[1] | 李 电,金百荣,洪金琪,等. 真空断路器投切电容器组性能的现状与对策[J]. 高压电器,2003,39(5):44-46. LI Dian,JIN Bairong,HONG Jinqi,et al. The current situation and countermeasures of switching capacitor bank using vacuum circuit breaker[J]. High Voltage Apparatus,2003,39(5),44-46.
|
[2] | 刘文泽,蔡泽祥,冯顺萍. 并联电容器组中电容器击穿的特征分析与仿真研究[J]. 高压电器,2009,45(5):73-76. LIU Wenze,CAI Zexiang,FENG Shunping. Characteristic analysis and simulation of power capacitor breakdown in shunt capacitor bank[J]. High Voltage Apparatus,2009,45(5):73-76.
|
[3] | 杜 斌,赵 峰,高亚栋,等. 10 kV系统中切除并联电容器时的重燃过电压研究[J]. 高压电器,2004,40(4):255-258. DU Bin,ZHAO Feng,GAO Yadong,et al. Study of restrike overvoltage when switching off shunt capacitors in a 10 kV distribution system[J]. High Voltage Apparatus,2004,40(4),255-258.
|
[4] | 李智敏,南春雷,马 力,等. 并联电容器分闸重击穿操作过电压研究[J]. 电力电容器与无功补偿,2009,30(3):41-47. LI Zhimin,NAN Chunlei,MA Li,et al. Study of restrike overvoltage when switching off shunt capacitors[J]. Power Capacitor & Reactive Power Compensation,2009,30(3),41-47.
|
[5] | 张森峰,商立群. 并联电容器组分闸重燃过电压仿真[J].高压电器,2011,47(12):1-5. ZHANG Senfeng,SHANG Liqun. Simulation of restrike overvoltage due to switching off shunt capacitor bank[J]. High Voltage Apparatus,2011,47(12),1-5.
|
[6] | 安宗贵. 切合并联电容器组暂态过电压问题的研究[J]. 电力电容器,2005,26(2):28-33. AN Zonggui. Research on transient overvoltage caused by switching on/off shunt capacitor bank[J]. Power Capacitor,2005,26(2):28-33.
|
[7] | 尹奎龙,王 帆. 真空开关开断并联电容器组时操作过电压EMTP计算模型的设计与分析[J]. 山东电力技术,2007(4):25-28. YIN Kuilong,WANG Fan. Design and analysis of EMTP computational models switching overvoltage when vacuum switches work to Switch off shunt capacitors[J]. Shandong Electric Power,2007(4):25-28.
|
[8] | 李志兵. 真空开关操作过电压及其保护的研究[D]. 北京:华北电力大学,2001.
|
[9] | 王秉钧. 切断并联电容器组过电压下的MOA的动作负载[J]. 电瓷避雷器,1986(2):7-12. WANG Bingjun. The action load of the MOA under the overvoltage when switching off the shunt capacitor banks[J]. Insulators and Surge Arresters,1986(2):7-12.
|
[10] | NISHIKAWA H,刘乾业. 评价电容器组开关的方法和重燃过电压的抑制[J]. 电力电容器,1987(4):70-77. NISHIKAWA H,LIU Qianye. The method of evaluation the breaker of capacitor banks and the restrike voltage suppression[J]. Power Capacitor,1987(4):70-77.
|
[11] | 陆 华. 配电网并联补偿电容器组操作过电压的研究[D]. 杭州:浙江大学,2006.
|
[12] | DUNSMORE D.Magnification of transient voltage in multivoltage-level,shunt-capacitor-compensated,circuits[C]//IEEE Trans. on PWD.[S.l.]:IEEE,1992:664.
|
[13] | 林 静,胡 红,郭 飞. 变电站投切电容器组过电压研究[J]. 四川电力技术,2010,33(5):11-15. LIN Jing,HU Hong,GUO Fei. Overvoltage research when switching capacitor bank in substation[J]. Sichuan Electric Power Technology,2010,33(5):11-15.
|
[14] | 李 山,何丹东,陈文涛. 高压并联电容器装置过电压研究及应用EMTPE软件仿真验证[J]. 电力电容器与无功补偿,2011,32(5):51-55. LI Shan,HE Dandong CHEN Wentao. Research on overvoltage of HV shunt capacitor and simulation verification by EMTPE[J]. Power Capacitor & Reactive Power Compensation,2011,32(5):51-55.
|
[15] | 吴 磊,李梦玲. 基于EMTP/ATP的并联电容器投切过电压仿真分析[J]. 广东输电与变电技术,2007,5(5):4-10. WU Lei,LI Mengling. Analysis of overvoltage caused by shunt capacitors switching based on EMTP/ATP simulation[J]. Guangdong Power Transmission Technology,2007,5(5):4-10.
|
[16] | 邓雨荣. 无功补偿电容器合闸过电压及涌流的仿真计算[J]. 广西电力,2006,29(6):6-9. DENG Yurong. Simulated calculation of overvoltage and surge current at switch-on of capacitor for reactive power compensation[J]. Guangxi Electric Power,2006,29(6):6-9.
|
[17] | 彭文达,王奇亮. 电容器组过电压阻尼装置及运行结果[J]. 高压电器,2000,36(3):24-26. PENG Wenda,WANG Qiliang. An overvoltage suppression device for capacitor bank and its operation records[J]. High Voltage Apparatus,2000,36(3):24-26.
|
[18] | 邵 昱,王 莉,王 坤,等. 开关操作对串补保护装置运行影响的[J]. 陕西电力,2013,41(2):14-17. SHAO Yu,WANG Li,WANG Kun,et al. Studies on the effects of switch action on the protection of compensation series[J]. Shaanxi Electric Power,2013,41(2):14-17.
|
[19] | 陈汉鹏. 开断电容器组的过电压和真空断路器的选用[J].供用电,1995(5):11-15. CHEN Hanpeng. Study overvoltage of switching off the shunt capacitor banks and the selection of the vacuum circuit breaker[J]. Distribution & Utilization,1995(5):11-15.
|