[1] | 王团结,何信林,都劲松.500 kV启动/备用变压器感应耐压试验方法的分析与研究[J]. 陕西电力,2013,41(7):86-88. WANG Tuanjie,HE Xinlin,DU Jingsong.Study and analysis of induced voltage test with 500 kV start/standby transformer[J]. Shaanxi Electric Power,2013,41(7):86-88.
|
[2] | IEC62271-100:2008 High-voltage switchgear and controlgear-Part100:Alternating current circuit-breakers[S].2008.
|
[3] | 钱家骊,张节容,吉嘉琴,等.高压开关开合电容电流和小电感电流[M]. 北京:中国电力出版社,1999. QIAN Jiali,ZHANG Jierong,JI Jiaqin,et al.High voltage switch switching of capacitive current and small inductive current[M]. Beijing:China Electric Power Press,1999.
|
[4] | 张志强,韩先才,班连庚,等.1 000 kV交流特高压试验示范工程变电站110 kV侧电容器组串抗率分析[J]. 中国电力,2007,40(12):36-41. ZHANG Zhiqiang,HAN Xiancai,BAN Liangeng,et al.The analyses of capacitor series reactance rate at 110 kV side in 1 000 kV UHV AC substations[J]. Electric Power,2007,40(12):36-41.
|
[5] | 中国电力科学研究院.1 000 kV级交流输电系统无功补偿方案研究[R]. 北京:中国电力科学研究院,2006. China Electric Power Research Institute. Study on scheme of reactive power compensation for 1000 kV UHV power transmission system[R]. Beijing:China Electric Power Research Institute,2006.
|
[6] | 裴振江, 姚斯立, 何俊佳,等.一种新的特高压断路器合成试验回路[J]. 中国电机工程学报,2007,27(33):66-69. PEI Zhenjiang,YAO Sili,HE Junjia,et al. A new synthetic test circuit for UHV circuit breakers[J]. Proceedings of the Chinese Society for Electrical Engineering,2007,27(33):66-69.
|
[7] | 黄 实,姚斯立, 张海峰,等.特高压断路器容性电流开合试验方法研究[J]. 高压电器, 2007,43(1):32-34. HUANG Shi,YAO Sili,ZHANG Haifeng,et al. Study on test method of capacitive current switching for ultra-high voltage circuit breakers[J]. High Voltage Apparatus,2007,43(1):32-34.
|
[8] | IEC 62271-101―2006 High-voltage switchgear and controlgear Part101:Synthetic testing[S].2006.
|
[9] | SHENG B L.Design consideration of Weil-Dobke synthetic testing circuit for the interrupting testing of HV AC circuit breakers[C]//Power Engineering Society Winter Meeting.[S.l.]:IEEE,2001:295-299.
|
[10] | 刘振亚.特高压交直流电网[M]. 北京:中国电力出版社,2013. LIU Zhenya. UHV power grid[M]. Beijing:China Electric Power Press,2013.
|
[11] | 刘振亚.特高压直流输电技术研究成果专辑(2011年)[M]. 北京:中国电力出版社, 2012. LIU Zhenya. Research production of UHV alternating current transmission technique(2011)[M]. Beijing:China Electric Power Press,2012.
|
[12] | 舒印彪,刘泽洪,陈葛松,等.2005 年国家电网公司特高压输电论证工作综述[J]. 电网技术,2006,30(5):1-12. SHU Yinbiao,LIU Zehong,CHEN Gesong,et al.A survey on demonstration of UHV power transmission by State Grid Corporation of China in the year of 2005[J]. Power System Technology,2006,30(5):1-12.
|
[13] | 舒印彪.1 000 kV 交流特高压输电技术的研究和应用[J]. 电网技术,2005,29(19):1-6. SHU Yinbiao.Research and development of UHV transmission technology with 1 000 kV AC[J]. Power System Technology,2005,29(19):1-6.
|
[14] | 张运洲.对我国特高压输电规划中几个问题的探讨[J]. 电网技术,2005,29(19):11-14. ZHANG Yunzhou.Discussion of several problems on UHV transmission programming of China[J]. Power System Technology,2005,29(19):11-14.
|
[15] | 曾庆禹.特高压输电技术及其发展[R]. 北京:中国电机工程学会,2006. ZENG Qingyu.UHV transmission technology and its development[R]. Beijing:Chinese Society for Electrical Engineering,2006.
|
[16] | 吴?琼, 黄宝莹, 燕 立,等.1 000 kV变电站主变110 kV侧并联电容器装置的参数选择[J]. 电网技术,2009(5):42-47. WU Yiqiong,HUANG Baoying,YAN Li,et al.1 000 kV substation main transformer 110 kV side shunt capacitor device parameter selection[J]. Power System Technology, 2009(5): 42-47.
|
[17] | 倪学锋, 林 浩, 盛国钊. 1 000 kV 特高压输电系统无功补偿若干问题[J]. 电力设备,2005,6(12):28-30. NI Xuefeng,LIN Hao,SHENG Guozhao.Some problems of reactive power compensation for 1 000 kV UHV power transmission system[J]. Electrical Equipment,2005,6(12):28-30.
|
[18] | 张化良, 黄晓明, 李越茂.特高压变电站低压侧无功补偿装置[J]. 电力设备,2008(10):9-13. ZHANG Hualiang,HUANG Xiaoming,LI Yuemao. UHV substation low-voltage reactive power compensation device [J]. Power Equipment, 2008(10):9-13.
|
[19] | 井永腾,李 岩,杨同勋,等. 变压器磁分路对阻抗、损耗及温升的影响[J]. 变压器,2013,50(7):24-26. JING Yongteng, LI Yan, YANG Tongxun,et al. Effect of transformer magnetic shunting type on impedance, loss and temperature rise[J]. Transformer,2013,50(7):24-26.
|
[20] | 尹宝训,冯争人. 电力变压器励磁状态下的入口电容计算方法[J]. 变压器,2013,50(7):11-14. YIN Baoxun, FENG Zhengren. Calculation method of inlet capacitance under exitation state for power transformer[J]. Transformer, 2013,50(7):11-14.
|