[1] | 赵婉君. 高压直流输电工程技术[M]. 北京:中国电力出版社,2004. ZHAO Wanjun. HVDC transmission engineering technology[M]. Beijing:China Electric Power Press,2004.
|
[2] | 浙江大学发电教研组直流输电科研组. 直流输电[M]. 北京:电力工业出版社,1982. Transmission Search Team of Power Teaching Group in Zhejiang University.DC transmission[M]. Beijing:Power Electric Industry Press,1982.
|
[3] | 陈 飞,刘 浔,吴剑波,等. 宜都换流站HP11/13交流滤波器电容器改造的可行性分析[J]. 电力电容器与无功补偿,2012,33(6):22-25. CHAN Fei,LIU Xun,WU Jianbo,et al. Feasibility analysis on reconstruction of HP11/13 AC filter capacitors[J]. Power Capacitor & Reactive Power Compensation,2012,33(3):22-25.
|
[4] | 田 庆,原敏宏,王志平,等. 高压直流极母线差动保护不平衡电流分析[J]. 高电压技术,2009,35(4):926-930. TIAN Qing,YUAN Minhong,WANG Zhiping,et al.Analysis on the unbalance current of HVDC pole bus differential protection[J]. High Voltage Engineering,2009,35(4):926-930.
|
[5] | 田 庆,王晓希. 高压直流控制与保护系统配置不当分析[J]. 高压电器,2008,44(5):432-434. TIAN Qing,WANG Xiaoxi. Analysis of the mismatch of HVDC control and protection system[J]. High Voltage Apparatus,2008,44(5):432-434.
|
[6] | 许加柱,罗隆福,刘福生,等. 新型换流变压器的谐波电流分析与计算[J]. 高压电器,2007,43(1):45-48. XU Jiazhu,LUO Longfu,LIU Fusheng,et al. Analysis and calculation of harmonic currents in the novel converter transformer[J]. High Voltage Apparatus,2007,43(1):45-48.
|
[7] | POVH D. Role of HVDC transmission in future energy development[J]. IEEE Power Engineering Review,2000,145(2):10-25.
|
[8] | WEIMERS L S.HVDC light:A new technology for a better environment[J]. IEEE Power Engineering Review,1998,123(8):19-20.
|
[9] | 田 庆,原敏宏,王志平. 葛南直流线路高阻接地故障保护分析[J]. 电力系统及其自动化学报,2008,20(6):60-63. TIAN Qing,YUAN Minhong,WANG Zhiping. Analysis of Ge-Nan HVDC line protection against high-impedance ground fault[J]. Proceedings of the CSU-EPSA,2008,20(6):60-63.
|
[10] | 段力勇,王承民,亚历山大洛夫?戈?尼. 变压器式可控电抗器静态无功功率双向控制原理研究[J]. 电网与清洁能源,2013,29(1):9-15. DUAN Liyong,WANG Chengmin,ALEXANDROV G N. Research on the bidirectional control principle of reactive power based on a transformer type controllable shunting reaction[J]. Power System and Clean Energy,2013,29(1):9-15.
|
[11] | 田 庆. 特高压交流试验示范工程单相人工接地短路实测恢复电压分析[J]. 高压电器,2010,46(2):1-4. TIAN Qing. Analysis on the measured recovery voltage in artificial single-phase grounding test for UHV AC pilot project[J]. High Voltage Apparatus,2010,46(2):1-4.
|
[12] | 田 庆. 超高压直流运行经验及分析[J]. 高压电器,2011,47(4):91-95. TIAN Qing. Analysis on the EHVDC operation experience[J]. High Voltage Apparatus,2011,47(4):91-95.
|
[13] | 田 庆. 特高压交流试验示范工程主变保护误动作分析[J]. 高压电器,2011,47(2):7-11. TIAN Qing. Analysis on the primary transformer protection misoperation in UHV pilot project[J]. High Voltage Apparatus,2011,47(2):7-11.
|
[14] | 田 庆. 龙政直流开路试验分析[J]. 高压电器,2009,45(6):49-51. TIAN Qing. Analysis of longzheng HVDC open line test[J]. High Voltage Apparatus,2009,45(6):49-51.
|
[15] | 田 庆,时伟光. 云广特高压直流工程系统调试无通讯运行问题分析及策略[J]. 高压电器,2011,47(5):16-21. TIAN Qing,SHI Weiguang. Operation analysis on Yunguang UHVDC system without communication during commissioning period[J]. High Voltage Apparatus,2011,47(5):16-21.
|
[16] | 田 庆,原敏宏,王志平. 交流特高压试验示范工程电容器保护配置、整定及应用原则探讨[J]. 高压电器,2010,46(3):68-71. TIAN Qing,YUAN Minhong,WANG Zhiping. Configuration,setting and application of capacitor protection in UHV pilot project[J]. High Voltage Apparatus,2010,46(3):68-71.
|
[17] | 刘振亚. 特高压直流输电技术研究成果专辑(2005 年) [M]. 北京:中国电力出版社,2006. LIU Zhenya. Study special for UHVDC technology(2005)[M]. Beijing:China Electric Power Press,2006.
|
[18] | 王合建,王福润,张海龙,等. 有载调容变压器应用研究及综合效益分析[J]. 电网与清洁能源,2013,29(9):45-51. WANG Hejian,WANG Furun,ZHANG Hailong,et al. App-lication and comprehensive benefits analysis of on-load capacity regulating transformer[J]. Power System and Clean Energy,2013,29(9):45-51.
|
[19] | 焦秀英,刘 宁. 向家坝―上海特高压直流输电换流阀塔水路的分析[J]. 高压电器,2012,48(1):13-16. JIAO Xiuying,LIU Ning.Analysis of cooling system for UHVDC transmission thyristor valve tower[J]. High Voltage Apparatus,2012,48(1):13-16.
|
[20] | 何胜红,苏杏志,陈志平,等. 一次GIS避雷器中的局部放电在线检测和故障分析[J]. 高压电器,2012,48(8):89-93. HE Shenghong,SU Xingzhi,CHEN Zhiping,et al. Partial discharge on-line detection and fault diagnosis for MOA in GIS[J]. High Voltage Apparatus,2012,48(8):89-93.
|
[21] | 周 伟,李 岩,井永腾,等. 换流变压器谐波损耗的计算与分析[J]. 高压电器,2012,48(8):18-23. ZHOU Wei,LI Yan,JING Yongteng,et al. Calculation and analysis of harmonic loss in converter transformer[J]. High Voltage Apparatus,2012,48(8):18-23.
|
[22] | 蒋 伟,吴广宁,黄 震,等. 特高压直流输电的地中电流对变压器的影响与计算[J]. 高压电器,2008,44(6):534-536. JIANG Wei,WU Guangning,HUANG Zhen,et al. Influence of ground electrode current in UHVDC transmission on transformer and its calculation[J]. High Voltage Apparatus,2008,44(6):534-536.
|
[23] | 洪 妙,刘 栋,骆林峰. 换流站交流滤波器的配置与控制功能优化[J]. 电力电容器与无功补偿,2012,33(3):6-9. HONG Miao,LIU Dong,LUO Linfeng. Configuration and control function optimization of AC filter for converter station[J]. Power Capacitor & Reactive Power Compensation,2012,33(3):6-9.
|
[24] | 朱韬析. 天广直流输电系统中性母线开关动作逻辑缺陷分析[J]. 南方电网技术,2009,3(2):29-31. ZHU Taoxi. Defect of action logic of the high-speed neutral bus switch in Tianshengqiao-Guangzhou HVDC transmission system[J]. Southern Power system Technology,2009,3(2):29-31.
|
[25] | ABB Company. Main circuit parameters, Three gorges-Shanghai ±500 kV DC transmission project[K]. Switzerland:ABB,2004.
|