[1] | 高 凯,李胜辉,黄 旭,等. 风电机组低电压穿越测试相关技术研究[J]. 东北电力技术,2013,34(1):5-8. GAO Kai,LI Shenghui,HUANG Xu,et al. Research on related technologies of wind turbine LVRT test[J]. Northeast Electric Power Technology,2013,34(1):5-8.
|
[2] | 张 强,王维庆. 风电场低电压穿越过程中短路信号的研究[J]. 高压电器,2013,49(8):74-80. ZHANG Qiang,WANG Weiqing. Study on short-circuit faults during LVRT in wind farm[J]. High Voltage Apparatus,2013,49(8):74-80.
|
[3] | 李红涛,张军军,包斯嘉,等. 小型并网光伏电站移动检测平台设计与开发[J]. 电力系统自动化,2011,35(19):39-42. LI Hongtao,ZHANG Junjun,BAO Sijia,et al. Design and development of a mobile detection platform for grid connection of small photovoltaic power stations[J]. Automation of Electric Power Systems,2011,35(19):39-42.
|
[4] | 赵争鸣,雷 一,贺凡波,等. 大容量并网光伏电站技术综述[J]. 电力系统自动化,2011,35(12):101-107. ZHAO Zhengming,LEI Yi,HE Fanbo,et al. Overview of large-scale grid-connected photovoltaic power plants[J]. Automation of Electric Power Systems,2011,35(12):101-107.
|
[5] | 陈 波,朱晓东,施 涛,等. 光伏电站低电压穿越技术要求与实现[J]. 电气应用,2012,31(1):76-80. CHEN Bo,ZHU Xiaodong,SHI Tao,et al. Requirements and realization of LVRT technical in photovoltaic power plants[J]. Electrotechnical Application,2012,31(1):76-80.
|
[6] | IEC 61400-21:2008 Measurement and assessment of power quality characteristics of grid connected wind turbines[S].2008.
|
[7] | GB/T 19963―2011 风电场接入电力系统技术规定[S].2011. GB/T 19963―2011 Technical rule for connecting wind farm to power system[S].2011.
|
[8] | Q/GDW 392―2009 风电场接入电网技术规定[S].2009. Q/GDW 392―2009 Technical Rule for connecting wind farm into power grid[S].2009.
|
[9] | 能源行业标准讨论稿:风力发电机组低电压穿越能力测试规程[S]. The energy industry standard discussion draft:Test procedure of wind turbine low voltage rid through ability[S].
|
[10] | 能源行业标准讨论稿:风力发电机组电网适应性测试规程[S]. The energy industry standard discussion draft:Procedure of wind turbine grid adaptability[S].
|
[11] | Q/GDW 617―2011 光伏电站接入电网技术规定[S].2011. Q/GDW 617―2011 Technical rule for photovoltaic power station connected to power grid[S]. 2011.
|
[12] | Q/GDW 618―2011 光伏电站接入电网测试规程[S].2011. Q/GDW 618―2011 Test procedures for photovoltaic power station connected to power grid[S]. 2011.
|
[13] | GB/T 19964―2012 光伏发电站接入电力系统技术规定[S].2012. GB/T 19964―2012 Technical rule for connecting PV power station to electric power systems[S]. 2012.
|
[14] | 国家标准讨论稿:光伏发电站接入电网检测规程[S]. National standard discussion draft:Testing code for photovoltaic power station connected to power grid[S].
|
[15] | 林小进,吴蓓蓓,包斯嘉,等. 新型移动式低电压穿越测试装置设计与开发[J]. 高压电器,2013,49(4):105-109. LIN Xiaojin,WU Beibei,BAO Sijia,et al. Design and development of a mobile LVRT testing device[J]. High Voltage Apparatus,2013,49(4):105-109.
|
[16] | 宋海涛. 低电压穿越(LVRT)测试装置的研制[D]. 北京:北京交通大学,2011. SONG Haitao. The development of low voltage ride through(LVRT)test device[D]. Beijing: Beijing jiaotong University, 2011.
|
[17] | YEARY M,FINK R,BECK D,et al. A spline function, DSP based mixed-signal arbitrary waveform generator[C]// Proceedings of the 19th IEEE Instrumentation and Measurement Technology Conference.Alaska,USA:IEEE,2002:1211-1215.
|
[18] | JEWELL W. Power quality laboratory testing[J]. IEEE Power Engineering Review,2002,22(2):13-15.
|
[19] | 中电普瑞科技有限公司. 风力发电机组用移动式低电压穿越测试装置:中国,201110002700.0 [P]. 2011-07-20. China Epri Science & Technology Co.,Ltd.. A mobile low voltage ride through test device on wind turbine:China, 201110002700.0[P]. 2011-07-20.
|
[20] | 华北电力科学研究院有限责任公司,北京荣华恒信开关技术有限公司.移动式风电机组高低电压穿越测试装置:中国,201220255118.5[P]. 2012-05-31. NCEPRI, Beijing Ronghua Heng Xin Switch technology Co.,Ltd.. A mobile low/high voltage ride through test device on wind turbine:China,201220255118.5[P]. 2012-05-31.
|
[21] | 国网电力科学研究院,荣信电力电子股份有限公司.新型移动式模块化多功能MW级低电压穿越能力检测装置:中国,201120075802.0[P]. 2011-03-22. National Electricity Science Research Institute,Rongxin Power Electric Co.,Ltd.. New mobile modular multi-func-tional MW level LVRT test device:China,201120075802.0[P]. 2011-03-22.
|