孙渭清. 初析国内外电力金具产品的差异[J]. 电力金具,1997(1):8-17. SUN Weiqing. Analyse about the difference between electric power fitting made in China and electric power fitting made in foreign country[J]. Electric Power Fitting,1997(1):8-17.
[2]
罗楚楠,李 棠. 高强度金具的研制[J]. 电力建设,2001,22(8):48-49. LUO Chunan,LI Tang. Development of high strength hardware[J]. Electric Power Construction,2001,22(8):48-49.
[3]
万建成. 输电线路大跨越金具系列化设计[D]. 北京:华北电力大学,2005. WAN Jiancheng. Design of seriation fittings for large crossing[D]. Beijing:North China Electric Power University,2005.
[4]
舒印彪. 我国特高压输电的发展与实施[J]. 中国电力,2005,38(11):1-8. SHU Yinbiao. Development and execution of UHV power transmission in China[J]. Electric Power,2005,38(11):1-8.
[5]
丁永福,王祖力,张燕秉,等. ±800 kV特高压直流换流站阀厅金具的结构特点[J]. 高压电器,2013,49(9):13-18. DING Yongfu,WANG Zuli,ZHANG Yanbing,et al. Design structure characteristics of valve hall fittings in the ±800 kV HVDC converter station[J]. High Voltage Apparatus,2013,49(9):13-18.
[6]
肖颍涛,柴贤东,李永明,等. ±800 kV特高压直流线路采用不均匀分裂降低电晕损耗[J]. 高压电器,2013,49(4):14-19. XIAO Yingtao,CHAI Xiandong,LI Yongming,et al. ±800 kV UHVDC transmission line using asymmetric division to reduce corona loss[J]. High Voltage Apparatus,2013,49(4):14-19.
[7]
冯 瑞,师昌绪,刘治国. 材料科学导论[M]. 北京:化学工业出版社,2004. FENG Rui,SHI Changxu,LIU Zhiguo. The theory of material science[M]. Beijing:Chemistry Industry Press,2004.
[8]
王吉会,郑俊萍,刘家臣,等. 材料力学性能[M]. 天津:天津大学出版社,2006. WANG Jihui,ZHENG Junping,LIU Jiachen,et al. Mechanics capability of material[M]. Tianjin: Tianjin University Press,2006.
[9]
邹 莉. 机械工程材料及应用[M]. 重庆:重庆大学出版社,2005. ZOU Li. The application of mechanical engineering material[M]. Chongqing: Chongqing University Press,2005.
[10]
闻邦椿,鄂中凯. 常用设计材料[M]. 北京:机械工业出版社,2011. WEN Bangchun,E Zhongkai. Machine design manual first part design material that is usually used[M]. Beijing: China Machine Press,2011.
[11]
肖天宇. 最新钢牌号性能用途与技术标准速用速查手册(电子版)[K]. 长春:银声音像出版社,2004. XIAO Tianyu. The manual of capability purpose and technic standard of steel(Electronic edition)[K]. Changchun:Argentine Sound Audio Image Press,2004.
GB 228―1987 金属拉伸试验方法[S].1987. GB 228―1987 The method of pulling test of metal[S].1987.
[14]
张朝晖. ANSYS12.0结构分析工程应用实例解析[M]. 第3版.北京:机械工业出版社,2010. ZHANG Chaohui. Example resolution of structure analysis in project of ANSYS12.0[M]. The Third Edition. Beijing:China Machine Press,2010.
[15]
王富耻,张朝晖. ANSYS10.0有限远分析理论与工程应用[M]. 北京:电子工业出版社,2006. WANG Fuchi,ZHANG Chaohui. Analysis theory and project application of FEM ANSYS10.0[M]. Beijing:Publishing House of Electronics Industry,2006.
[16]
GB/T 2315―2008 电力金具通用技术条件[S].2008. GB/T 2315―2008 Universal technic condition of electric power fitting[S].2008.
[17]
潘国洪,朱华艳. ±800 kV直流穿墙套管安装和现场试验关键技术研究[J]. 高压电器,2013,49(2):98-102. PAN Guohong,ZHU Huayan. Key technologies research for the installation and field test of ±800 kV wall bushing[J]. High Voltage Apparatus,2013,49(2):98-102.
[18]
张 瑚,李 健,黄欲成,等. 1 000 kV特高压交流双回输电线路换位塔型式选择[J]. 高压电器,2014,50(9):71-75. ZHANG Hu,LI Jian,HUANG Yucheng,et al. Study on transposition tower of 1 000 kV UHV AC double-circuit transmission line[J]. High Voltage Apparatus,2014,50(9):71-75.
[19]
GB/T 2317.1―2008 电力金具试验方法 第1部分:机械试验[S].2008. GB/T 2317.1―2008 Tests for electric power fitting first Part 1: Mechanical tests[S].2008.