黄伟业,仁廷兵,俞宁一.应加快高速公路飞机跑道建设[J].国防,2002(8):47-48. HUANG Wei-ye, REN Ting-bing, YU Ning-yi. Promoting the construction of highway runway[J]. National Defence, 2002(8): 47-48.(in Chinese)
[2]
康亚林,邱延俊,张 波.新建高速公路跑道几何参数的研究[J].铁道建筑,2007(2):106-108. KANG Ya-lin, QIU Yan-jun, ZHANG Bo. Research on geometric parameters of newly-built highway runway[J]. Railway Engineering, 2007(2): 106-108.(in Chinese)
[3]
周桂新.浅谈高速公路军用飞机跑道建设及养护管理[J].甘肃科技,2003,19(9):102-103. ZHOU Gui-xin. On construction and maintenance management of highway runway from relying[J]. Gansu Science and Technology, 2003, 19(9): 102-103.(in Chinese)
[4]
王金华,岑国平.公路飞机跑道改建各基本要素研究[J].国防交通工程与技术,2005(1):6-9,13. WANG Jin-hua, CEN Guo-ping. A summary of the research into various factors in rebuilding highways into airfield runways [J]. Traffic Engineering and Technology for National Defence, 2005(1): 6-9, 13.(in Chinese)
[5]
MCNERNEY M T, RIOUX T. Geographic information system(GIS)needs assessment for txdot pavement management information systems[R]. Austin: The University of Texas at Austin, 2000.
[6]
暨育雄,阚胜男,孙立军,等.基于GIS的机场道面管理系统[J].交通运输工程学报,2004,4(1):70-74. JI Yu-xiong, KAN Sheng-nan, SUN Li-jun, et al. Airport pavement management system based on GIS[J]. Journal of Traffic and Transportation Engineering, 2004, 4(1): 70-74.(in Chinese)
[7]
徐泽水.求解不确定型多属性决策问题的一种新方法[J].系统工程学报,2002,17(2):177-181. XU Ze-shui. New method for uncertain multi-attribute decision making problems[J]. Journal of Systems Engineering, 2002, 17(2): 177-181.(in Chinese)
[8]
贾 宏,周 波,刘广兵.基于层次分析法的风险模型优势分析[J].西南交通大学学报,2009,44(1):72-76. JIA Hong, ZHOU Bo, LIU Guang-bing. Advantage analysis of risk model based on analytic hierarchy process[J]. Journal of Southwest Jiaotong University, 2009, 44(1): 72-76.(in Chinese)
[9]
荆洪英,张 利,闻邦椿.基于层次分析法的产品设计质量权重分配[J].东北大学学报:自然科学版,2009,30(5):712-715. JING Hong-ying, ZHANG Li, WEN Bang-chun. AHP-based assignment of weight in product design quality[J]. Journal of Northeastern University: Natural Science, 2009, 30(5): 712-715.(in Chinese)
[10]
滕兆新,张 旭.基于理想点的仿真结果评估[J].系统仿真学报,2008,20(5):1377-1379. TENG Zhao-xin, ZHANG Xu. Evaluation for simulation result based on ideal point[J]. Journal of System Simulation, 2008, 20(5): 1377-1379.(in Chinese)
[11]
ZHANG Ji-jun, WU De-sheng, OLSON D L. The method of grey related analysis to multiple attribute decision making problems with interval numbers[J]. Mathematical and Computer Modelling, 2005, 42(9/10): 991-998.
[12]
杨 明,阳 亮.主成分分析法在高速公路沥青路面使用性能评价中的应用[J].中南公路工程,2006,31(6):55-57,89. YANG Ming, YAGN Liang. Application of primary component analysis to the evaluation of expressway asphalt pavement life[J]. Central South Highway Engineering, 2006, 31(6): 55-57, 89.(in Chinese)
[13]
俞 峰,杨成梧.基于熵权的图像分割性能灰色评判[J].兵工学报,2008,29(8):930-934. YU Feng, YANG Cheng-wu. Entropy weight-based grey evaluation of performance of image segmentation[J]. Acta Armamentarii, 2008, 29(8): 930-934.(in Chinese)
[14]
邹 进,张勇传.三峡梯级电站短期优化调度的模糊多目标动态规划[J].水利学报,2005,36(8):925-931. ZOU Jin, ZHAGN Yong-chuan. Short-term optimal scheduling of cascade hydropower stations using fuzzy multi-objective dynamic programming[J]. Journal of Hydraulic Engineering, 2005, 36(8): 925-931.(in Chinese)