徐 意,田长海,方琪根.以客运为主单线铁路通过能力计算方法[J].中国铁道科学,2003,24(4):127-129. XU Yi, TIAN Chang-hai, FANG Qi-gen. Exporation for calulation method of passenger train dominated single-train line capacity[J]. China Railway Science, 2003, 24(4): 127-129.(in Chinese)
[2]
[6 ] 赵丽珍.高速铁路区间通过能力计算与分析[J].中国铁道科学,2001,22(6):54-58. ZHAO Li-zhen. Calculation and analysis of carrying capacity of high-speed railway section[J]. China Railway Science, 2001, 22(6): 54-58.(in Chinese)
[3]
苏顺虎,田长海,陈治亚.客运专线通过能力的分析计算[J].中国铁道科学,2008,29(5):119-124. SU Shun-hu, TIAN Chang-hai, CHEN Zhi-ya. Analysis and calculation of the carrying capacity on passenger dedicated lines[J]. China Railway Science, 2008, 29(5): 119-124.(in Chinese)
[4]
姜 兴,吴其刚,杜 鹏.铁路双线自动闭塞区间通过能力计算方法研究[J].铁道运输与经济,2008,30(11):84-87. JIANG Xing, WU Qi-gang, DU Peng. Study on carrying capacity calculation of automatic block section of double-tracked railways[J]. Railway Transport and Economy, 2008, 30(11): 84-87.(in Chinese)
[5]
曲思源.市场经济条件下繁忙干线通过能力研究[D].成都:西南交通大学,2004. QU Si-yuan. Research on the carrying capacity in the busy main line under the situation of market econmomy[D]. Chengdu: Southwest Jiaotong Univercity, 2004.(in Chinese)
[6]
曲思源.春运期间沪宁线增开临客旅行时间的技术分析[J].上海铁道科技,2009(4):8-10. QU Si-yuan. Technical analysis of travel time about added temporary passenger trains in period of spring festival transportation in Huning line[J]. Shanghai Railway Science and Technology, 2009(4): 8-10.(in Chinese)
[7]
张国栋,张国宝.四显示自动闭塞区段区间通过能力的计算[J].同济大学学报:自然科学版,2001,29(10):1181-1184. ZHANG Guo-dong, ZHANG Guo-bao. Study on calculation for section carrying capacity of four-aspect automatic block district[J]. Jouranl of Tongji University: Natural Science, 2001, 29(10): 1181-1184.(in Chinese)
[8]
孙 焰,季 令,张国宝.双线区段通过能力及相关因素分析[J].铁道学报,2001,23(2):1-7. SUN Yan, JI Ling, ZHANG Guo-bao. Analysis of carrying capacity on double track line and its interrelated effects[J]. Journal of the China Railway Society, 2001, 23(2): 1-7.(in Chinese)
[9]
汤奇志,朱家荷,赵春雷,等. 既有线提速200 km?h-1的线路区间通过能力分析[J].中国铁道科学,2005,26(5):123-127. TANG Qi-zhi, ZHU Jia-he, ZHAO Chun-lei, et al. Analysis and computation of the carrying capacity in the section of existing line speed increase to 200 km?h-1[J]. China Railway Science, 2005, 26(5): 123-127.(in Chinese)