[1] | PATEL J J,GUPTA M. Controlled switching of capacitor bank-enhancing power quality[C]//Proc. of the 5th Interna-tional Conference on Switchgear and Controlgear.Hyderabad,India:[s.n.],2000:13-18.
|
[2] | ALEXANDER R W. Synchronous closing control for shunt capacitors[J]. IEEE Trans. on PAS,1985,104(9):233-238.
|
[3] | O’LEARY R P,HARNER R H. Evaluation of methods for controlling the overvoltages produced by the energization of a shunt capacitor bank[C]//Proc.of 30th CIGRE Session.Paris: [s.n.], 1988:5-13.
|
[4] | GRIJP M D,HOPKINS R A,FRANCOCCI E,et al. Controlled switching in the south african power network[Z]. Florianópolis,Brazil:CIGRE SC 13 Colloquium,1995.
|
[5] | 吴军辉,金立军. 选相合闸技术在切合空载线中的应用[J]. 电气开关,1998(5):33-34. WU Junhui,JIN Lijun. The application of synchronization control technology in cutting no-load line[J]. Electric Swit-ching,1998 (5):33-34.
|
[6] | HOLM A,ALVINSSON R,AKESSON U,et al. Development of controlled switching of reactors,capacitors,transformers and lines[C]//Proc. of the 33rd CIGRE Session.Paris:[s.n.],1990:13-201.
|
[7] | ITO H. Factory and field testing of controlled switching systems and their service experience[J]. CIGRE A3-114,2004(3):456-460.
|
[8] | TSIREKIS C D,HATZIARGYRIOU N D,PAPADIAS B C.Optimum switching instants calculation for synchronized switching applications[C]//Proc. of the International Conf..Bursa, Turkey: [s.n.], 2001:26-31.
|
[9] | IEC/TR 62271-302:2010 High-voltage switchgear and controlgear-Part302:Alternating current cirtuit-breaker with intentionally non-simultaneous pole operation[S]. 2010.
|
[10] | SUGIYAMA K T,HIRANO Y. Development of new hydraulic drive and its application for circuit breaker[C]//1988 National Convention of IEE of Japan.[S.l.]:IEEE,1988: 546-1547.
|
[11] | RAJOTTE R J,CHARPENTIER C,BRAULT S,et al. Field tests of a circuit-breaker synchronous control[J]. IEEE PES Winter Meeting on PWRD,1995,13(2):472-479.
|
[12] | CIGRE WG13.04.Shunt capacitor bank switching-stresses and test methods(1st Part)[J]. Electra,1999(182):164-189.
|
[13] | CIGRE WG13.07. Controlled switching of HVAC circuit-breakers-guide for application lines,reactors,capacitors,transformers(1st Part)[J]. Electra,1999(183):43-47.
|
[14] | BOEHNE E W,LOW S S.Shunt capacitor energization with vacuum interrupters-A possible source of overvoltage[J].IEEE Trans. on PAS,1969,88(9):1424-1443.
|
[15] | FROEHLICH K,HOELZL C,STANEK M,et al. Controlled closing on shunt reactor compensated transmission lines[J]. IEEE Transactions on Power Delivery,1997,12(2):734-740.
|
[16] | TSIREKIS C D,HATZIARGYRIOU N D,PAPADIAS B C.Synchronized energization of three-phase shunt reactor[J]. WSEAS Transactions on Circuits,2002(1):27-32.
|
[17] | ANDERSEN A,BERNERYD S,LINDAHL S. Synchronous energization of shunt reactors and shunt capacitors[C]//Proceedings of 32nd CIGRE Session.[S.l.]:CIGRE,1988:13-12.
|
[18] | CARVAHLO A C,HOFBAUER W,H??GG P,et al.Controlled switching as a reliable mean to reduce stresses imposed to the circuit-breaker and to the network[Z]. Florianópolis,Brazil:CIGRE SC 13 Colloquium,1995.
|
[19] | TSUTADA H. Development of synchronous switching controller for gas circuit breakers[J]. Transactions of the Institute of Electrical Engineers of Japan,2001,121-B(7):822-829.
|
[20] | KOHYAMA,WADA,ITO,et al. Study on controlled closing of 550 kV gas circuit breaker[J]. Transactions of the Institute of Electrical Engineers of Japan,2001,121-B(7): 860-866.
|
[21] | KOHYAMA,ITO,ASAI,et al. Control of switching surge in controlled switching of gas circuit breaker[J]. Transactions of the Institute of Electrical Engineers of Japan,2004,124-B(2):267-273.
|