[1] | FEIJOO A E, CIDRA??S J, DORNELAS J. Wind speed simulation in wind farms for steady-state security assessment of electrical power systems[J]. IEEE Transactions on Energy Conversion,1999,14(4): 1582-1588.
|
[2] | 别朝红,王锡凡.蒙特卡洛法在评估电力系统可靠性中的应用[J]. 电力系统自动化,1997,21(6):68-75. BIE Chaohong, WANG Xifan. The application of Monte Carlo method to reliability evaluation of power systems[J]. Automation of Electric Power Systems, 1997,21(6): 68-75.
|
[3] | 吴义纯,丁 明.基于蒙特卡罗仿真的风力发电系统可靠性评价[J]. 电力自动化设备,2004,24(12):70-73. WU Yichun, DING Ming. Reliability assessment of wind power generation system based on Monte-Carlo simulation[J]. Electric Power Automation Equipment,2004,24(12): 70-73.
|
[4] | 吴义纯.含风电场的电力系统可靠性与规划问题的研究[D]. 合肥:合肥工业大学,2006. WU Yichun. Research on reliability evaluation and expansion planning of power system including wind farms[D]. Hefei: Hefei University of Technology,2006.
|
[5] | 雷亚洲,王伟胜,印永华,等.基于机会约束规划的风电穿透功率极限计算[J]. 中国电机工程学报,2002,22(5):32-35. LEI Yazhou,WANG Weisheng,YIN Yonghua,et al. Wind power penetration limit calculation basedon chance constrained programming[J]. Proceedings of the Chinese Society for Electrical Engineering,2002,22(5): 32-35.
|
[6] | WANGDEE W,BILLINTON R. Considering load-carrying capability and wind speed correlation of WECS in generation adequacy assessment[J]. IEEE Transactions on Energy Conversion,2006,21(3): 734-741.
|
[7] | 雷亚洲.随机规划理论在风电并网系统分析中的应用研究[D]. 北京:中国电力科学研究院,2001. LEI Yazhou. Application of chance constrained programming in wind power penetration[D]. Beijing: China Electric Power Research Institute,2001.
|
[8] | 宋晓通.基于蒙特卡罗方法的电力系统可靠性评估[D].济南:山东大学,2008. SONG Xiaotong. Study on reliability evaluation of power system based on Monte Carlo simulation[D]. Jinan: Shandong University,2008.
|
[9] | BILLINTON R,LI Wenyuan. Reliability assessment of electric power systems using Monte Carlo methods[M]. America: America Plenum Press,1994.
|
[10] | 石文辉,别朝红,王锡凡.大型电力系统可靠性评估中的马尔可夫链蒙特卡洛方法[J].中国电机工程学报,2008,28(4):9-15. DAN Wenhui,BIE Chaohong,WANG Xifan. Applications of markov chain Monte Carlo in large-scale system reliability evaluation[J]. Proceedings of the CSEE,2008,28(4): 9-15.
|
[11] | 余 民,杨?宸,蒋传文,等.风电并网后电力系统可靠性评估和备用优化研究[J].电力系统保护与控制,2012,40(12):100-104. YU Min,YANG Minchen,JIANG Chuanwen,et al. Study on power system reliability and reserve optimization with wind power integration[J]. Power System Protection and Control,2012,40(12): 100-104.
|
[12] | 吴 昊,张 焰,刘 波.考虑风电场影响的发输电系统可靠性评估[J]. 电力系统保护与控制,2011,39(4):36-42. WU Hao,ZHANG Yan,LIU Bo. Reliability assessment of generation and transmission systems considering wind farm effects[J]. Power System Protection and Control,2011,39(4): 36-42.
|
[13] | 王锡凡.电力系统优化规划[M]. 北京:水利电力出版社,1990:190-191.
|
[14] | 刘振亚.中国电力与能源[M]. 北京:中国电力出版社,2012:105-106.
|
[15] | 中华人民共和国水利电力部. SD 131―1984 电力系统技术导则(试行)[S]. 北京: 水利电力出版社,1984.
|
[16] | 中华人名共和国水利电力部. SDJ 161―1985 电力系统设计技术规程(试行)[S]. 北京: 水利电力出版社, 1985.
|
[17] | 中华人民共和国国家能源局. DL/T 5429―2009 电力系统设计技术规程[S]. 北京: 中国电力出版社, 2009.
|
[18] | 张宏宇,印永华,申 洪,等.考虑大规模风电调峰要求的系统机组检修计划[J]. 电力系统自动化,2012,36(16):25-30. ZHANG Hongyu,YIN Yonghua,SHEN Hong,et al. Generator maintenance scheduling of large-scale wind power integration considering peak shaving[J]. Automation of Electric Power Systems, 2012, 36(16): 25-30.
|
[19] | 广东电网公司电网规划研究中心,西安交通大学.电力系统规划中检修备用容量评估方法:中国,CN201310269667.7[P].2013-11-27. Guangdong Grid Planning Research Centre,Xi’an Jiaotong University. Maintenance reserve capacity evaluation method in power system planning: China, CN201310269667.7[P]. 2013-11-27.
|
[20] | 西安交通大学.含风电的电力系统规划中检修备用容量确定方法:中国,CN201410138682.2[P].2014-07-23. Xi’an Jiaotong University. Maintenance reserve capacity evaluation method in power system planning including wind power:China,CN201410138682.2[P].2014-07-23.
|