[1] | 谢 超,孙 勇.800 kV特高压换流变压器现场局部放电试验[J]. 中国电力,2011,44(1):19-21. XIE Chao, SUN Yong. Field partial-discharge test for 800 kV UHVDC converter transformer[J]. Electric Power, 2011, 44(1):19-21.
|
[2] | 程江平,陈 禾,夏谷林.800 kV换流变压器现场长时感应耐压带局部放电测量试验研究[J]. 广东电力,2010,23(9):53-57 CHEN Jiangping,CHEN He,XIA Gulin. Research on on-site long duration induced AC voltage and partial discharge test of 800 kV converter transformers[J]. Guangdong Electric Power,2010,23(9):53-57.
|
[3] | 谷小博.变压器现场局部放电试验有关问题的分析[J]. 浙江电力,2011(5):5-8. GU Xiaobo. Analysis on problems of on-site partial discharge tests of power transformers[J]. Zhejiang Electric Power,2011(5):5-8.
|
[4] | 王永辉,阎春雨,高 骏.变压器现场局部放电测试中的抗干扰措施[J]. 河北电力科技,2010,19(1):25-26. WANG Yonghui,YAN Chunyu,GAO Jun. Interference protection measures for transformer partial discharge test at site[J]. Hebei Electric Power,2010,19(1):25-26.
|
[5] | 温 建.变电站变压器局部放电试验中干扰波形的判定[J].广东科技,2011(18):119-120. WEN Jian. Determination of interference wave of partial discharge test of transformer[J]. Guangdong Science & Technology, 2011(18):119-120.
|
[6] | 王晓蓉,胡龙龙,张冠军.局部放电测量方法及其测量回路的抗干扰研究[J]. 高压电器,2001,37(4):10-13. WANG Xiaorong,HU Longlong,ZHANG Guanjun.PD measurement and interference rejection[J]. High Voltage Apparatus,2001,37(4):10-13.
|
[7] | 赵婉君.高压直流输电工程技术[M]. 北京:中国电力出版社,2004.
|
[8] | FU Y, VAESSEN P, RORIJS W,等.特高压直流换流变压器试验标准和要求的探讨[J]. 南方电网技术,2009,3(3):1-6. FU Y, VAESSEN P, RORIJS W,et al. Discussion on the test requirements and standards for UHVDC converter transformers[J]. Southern Power System Technology,2009,3(3):1-6.
|
[9] | FU Y, VAESSEN P. 特高压直流输电系统晶闸管换流阀和换流变压器设计审核及验证[J].南方电网技术,2010,4(2):1-6. FU Y, VAESSEN P. On design review and test witness of UHVDC thyristor valves and converter transformers[J]. Southern Power System Technology,2010,4(2):1-6.
|
[10] | 吴云飞,汪 涛,沈 煜.特高压换流变压器现场局部放电试验技术[J]. 高电压技术,2011,37(9):2140-2147. WU Yunfei, WANG Tao,SHEN Yu. On-site partial discharge test technology of ultra high voltage converter transformer[J]. High Voltage Engineering, 2011,37(9):2140-2147.
|
[11] | GB/T 7354―2003 局部放电测量[S].2003. GB/T 7354―2003 Partial discharge measurement[S].2003.
|
[12] | DL/T 417―2006 电力设备局部放电现场测量导则[S].2006. DL/T 417―2006 Guide for partial discharge measuring of power equipment[S].2006.
|
[13] | GB 1094.3―2003 电力变压器第3部分:绝缘水平、绝缘试验和外绝缘空气间隙[S].2003. GB 1094.3―2003 Power transformers-Part3: Insulation levels, dielectric tests and external clearances in air[S].2003.
|
[14] | 李 辉.变压器局放用UHF传感器的校准方法研究[J].高压电器,2014,50(1):7-13. LI Hui.Calibration of UHF sensor for detection of partial discharge in transformer[J]. High Voltage Apparatus, 2014,50(1):7-13.
|
[15] | 吴云飞,胡惠然.特大型电力变压器现场局部放电测量技术研究[J]. 变压器,2010,47(4):29-31. WU Yunfei,HU Huiran. Technology research on field partial discharge test of extra large power transformer[J]. Transformer, 2010,47(4):29-31.
|
[16] | 张永跃.变压器现场局部放电试验接线的探讨[J]. 电网技术,1998,23(1):79-82. ZHANG Yongyue.Study of partial discharge test scheme on site for transformer[J]. Power System Technology,1998,23(1):79-82.
|
[17] | 仇新艳,李付亮,彭春燕.特高压变压器交流耐压及局部放电试验装置[J]. 高压电器,2007,45(4):94-99. QIU Xinyan,LI Fuliang,PENG Chunyan.Test equipment of UHV transformer’s AC withstand voltage and partial discharge tests[J]. High Voltage Apparatus, 2007,45(4):94-99.
|
[18] | 张玉春.谈变压器的局部放电[J]. 变压器,2008,45(6):18-20. ZHANG Yuchun. Discussion on transformer partial discharge[J]. Transformer, 2008,45(6):18-20.
|
[19] | 伍志荣,聂德鑫,陈江波.特高压变压器局部放电试验分析[J]. 高电压技术,2010,36(1):54-61. WU Zhirong,NIE Dexin,CHEN Jiangbo. Analysis of partial discharge test of UHV transformer[J]. High Voltage Engineering, 2010,36(1):54-61.
|
[20] | 葛为民.变压器局部放电综合判断分析[J].高压电器,2006,42(2):144-145. GE Weimin.Comprehensive judgement analysis about partial discharge in transformer[J]. High Voltage Apparatus,2006,42(2):144-145.
|
[21] | 李云阁,施 围,张祥全.750 kV变压器现场局部放电试验有关问题分析[J]. 高压电器,2007,43(6):434-437. LI Yunge,SHI Wei,ZHANG Xiangquan.Analysis of on-site partial-discharge test on 750 kV transformers[J]. High Voltage Apparatus, 2007,43(6):434-437.
|