[1] | 刘振亚. 特高压交直流电网[M]. 北京:中国电力出版社,2013:15?鄄18. LIU Zhenya. Ultra high voltage power grid[M]. Beijing: China Electric Power Press,2013:15?鄄18.
|
[2] | 刘兆林. 雷击引起的高压断路器故障分析[J]. 高压电器,2009,45(3):66?鄄69. LIU Zhaolin.Analysis of the lightning strike faults on the HV circuit breaker[J]. High Voltage Apparatus,2009,45(3):66?鄄69.
|
[3] | 李 ?,王晓琪,余春雨,等. 1 000 kV特高压交流电压互感器研制现状及性能浅析[J]. 高压电器,2011,47(11):110?鄄114. LI Xu, WANG Xiaoqi, YU Chunyu, et al. Development and performance analysis of 1 000 kV UHV voltage transformer[J]. High Voltage Apparatus, 2011,47(11):110?鄄114.
|
[4] | 陈坤汉,李顺尧. 一起220 kV线路避雷器泄漏电流超标的原因分析[J]. 高压电器,2012,48(5):111?鄄114. CHEN Kunhan, LI Shunrao. Analysis of over?鄄standard leakage current of lighting arresters on a 220 kV transmission line[J]. High Voltage Apparatus, 2012,48(5):111?鄄114.
|
[5] | 刘胜军,李遵守,周开峰. 多重雷击引起220 kV断路器损坏的事故分析[J]. 高压电器,2012,48(10):131?鄄133. LIU Shengjun,LI Zunshou,ZHOU Kaifeng. Prevention of 220 kV circuit breaker damage due to multiple lightning strickes[J]. High Voltage Apparatus, 2012,48(10):131?鄄133.
|
[6] | 胡 毅,刘 凯,彭 勇,等. 带电作业关键技术研究进展与趋势[J]. 高电压技术,2014,40(7):1921?鄄1931. HU Yi,LIU Kai, PENG Yong, et al. Research status and development trend of live working key technology[J]. High Voltage Engineering, 2014,40(7):1921?鄄1931.
|
[7] | 刘 强,周 平,朱雪松,等. 220 kV变电站带电作业的安全间隙试验分析[J]. 电力科学与技术学报,2013,28(3):77?鄄82. LIU Qiang,ZHOU Ping,ZHU Xuesong, et al. Experimental research on safety gap for live working in 220 kV substation[J]. Journal of Electric Power Science and Technology, 2013,28(3):77?鄄82.
|
[8] | 金 阳,刘海峰,郑晓泉,等. 110 kV变电站高压裸线扩径增强绝缘护套研究[J]. 西安交通大学学报,2014(12):34?鄄40. JIN Yang,LIU Haifeng,ZHENG Xiaoquan,et al. Diameter expanding and reinforced insulation jacket for high voltage bare conductor in 110 kV substation[J]. Journal of Xi’an Jiaotong University,2014(12): 34?鄄40.
|
[9] | 李 飞,崔文杰,黄 欣. 500 kV变电站等电位连接铜缆方式研究[J]. 高压电器,2009,45(4):52?鄄54. LI Fei,CUI Wenjie,HUANG Xin. Research on equipotential bonding of copper cable in 500 kV substation[J]. High Voltage Apparatus,2009,45(4): 52?鄄54.
|
[10] | 李 健,鲁守银,王振利,等. 220 kV变电站带电作业机器人的研制[J]. 制造业自动化,2013,35(9):76?鄄79. LI Jian,LU Shouyin,WANG Zhenli,et al. Development of 220 kV transformer substation hot?鄄line work robot[J].Manufacturing Automation,2013,35(9):76?鄄79.
|
[11] | 李 健,鲁守银,董 旭. 变电站带电作业水冲洗机器人的研制[J]. 制造业自动化,2015,37(5):67?鄄71. LI Jian,LU Shouyin,DONG Xu. Development of the water washing robot with hot?鄄line working used in substation[J]. Manufacturing Automation,2015,37(5):67?鄄71.
|
[12] | 郑俊杰,邹建明,姜 锋,等. 220 kV变电站绝缘子带电干冰清洗车载系统[J]. 中国电力,2014,47(4):118?鄄122. ZHENG Junjie,ZOU Jianming,JIANG Feng, et al. Vehicle?鄄based dry ice cleaning system for live?鄄line insulators in substations of 220 kV[J]. Electric Power,2014,47(4):118?鄄122.
|
[13] | 朱正国,钟建灵. 变电站绝缘子清洗试验数据分析[J]. 高压电器,2008,44(5):472?鄄473. ZHU Zhengguo,ZHONG Jianling. Cleaning data analysis of 110 kV substation insulators[J]. High Voltage Apparatus,2008,44(5):472?鄄473.
|
[14] | 王祖林,胡 毅,樊亚东,等. 220 kV变电设备带电水冲洗清洗效率试验研究[J]. 高电压技术,2015,41(4):1313?鄄1319. WANG Zulin,HU Yi,FAN Yadong,et al. Experimental research on hot washing efficiency of 220 kV substation equipment[J]. High Voltage Engineering,2015,41(4):1313?鄄1319.
|
[15] | 孙阳盛,华月申. 高分子带电清洗技术在220 kV变电站中的应用[J]. 华东电力,2013,41(1):238?鄄240. SUN Yangsheng,HUA Yueshen. Application of polymer live cleaning technology in 220 kV substation[J]. East China Electric Power,2013,41(1):238?鄄240.
|
[16] | 刘振亚.国家电网公司输变电工程通用设计(1 000 kV变电站分册)[M]. 北京:中国电力出版社,2014. LIU Zhenya. Power transmission and transformation project general design of state grid corporation(1 000 kV substation booklet)[M]. Beijing: China power press,2014.
|
[17] | GB 50697―2011 1 000 kV变电站设计规范[S].2011. GB 50697―2011 Specification for design of 1 000 kV substation [S].2011.
|
[18] | GB 13398―2003 带电作业用空心绝缘管、泡沫填充绝缘管和实心绝缘棒[S].2003. GB 13398―2003 Live working hollow insulation pipe, foam filled insulation and solid insulation bar[S].2003.
|
[19] | GB/T 18037―2000 带电作业工具基本技术要求与设计导则[S].2000. GB/T 18037―2000 The basic technical requirements and design guidelines for live working tools[S].2000.
|