包国宪,董 静.政府绩效评价在西方的实践及启示[J].兰州大学学报:社会科学版,2006,34(5):20-26. BAO Guo-xian, DONG Jing. Assessment of government competency: practice in the West and its significance for China[J]. Journal of Lanzhou University: Social Sciences, 2006, 34(5): 20-26.(in Chinese)
[2]
冯鸿雁.财政支出绩效评价体系构建及其应用研究[D].天津:天津大学,2004. FENG Hong-yan. Research on construction and application of the performance assessment system of fiscal expenditure[D]. Tianjin: Tianjin University, 2004.(in Chinese)
[3]
熊崇俊,宁宣熙,潘颖莉.中国综合交通各运输方式协调发展评价研究[J].系统工程,2006,24(6):1-7. XIONG Chong-jun, NING Xuan-xi, PAN Ying-li. Evaluation of coordinated development between Chinese comprehensive transportation modes[J]. Systems Engineering, 2006, 24(6): 1-7.(in Chinese)
[4]
梁国华.公路建设项目社会效益分析与评价[D].西安:长安大学,2003. LIANG Guo-hua. The analysis and evaluation of highway project social benefit[D]. Xian’an: Chang’an University, 2003.(in Chinese)
[5]
张 淼.我国风险投资的决策方法研究[D].长春:吉林大学,2008. ZHANG Miao. Research on decision-making approach of China’s venture capital[D]. Changchun: Jilin University, 2008.(in Chinese)
[6]
郭文明,相景丽,肖凯生.群组AHP权重系数的确定[J].华北工学院学报,2000,21(2):110-113. GUO Wen-ming, XIANG Jing-li, XIAO Kai-sheng. Determin-ation of weight coefficients in group AHP[J]. Journal of North China Institute of Technology, 2000, 21(2): 110-113.(in Chinese)
[7]
刘进生,李书钢.群体判断矩阵的建立及权重计算[J].太原工业大学学报,1995,26(1):91-94. LIU Jin-sheng, LI Shu-gang. The construction of group judgment matrices and the calculation of weights[J]. Journal of Taiyuan University of Technology, 1995, 26(1): 91-94.(in Chinese)
[8]
沈 毅,吴丽娜,王红瑞,等.环境影响后评价的进展及主要问题[J].长安大学学报:自然科学版,2005,25(1):56-59. SHEN Yi, WU Li-na, WANG Hong-rui, et al. Post-project-analysis in environmental impact: development and main problems[J]. Journal of Chang’an University: Natural Science Edition, 2005, 25(1): 56-59.(in Chinese)
[9]
叶耀军,王首军,魏 磊,等.矩阵最大特征值的近似求法[J].河南农业大学学报,2001,35(增1):69-71. YE Yao-jun, WANG Shou-jun, WEI Lei, et al. Approximate computation on the maximum eigenvalue of matrix[J]. Journal of Henan Agricultural University, 2001, 35(Z1): 69-71.(in Chinese)
[10]
毛介英.大型铁路客运站综合交通衔接规划研究[D].成都:西南交通大学,2010. MAO Jie-ying. Research on comprehensive transport connecting planning of large scale passengers railway station[D]. Chengdu: Southwest Jiaotong University, 2010.(in Chinese)
[11]
张建平.在综合运输系统中建设中国铁路[J].交通运输系统工程与信息,2006,6(1):15-18,21. ZHANG Jian-ping. Building China railway in comprehensive transportation system[J]. Journal of Transportation Systems Engineering and Information Technology, 2006, 6(1): 15-18, 21.(in Chinese)
[12]
赵春昶, 陶 丽,潘 瑞.模糊综合评价在管理决策中的应用[J].沈阳建筑工程学院学报:自然科学版,2001,17(4):318-320. ZHAO Chun-chang, TAO Li, PAN Rui. Application of fuzzy synthetic evaluation on polity decision[J]. Journal of Shenyang Architecture and Civil Engineering Insititute: Natural Science, 2001, 17(4): 318-320.(in Chinese)