life cycle costs of alternatives with different lives[C]∥Glasgow Caledonian University. The 16th Annual Conference of the Association of Researchers in Construction Management(ARCOM). Glasgow: IEEE, 2000: 92-101.
[3]
KISHK M, Al-HAJJ A. A fuzzy model and algorithm to handle subjectivity in life cycle costing based decision-making[J]. Journal of Financial Management of Property and Construction, 2000, 5(1/2): 93-104.
[4]
JUN H K, KIM J H. Life cycle cost modeling for railway vehicle[C]∥Korea Railroad Research Institute. Proceeding of International Conference on Electrical Machines and Systems. Seoul: IEEE, 2007: 1989-1994.
[5]
董士波.全寿命周期工程造价管理研究[D].哈尔滨:哈尔滨工程大学,2003. DONG Shi-bo. The research on the whole life cycle engineering cost management[D]. Harbin: Harbin Engineering University, 2003.(in Chinese)
[6]
何毅斌.基于寿命周期费用理论的决策支持系统研究及软件设计[D].武汉:武汉理工大学,2004. HE Yi-bin. Study of the decision support system based on the life cycle cost theory and its software[D]. Wuhan: Wuhan University of Technology, 2004.(in Chinese)
[7]
李丽敏,顾天鸿,陈进杰.关于降低我国地铁造价的探讨[J].国防交通工程与技术,2005(4):6-8,17. LI Li-min, GU Tian-hong, CHEN Jin-jie. On how to reduce the costs of the metro system in our country[J]. Traffic Engineering and Technology for National Defence, 2005(4): 6-8, 17.(in Chinese)