[1] | IEEE Std 1204―1997 IEEE guide for planning DC links terminating at AC locations having low short-circuit capacities[S]. New York: IEEE PES, 1997.
|
[2] | 荆 勇,欧开健,任 震.交流单相故障对高压直流输电换相失败的影响[J]. 高电压技术,2004,30(3):60-62. JING Yong, OU Kaijian, REN Zhen. Impact on HVDC commutation failure of AC single phase fault[J]. High Voltage Technology, 2004,30(3):60-62.
|
[3] | 任永生,王晓丽,艾 飞.交流单相故障引起直流输电换相失败的仿真研究及其预防措施[J]. 浙江电力,2009,10(5):16-19. REN Yongsheng, WANG Xiaoli, AI Fei. Simulation study and prevention measures on HVDC commutation failures induced by single-phase ground fault in AC lines[J]. Zhejiang Electric Power, 2009, 10(5):16-19.
|
[4] | 王小凤,周 浩. ±800 kV特高压直流输电线路的电磁环境研究[J]. 高压电器,2007,43(2):109-111. WANG Xiaofeng, ZHOU Hao. The electromagnetic research of ±800 kV UHVDC transmission lines[J]. High Voltage Apparatus,2007,43(2):109-112.
|
[5] | MAIER F K. A new closed loop control method for HVDC transmission[J]. IEEE Transactions on Power Delivery, 1996,11(4):1955-1960.
|
[6] | 刘皓明,李晨晨,王 瀚.直流微电网微电源接口分析与控制策略设计[J]. 电网与清洁能源,2014,30(1):1-7. LIU Haoming, LI Chenchen, WANG Hao.Interface analysis of micro-sources and control strategy design for DC microgrid[J]. Power System and Clean Energy, 2014,30(1):1-7.
|
[7] | 王建民,景崇友,汪友华,等. 超(特)高压直流换流变压器瞬态电磁场特性的仿真研究[J]. 变压器,2013,50(11):40-43. WANG Jianmin, JING Chongyou, WANG Youhua,et al. Simulation research on transient electromagnetic field characteristics of UHV DC converter transformer[J]. Transformer,2013,50(11):40-43.
|
[8] | 别 睿,涂 莉,周 全,等.同塔双回直流输电线路的感应电压仿真研究[J]. 陕西电力,2014,42(5):11-16. BIE Rui,TU Li,ZHOU Quan,et al.Induced voltage simulation and study of DC transmission lines with double circuit on same tower[J]. Shaanxi Electric Power,2014,42(5):11-16.
|
[9] | 苏新霞,王致杰,陈丽娟.柔性直流输电特点及应用前景研究[J]. 陕西电力,2014,42(5):35-39. SU Xinxia,WANG Zhijie,CHEN Lijuan.Study on VSC-HVDC and its application prospect[J]. Shaanxi Electric Power,2014,42(5):35-39.
|
[10] | 欧开健.南方电网交直流混合仿真系统研究与实施(二)―国内外电力系统实时仿真技术分析[J]. 南方电网技术研究,2006,2(3):30-33. OU Kaijian.Research and application of the AC&DC hybrid simulation system in CSG Part two―Analysis on the real-time simulation technologies in the world[J]. China Southern Power Grid Technology Research,2006,2(3):30-33.
|
[11] | 徐 政.交直流电力系统动态行为分析[M]. 北京:机械工业出社,2004. XU Zheng. Dynamics analysis of AC and DC power systems[M]. Beijing:Machinery Industry Press,2004.
|
[12] | 刘宝宏, 殷威扬, 杨志栋,等.±800 kV 特高压直流输电系统主回路参数研究[J].高电压技术,2007,33(1):17-21. LIU Baohong, YIN Weiyang, YANG Zhidong, et al. Study on main circuit parameters for ±800 kV UHVDC transmission project[J]. High Voltage Engineering, 2007, 33(1):17-21.
|
[13] | SZECHTMAN M, WESS T, THIO C V. First benchmark model for HVDC control studies[J]. Electra, 1991(135):54-60.
|
[14] | 赵 勇,苏 毅,陈 峰,等.福建电网在线稳定控制系统中对华东电网实时动态等值的研究[J].电网技术,2005,29(4):18-22. ZHAO Yong, SU Yi, CHEN Feng, et al. Real-time dynamic equivalence of East China Power Grid for online stability control system of Fujian power system[J]. Power System Technology, 2005, 29(4): 18-22.
|
[15] | 许剑冰,薛禹胜,张启平,等.电力系统同调动态等值的述评[J]. 电力系统自动化,2005,29(14):91-95. XU Jianbing, XUE Yusheng, ZHANG Qiping, et al. A critical review on coherency-based dynamic equivalences[J]. Automation of Electric Power Systems,2005,29(14): 91-95.
|
[16] | 温柏坚,张海波,张伯明.等.广东省地区电网外网等值自动生成系统设计[J]. 电力系统自动化,2004,28(20):77-79. WEN Bojian, ZHANG Haibo, ZHANG Boming, et al. Design of a real-time external of sub-transmission network auto equivalence system networks in Guangdong[J]. Automation of Electric Power Systems, 2004,28(20):77-79.
|
[17] | BUCHHOLZ B M, LEI X, RETZMANN D W.Advanced solutions for power system analysis-computer study and real-time simulation[C]//International Conference on Power System Technology.Perth, Australia:IEEE,2000: 613-618.
|
[18] | 韩民晓,文 俊,徐永海.高压直流输电原理与运行[M]. 北京:机械工业出版社,2008. HAN Minxiao, WEN Jun, XU Yonghai. HVDC principle and operation[M]. Beijing: Machinery Industry Press,2008.
|
[19] | 张万荣,任军辉,王蔚华.±800 kV特高压直流输电工程直流滤波器设计研究[J]. 高压电器,2007,43(6):431-434. ZHANG Wanrong, REN Junhui, WANG Weihua. The DC filter design research of ±800 kV UHVDC transmission system[J]. High Voltage Apparatus,2007, 43(6):431-434.
|
[20] | 司马文霞,庞 锴, 杨 庆. ±800 kV特高压换流站直流侧操作过电压的仿真与研究[J]. 高压电器,2008,44(2):126-129. SIMA Wenxia, PANG Kai, YANG Qing. Operation overvoltage simulation and research of ±800 kV UHVDC system converter DC side[J]. High Voltage Apparatus,2008, 44(2):126-129.
|
[21] | 王 鹏,王清让,任 冲.天中直流工程投产后西北电网运行控制模式研究[J]. 电网与清洁能源,2013,29(12):70-74. WANG Peng, WANG Qingrang, REN Chong. Study on the operation control mode of northwest power grid after tianzhong DC project is put into operation[J]. Power System and Clean Energy, 2013,29(12):70-74.
|
[22] | 黄志龙.华东大受端电网安全稳定分析研究思路[J]. 华东电力,2007,35(5):40-43. HUANG Zhilong. Study of security and stability of large receiving end grids of East China[J]. East China Electric Power,2007,35(5): 40-43.
|
[23] | 赵畹君.高压直流输电工程技术[M]. 北京:中国电力出版社,2004. ZHAO Wanjun. HVDC engineering technology[M]. Beijing: China Electric Power Press, 2004.
|
[24] | 欧开健.南方电网交直流混合仿真系统研究与实施(一)―国内外电力系统非实时仿真技术分析[J]. 南方电网技术研究,2006,2(2):24-29. OU Kaijian.Research and application of the AC & DC hybrid simulation system in CSG Part one―Analysis on the real-time simulation technologies in the world[J]. China Southern Power Grid Technology Research,2006,2(2):24-29.
|
[25] | 陈志伟,王 冰,赵文祥,等. 轻型直流输电用换流变压器的设计[J]. 变压器,2014,51(3):10-12. CHEN Zhiwei, WANG Bing, ZHAO Wenxiang,et al. Design of converter transformer for HVDC light[J]. Transformer,2014,51(3):10-12.
|