[1] | 曹炜卿.基于单片机的煤炭企业电缆在线监测分析[J]. 煤炭技术,2011,30(11):47-48. CAO Weiqing.Micro-controller-based cable-line monitoring and analysis of coal enterprises[J]. Coal Technology,2011,30(11):47-48.
|
[2] | WU R N,CHANG C K.Use of partial discharges as an online monitoring system for underground cable joints[J]. IEEE Transactions on Power Delivery,2011,26(3):1585-1586.
|
[3] | 赵健康,雷清泉,王晓兵,等.复杂运行条件下交联电缆载流量研究[J]. 高电压技术,2009,35(12):3123-3124. ZHAO Jiankang,LEI Qingquan,WANG Xiaobing, et al.Experimental research on ampacity of extruded power cable under complex operating condition[J]. High Voltage Engineering,2009,35(12):3123-3124.
|
[4] | 邱昌容.电线与电缆[M]. 西安:西安交通大学,2009.
|
[5] | 李配配,邓 雷,赵永雷.配电网混合线路单端行波测距方法的研究[J]. 陕西电力,2013,41(4):70-73. LI Peipei,DENG Lei,ZHAO Yonglei.Study on single-ended traveling wave fault location in distribution network hybrid lines[J]. Shaanxi Electric Power,2013,41(4):70-73.
|
[6] | 高小庆,姜 芸.XLPE电力电缆过负荷温升与早期损坏机理的研究[J]. 高电压技术,1997,23(2):62-64. GAO Xiaoqing,JIANG Yun.Principle of earlier period damage of XLPE power cable due to temperature rise by overload[J]. High Voltage Engineering,1997,23(2):62-64.
|
[7] | 薛 强,李华春,王 立,等.电缆导体温度的推算方法及应用[J]. 电线电缆,2009,4(2):23-24. XUE Qiang,LI Huachun,WANG Li,et al.The method for calculation of cable conductor temperature and its application[J]. Electric Wire and Cable,2009,4(2):23-24.
|
[8] | LYALL J S,NOURBAKHSH G,ZHAN H C.Underground power cable environment on-line monitoring and analysis[C]//Proceedings of IEEE Power Engineering Society Summer Meeting.[S.l.]:IEEE,2000:457-462.
|
[9] | 赵建华,袁宏永,范维澄.基于表面温度场的电缆线芯温度在线诊断研究[J]. 中国电机工程学报,1999,19(11):52-53. ZHAO Jianhua,YUAN Hongyong,FAN Weicheng,et al.Surface temperature field based online diagnoses study for electric cable’s conductor temperature[J]. Proceedings of the CSEE,1999,19:52-55.
|
[10] | FRANCISCO G J.Effects of backfilling on cable ampacity analyzed with the finite element method[J]. IEEE Transactions on Power Delivery,2008,23(2):537-543.
|
[11] | 王有元,陈仁刚,陈伟根,等.有限元法计算地下电缆稳态温度场及其影响因素[J].高电压技术,2009,34(12):3086-3087. WANG Youyuan,CHEN Rengang,CHEN Weigen,at al.Calculation of static temperature field of buried cable based on FEM and analysis of influential factors[J]. High Voltage Engineering,2009,34(12):3086-3087.
|
[12] | GELA G, DAY J J. Calculation of thermal fields of underground cables using the boundary element method[J]. IEEE Transactions on Power Delivery,1988,3(4):1341-1342.
|
[13] | 梁永春,李延沐,李彦明,等.利用模拟热荷法计算地下电缆稳态温度场[J].中国电机工程学报,2008,28(16):129-131. LIANG Yongchun,LI Yanmu,LI Yanming, et al. Numerical method to calculate transient field and hort-term ampacity of underground cable system[J]. Proceedings of the CSEE,2008,28(16):129-131
|
[14] | IEC 602872321―1995 Calculation of the current rating of electric cables,Part3:Sections on operating conditions,Section 1:Reference operating conditions and selection of cable type[S].1995.
|
[15] | 刘毅刚,罗俊华.电缆导体温度实时计算的数学方法[J].高电压技术,2005,31(5):52-53. LIU Yigang,LUO Junhua.Mathematical method of emperature calculation of power cable conductor in real time[J]. High Voltage Engineer,2005,31(5):52-53.
|
[16] | 王 立,李华春,薛 强,等.220 kV电缆分布式光纤 测温系统运行情况分析[J]. 电力设备,2007,8(6):36-41.WANG Li,LI Huachun,XUE Qiang,et al.Operation condition analysis of distributed optical fiber thermometric system for 220 kV cable[J]. Electrical Equipment,2007,8(6):36-41.
|
[17] | 雷 鸣,刘 刚,赖育庭,等.采用Laplace方法的单芯电缆线芯温度动态计算[J]. 高电压技术,2010,36(5):1150-1151. LEI Ming,LIU Gang,LAI Yuting,et al.Dynamic calculation of core temperature of single core cables using Laplace method[J]. High Voltage Engineering,2010,36(5):1150-1151.
|
[18] | 赵光宙.信号分析与处理[M]. 北京:机械工业出版社,2008.
|
[19] | 姜建国,曹建中,高玉明.信号与系统分析基础[M]. 北京:清华大学出版社,1994.
|
[20] | 刘 刚,雷成华,刘毅刚.根据电缆表面温度推算导体温度的热路简化模型暂态误差分析[J]. 电网技术,2011,35(4):212-213. LIU Gang,LEI Chenghua,LIU Yigang.Analysis on transient error of simplified thermal circuit model for calculating conductor temperature by cable surface temperature[J].Power System Technology,2011,35(4):212-213.
|
[21] | 翁中杰.传热学[M]. 上海:上海交通大学出版社,1987.
|
[22] | 门汉文,崔国璋,王 海.电力变压器及电线[M]. 北京:中国电力出版社,2001.
|
[23] | 马国栋.电线电缆载流量[M]. 北京:中国水利水电出版社,2003.
|