GB/T 4473―2008 高压交流断路器的合成试验[S]. 北京:中国标准出版社,2009 GB/T 4473―2008 Synthetic testing of high-voltage alternating current circuit-breakers[S]. Beijing: Chinese Standards Press,2009.
[3]
李 刚,孙 梅,程 茵.一种新的合成试验回路[J]. 高压电器,2009,45(6):136-139. LI Gang,SUN Mei,CHENG Yin. A new synthetic test circuit[J]. High Voltage Apparatus,2009,45(6): 136-139.
[4]
GB/T 16927―2011高电压试验技术[S].2011.
[5]
张仁豫,陈昌渔,王昌长. 高电压试验技术[M]. 北京:清华大学出版社,2003.
[6]
林福昌. 高电压工程[M]. 北京:中国电力出版社,2006.
[7]
IEC 62271-101―2012 High-voltage switchgear and controlgear-Part 101: Synthetic testing[S].2012.
[8]
IEC 62271-100―2008 High-voltage switchgear and controlgear-Part 100: Alternating-current circuit-breakers[S].2008.
[9]
SHENG B L. Design consideration of weil-dobke synthetie testing circuit for the interrupting testing of HVAC cireuit breakers[C]//Proeeedings of the IEEE Power Engineering Soeiety Transmission and Distribution Conference.[S.l.]:IEEE,2001:295-299.
[10]
罗 敏,赵殿林,甘延青,等. 兆伏级重复频率三电极气体开关工作特性研究[J]. 强激光与粒子束,2005,17(6):905-908. LUO Min,ZHAO Dianlin,GAN Yanqing,et al. Operating characteristics of a mv-class three-electrode repetitive gas switch[J]. High Power Laser and Particle Beams,2005,17(6): 905-908.
[11]
QSMOKROVIC P,ARSIC N,KARTALOVIC N. Triggered three-electrode spark gaps[C]//10th IEEE International Conference on Pulsed Power.[S.l.]:IEEE,1995:822-827.
[12]
ARSIC N, QSMOKROVIC P. The influence of the gas insulation parameters on the three-electrode spark gap functioning[J]. Proceedings of International Symposium on Discharges and Electrical Insulation in Vacuum, 1996(1): 77-80.
[13]
MACGREGOR S J,TUEMA F A,TURNBULL S M,et al. The influence of polarity on trigatron switching performance[J]. IEEE Transactions on Plasma Science,1997,25(2): 118-123.
[14]
MARTIN T H. An empirical formula for gas switch breakdown delay[C]//The 7th Pulsed Power Conference. [S.l.]: IEEE,1989:73-79.
[15]
IEC 60052:2002 Voltage measurement by means of standard air gaps[S].2002.