[1] | 娄 颖,戴 敏,何慧雯,等. 1 000 kV交流紧凑型输电线路潜供电流和恢复电压计算分析[J]. 高电压技术,2011,37(8):1882-1887. LOU Ying,DAI Min,HE Huiwen,et al. Secondary arc current and recovery voltage of 1 000 kV AC compact transmission line[J]. High Voltage Engineering,2011,37(8):1882-1887.
|
[2] | TRAN-QUOCT T,HADJ-SAIDN H,SABONNADIERE J C,et al. Reducing dead time for single-phase auto-reclosing on a series-capacitor compensated transmission line[J]. IEEE Trans. on Power Delivery,2000,15(1):51-56.
|
[3] | MEGAHED A I,JABR H M,ABOUELENIN F M,et al. Arc characteristics and a single-pole auto-reclosure scheme for alexandria HV transimission system[C]//International Conference on Power Systems Transients-IPST. New Orleans, USA: [s.n.],2003:1-6.
|
[4] | 施 围,郭 洁. 电力系统过电压计算[M]. 第2版.北京:高等教育出版社,2006. SHI Wei,GUO Jie. Overvoltage calculation in power system[M]. 2nd ed. Beijing:Higher Education Press,2006.
|
[5] | 解广润. 电力系统过电压[M]. 北京:水利电力出版社,1985. XIE Guangrun.Power system overvoltage[M]. Beijing: Hydraulic and Electric Power Press,1985.
|
[6] | DL/T 620―1997 交流电气装置的过电压保护和绝缘配合[S].1997. DL/T 620―1997 Overvoltage protection and insulation coordination for AC electrical installations[S].1997.
|
[7] | 华北电力科学研究院有限责任公司. 上承III线带串补工程系统调试报告[R]. 北京:华北电力科学研究院有限责任公司,2013. North China Electric Power Research Institute Co., Ltd..Commissioning reports. of Shangcheng line III with fixed series compensator[R]. Beijing:North China Electric Power Research Institute Co., Ltd.,2013.
|
[8] | 牛晓民,王天君. 大房双回500 kV串联补偿线路人工接地试验[J]. 华北电力技术,2002(2):1-5. NIU Xiaomin,WANG Tianjun. Short circuit tests of Datong-Fangshan 500 kV series capacitor compensation lines[J]. North China Electric Power,2002(2):1-5.
|
[9] | 华北电力科学研究院有限责任公司. 上承III线串补工程人工接地试验实施方案[R]. 北京:华北电力科学研究院有限责任公司,2013. North China Electric Power Research Institute Co., Ltd..Implementation plan of artificial single phase grounding test for Shangcheng line III[R]. Beijing:North China Electric Power Research Institute Co., Ltd.,2013.
|
[10] | 王 钢,陶家琪,徐兴伟,等. 东北电网500 kV人工三相接地短路试验总结[J]. 电网技术,2007,31(4):42-48. WANG Gang,TAO Jiaqi,XU Xingwei,et al. 500 kV man-made three-phase earthing short circuit experiment in northeast power grid[J]. Power System Technology,2007,31(4):42-48.
|
[11] | 牛晓民,刘 平. 万全串补站人工接地试验及串补保护误动分析[J]. 华北电力技术,2005(8):1-3. NIU Xiaomin,LIU Ping. Introduce of fault test on SC at wanquan substation and analysis of false operation of unbalance protection[J]. North China Electric Power,2005(8):1-3.
|
[12] | 王 军,严利雄,董双桥,等. 500 kV龙斗Ⅱ回线人工短路试验保护动作情况分析[J]. 湖北电力,2003,27(S1):52-56. WANG Jun,YAN Lixiong,DONG Shuangqiao,et al. Relay operation analysis of artificial short-circuit test at 500 kV longdou II line[J]. Hubei Electric Power,2003,27(S1):52-56.
|
[13] | 林 莘,何柏娜,徐建源. 潜供电弧的仿真分析[J]. 高压电器,2007,43(1):8-10. LIN Xin,HE Baina,XU Jianyuan. Simulation and analysis of secondary arc[J]. High Voltage Apparatus,2007,43(1):8-10.
|
[14] | 柴旭峥,梁曦东,曾 嵘,等. 串联补偿的远距离输电线路潜供电弧参数特性[J]. 电力系统自动化,2007,31(5):7-12. CHAI Xuzheng,LIANG Xidong,ZENG Rong,et al. Secondary arc parameters characteristics of long-distance series compensated transmission lines[J]. Automation of Electric Power Systems,2007,31(5):7-12.
|
[15] | 祝瑞金,胡 宏,曹 路. 基于人工单相接地短路试验的电力系统计算用模型参数校核方法研究[J]. 电网技术,2007,31(5):58-63. ZHU Ruijin,HU Hong,CAO Lu. Research on verification of man-made single-phase earth fault based model parameters utilized in power system calculation[J]. Power System Technology,2007,31(5):58-63.
|
[16] | 田 庆. 特高压交流试验示范工程单相人工接地短路实测恢复电压分析[J]. 高压电器,2010,46(2):1-4. TIAN Qing. Analysis on the measured recovery voltage in artificial single-phase grounding test for UHV AC pilot project[J]. High Voltage Apparatus,2010,46(2):1-4.
|
[17] | 牛晓民,王晓彤,施 围,等. 超高压串联补偿输电线路的潜供电流和恢复电压[J]. 电网技术,1998,22(9):9-12. NIU Xiaomin,WANG Xiaotong,SHI Wei,et al. Secondary arc current and recovery voltage of series compensated EHV transmission line[J]. Power System Technology,1998,22(9):9-12.
|
[18] | TAVARES M C,PORTELA C M. Transmission system parameters optimization-sensitivity analysis of secondary arc current and recovery voltage[J]. IEEE Transactions on Power Delivery,2004,19(3):1464-1471.
|
[19] | 钟 胜. 与超高压输电线路加装串补装置有关的系统问题及其解决方案[J]. 电网技术,2004,28(6):26-30. ZHONG Sheng. Problems caused by adding series compensation devices to EHV transmission system and their solution[J]. Power System Technology,2004,28(6):26-30.
|