[1] | 王季梅,刘志远,苑 舜.大容量真空发电机断路器的研究和发展[J]. 华通技术,2001(3):1-2. WANG Jimei,LIU Zhiyuan, YUAN Shun.Large capacity vacuum generator circuit breakers research and development[J]. Huatong Technology, 2001(3):1-2.
|
[2] | 马玉龙,肖湘宁,陈 琦,等.用于HVDC控制保护系统闭环测试的RTDS建模[J]. 电力自动化设备,2006,26(2):25-27. MA Yulong,XIAO Xiangning,CHEN Qi,et al.Modeling of HVDC in RTDS for closed loop system test[J]. Electric Power Automation Equipment, 2006,26(2):25-27.
|
[3] | 王学强,黄立滨,崔 伟.纵差线路保护装置RTDS实验方案设计[J]. 继电器,2003,31(9):26-30. WANG Xueqiang,HUANG Libin,CUI Wei.Test scheme of line differentia relay by RTDS[J]. Relay, 2003, 31(9):26-30.
|
[4] | 黄立滨,程时杰,陈大鹏,等.RTDS在发电机失步保护动模测试中的应用[J]. 继电器,2004,32(18):38-42. HUANG Libin, CHENG Shijie, CHEN Dapeng, et al.Application of RTDS in dynamic simulation of generator out-of-step protection[J]. Relay,2004, 32(18):38-42.
|
[5] | GB/T 14824―2008 高压交流发电机断路器[S].2008. GB/T 14824―2008 High voltage AC generator circuit breakers[S].2008.
|
[6] | 贾旭东,李庚银,赵成勇,等.基于RTDS的交直流混合系统实际故障再现分析[J].电力系统自动化,2009,33(10):54-58. JIA Dongxu,LI Gengyin,ZHAO Chengyong,et al. Real time simulation studies of actual faults in AC/DC power system based on RTDS[J]. Automation of Electric Power Systems,2009,33(10):54-58.
|
[7] | 王志坚,尹忠东.基于RTDS的电铁录波回放实现[J]. 电网与清洁能源,2009,25(10):34-37. WANG Zhijian,YIN Zhongdong.Implementation of playback of the recorded electric railway data based on RTDS[J]. Power System and Clean Energy, 2009,25(10):34-37.
|
[8] | 刘益青,高伟聪,孙发恩,等.基于VxWorks文件系统的Comtrade分布式录波功能的实现[J]. 电力系统保护与控制,2011,39(4):113-116. LIU Yiqing,GAO Weicong,SUN Fa’en,et al.Implementation of Comtrade distributed wave record based on Vxworks file systems[J]. Power System Protection and Control, 2011,39(4):113-116.
|
[9] | 彭 搏,肖登明.断路器电寿命的在线监测[J]. 电网与清洁能源,2012,28(12):38-41. PENG Bo, XIAO Dengming. Online monitoring of the breaker’s electrical life[J]. Power System and Clean Energy, 2012,28(12):38-41.
|
[10] | SMEETS R P P, PASKE L H. Testing of SF6 and vacuum generator circuit breakers[C]//2011 1st International Conference on Electric Power Equipment-Switching Technology.Xi’an,China:IEEE,2011:147-151.
|
[11] | IEC/IEEE 62271-37-013 High-voltage switchgear and controlgear-Part37-013 Alternating-current generator circuit-breakers[S].2013.
|
[12] | 赵力楠,元复兴,李 鹏,等.真空发电机断路器国内外发展水平[J]. 高压电器,2011,47(8):80-84. ZHAO Linan,YUAN Fuxing,LI Peng,et al. Overview on development of vacuum GCB in domestic and abroad[J].High Voltage Apparatus,2011,47(8):80-84.
|
[13] | 张华赢,杨兰均,李良书,等.偷窃电容器组专用真空断路器性能研究[J]. 电力电容器与无功补偿,2011,32(3):38-44. ZHANG Huaying,YANG Lanjun,LI Liangshu,et al.Study on the performance of special vacuum breaker for switching capacitor banks[J]. Power Capacitor & Reactive Power Compensation,2011,32(3):38-44.
|
[14] | 张万荣,赵伯楠,苟锐锋.发电机出口真空断路器瞬态恢复电压的研究[J]. 高压电器,2000,36(4):15-18. ZHANG Wanrong,ZHAO Bonan, GOU Ruifeng. Study on transient recovery voltage of generator circuit breakers[J]. High Voltage Apparatus, 2000, 36(4):15-18.
|
[15] | 王 政,费广成.大容量发电机断路器用真空灭弧室[J].高压电器,2005,41(4):295-298. WANG Zheng,FEI Guangcheng.Vacuum interrupt for generator circuit breaker[J]. High Voltage Apparatus,2005,41(4):295-298.
|
[16] | 张 爽.大容量发电机出口断路器选择[J].高压电器,2011,47(11):77-80. ZHANG Shuang.Circuit breakers selection method for large-capacity high-voltage generator[J]. High Voltage Apparatus,2011,47(11):77-80.
|
[17] | OWEN R E,LEWIS W A.Asymmetry characteristics of progressive short circuits on large synchronous generators[J]. IEEE Trans. on PAS 90, 1971(2):587-596.
|
[18] | SMISH R K,LONG R W,BURMINGHAM D L.Vacuum interrupters for generator circuit breaker they are not just for distribution circuit breaker anymore[C]//CIRED. Barcelona:[s.n.],2003:5-10.
|
[19] | 成 勇,张文兵,马占峰,等.电弧对发电机断路器电源侧短路电流开断能力的影响分析[J]. 高压电器,2013,49(8):119-124. CHENG Yong, ZHANG Wenbing,MA Zhanfeng,et al.Influence of arc on interrupting capability of generator-source short-circuit current for generator circuit-breaker[J].High Voltage Apparatus, 2013,49(8):119-124.
|
[20] | 朱 静,王弋飞,雷 颖,等.基于RTDS的DSTATCOM小步长网络建模仿真[J]. 南方电网技术,2012,6(6):86-90. ZHU Jing, WANG Yifei, LEI Ying, et al.Modeling and simulation of power network DSTATCOM with small time-step based on RTDS[J]. Southern Power System Technology, 2012,6(6):86-90.
|