KONINGS R, LUDEMA M. The competitiveness of the river-sea transport system: market perspectives on the United Kingdom-Germany corridor[J]. Journal of Transport Geography, 2000, 8(3): 221-228.
[2]
CHARLES L. Sea-river shipping competitiveness and its geographical market area for the Rhone-Saone corridor[J]. Journal of Transport Geography, 2008, 16(2): 100-116.
[3]
陈顺怀,李俊敏,王呈方.北仑―武钢矿石进江江海直达驳运输船队优化[J].航海工程,2001(4):8-11. CHEN Shun-huai, LI Jun-min, WANG Cheng-fang. Optimal fleet for river-sea going transportation of ore on Beilun-Wuhan Route[J]. Ship and Ocean Engineering, 2001(4): 8-11.(in Chinese)
[4]
秦金娣.武钢进口铁矿石物流系统优化研究[D].武汉:华中科技大学,2006. QIN Jin-di. Study on the optimization of logistics system about imported iron ore in WISCO[D]. Wuhan: Huazhong University of Science and Technology, 2006.(in Chinese)
[5]
朱丽丽.长江中下游进口铁矿石运输模式比较分析[J].综合运输,2008(7):70-71. ZHU Li-li. Comparative analysis on shipping modes of iron ore in the midstream and downstream of Yangtze River[J]. Comprehensive Transportation, 2008(7): 70-71.(in Chinese)
[6]
RISSOAN J P. River-sea navigation in Europe[J]. Journal of Transport Geography, 1994, 2(2): 131-142.
[7]
衡 强.长江至洋山港区江海联运发展战略模式研究[D].南京:河海大学,2007. HENG Qiang. An analysis on the strategy management of transportation mode from Yangtze River to Yangshan Port[D]. Nanjing: Hohai University, 2007.(in Chinese)
[8]
CHRISTIANSEN M, FAGERHOLT K, RONEN D. Ship routing and scheduling: status and perspectives[J]. Transportation Science, 2004, 38(1): 1-18.
[9]
杨秋平,谢新连,赵家保.船队规划研究现状与动态[J].交通运输工程学报,2010,10(4):85-90. YANG Qiu-ping, XIE Xin-lian, ZHAO Jia-bao. Research status and prospect of fleet planning[J]. Journal of Traffic and Transportation Engineering, 2010, 10(4): 85-90.(in Chinese)
[10]
JAIKUMAR M, SOLOMON M M. The tug fleet size problem for barge line operations: a polynomial algorithm[J]. Transportation Science, 1987, 21(4): 264-272.
[11]
谢新连,李树范,纪卓尚,等.船队规划的线性模型研究与应用[J].中国造船,1989,30(3):59-66. XIE Xin-lian, LI Shu-fan, JI Zhuo-shang, et al. Study and application on the linear model of fleet planning[J]. Shipbuilding of China, 1989, 30(3): 59-66.(in Chinese)
[12]
苏绍娟.不确定动态船队规划的数学模型研究[J].中国航海,2008,31(2):158-161. SU Shao-juan. Mathematical model study on uncertain multi-stage fleet planning[J]. Navigation of China, 2008, 31(2): 158-161.(in Chinese)
[13]
MEHREZ A, HUNG M S, AHN B H. An industrial ocean-cargo shipping problem[J]. Decision Science, 1995, 26(3): 395-423.
[14]
AGARWAL R, ERGUN ?. Ship scheduling and network design for cargo routing in liner shipping[J]. Transportation Science, 2008, 42(2): 175-196.
[15]
XIE Xin-lian, WANG Teng-fei, CHEN Dai-song. A dynamic model and algorithm for fleet planning[J]. Maritime Policy and Management, 2000, 27(1): 53-63.
[16]
NICHOLSON T A J, PULLEN R D. Dynamic programming applied to ship fleet management[J]. Operational Research Quarterly, 1971, 22(3): 211-220.