广东火电工程总公司调试所. 润州B厂2×300 MW机组工程1机组交接试验报告[R]. 广州:广东火电工程总公司调试所,2009. Commission Institue of Guangdong Power Engineering Corporation. Hand over test report of No.1 unit in Runzhou B thermal power plant(2×300 MW)[R]. Guangzhou:Commission Institue of Guangdong Power Engineering Corporation,2009.
[2]
IEC 60694―2002 Common specifications for high-voltage switchgear and controlgear standards[S]. 2002.
[3]
GB 50150―2006电气装置安装工程电气设备交接试验标准[S]. 北京:中国计划出版社,2006. GB 50150-2006 Electric equipment installation engineering standard for hand over test of electric equipment[S]. Beijing: China Planning Press,2006.
[4]
DL/T 593―2006高压开关设备和控制设备标准的共用技术要求[S]. 北京:中国质检版社,2006. DL/T 593―2006 Common specifications for high-voltage switchgear and controlgear standards[S]. Beijing:China Zhijian Publishing House,2006.
[5]
DL/T 596―1996电气设备预防性试验规程[S]. 北京:中国电力出版社,1996. DL/T 596―1996 Preventive test code for electric power equipment[S]. Beijing:China Power Press,1996.
[6]
Secheron. High-speed DC circuit-breaker mounting and maintenance instructions[Z]. Version: C00 25.5,2004.
[7]
刘振东,段秦刚,陈 茜. 光伏发电系统低电压穿越控制策略[J]. 陕西电力,2013,41(5):14-16. LIU Zhendong,DUAN Qingang,CHEN Qian. The LVRT control strategy of photovoltaic system[J]. Shaanxi Electric Power,2013,41(5):14-16.
[8]
张富超,黄家栋. 基于关键线路识别的电力系统连锁故障风险评估模型[J]. 陕西电力,2014,42(8):55-58. ZHANG Fuchao,HUANG Jiadong. Risk assessment model of cascading failures in power system based on identification of critical lines[J]. Shaanxi Electric Power,2014,42(8):55-58.
[9]
欧阳旭东,柯春俊,杨 贤,等. 变压器局部放电UHF 传感器安装方式对检测灵敏度的影响理论分析[J]. 变压器,2014,51(5):56-58. OUYANG Xudong,KE Chunjun,YANG Xian,et al. Theoretical analysis of impact to detection sensitivity for installation mode of UHF sensors in transformer PD test[J]. Transformer,2014,51(5):56-58.
[10]
杨洁民,王 振. 换流变绕组温度测量装置故障原因分析及测量装置原理介绍[J]. 变压器,2014,51(8):48-50. YANG Jiemin,WANG Zhen. Reason analysis of measurement device for winding temperature of converter transformer and its principle introduction[J]. Transformer,2014,51(8):48-50.
[11]
朱芳政,杨万格,肖其平. UR36灭磁开关配套保护装置[J]. 湖南电力,2004,24(6):43-45. ZHU Fangzheng,YANG Wange,XIAO Qiping. The matching protection device for UR36 field discharge switch[J]. Hunan Electric Power,2004,24(6):43-45.
[12]
徐 亮. UR型磁场断路器检修试验及故障处理[C]//2012年发电机励磁系统学术年会.湖北:[s.n.],2012:119-121. XU Liang. Maintenance,test and fault treatment of the UR DC breaker[C]//2012 Academic Annual Conference of the Generator Excitation Systems. Hubei:[s.n.],2012:119-121.
[13]
郭贤珊,李仲夫. 试验电源在断路器机械特性试验中的影响[J]. 华中电力,1999(2):15-17. GUO Xianshan,LI Zhongfu. Influences of power source on circuit breaker testing[J]. Central China Electric Power,1999(2):15-17.
[14]
湖南火电建设公司. 润州B厂2×300 MW机组工程2机组发变组系统设备试验报告[R]. 长沙:湖南火电建设公司,2009. Hunan Provincial Thermal Power Construction Co..Hand over test report of No.2 unit in Runzhou B thermal power plant(2×300 MW)[R]. Changsha:Hunan Provincial Thermal Power Construction Co.,2009.
[15]
中国大唐集团公司. Q/CDT 107 001―2005电力设备交接和预防性试验规程[S]. 2005. China Datang Corporation. Q/CDT 107 001―2005 Hand over and preventive test code of electric power equipment[S]. 2005.
[16]
华北电网有限公司. Q/HBW 14701―2008电力设备交接和预防性试验规程[S]. 2008. North China Grid Company Limited.Q/HBW 14701―2008 Hand over and preventive test code of electric power equipment[S]. 2008.
[17]
吴石书. 断路器最低动作电压测试方法的探讨[J]. 高电压技术,2006,32(1):119-120. WU Shishu. Discussion on the testing method for the lowest tripping voltage of circuit breakers[J]. High Voltage Engineering,2006,32(1):119-120.
[18]
曹 阳,高 琳,周 鹏. 断路器低电压分合闸测试方法探讨[J]. 山东电力技术,2010(6):1-4. CAO Yang,GAO Lin,ZHOU Peng. Discussion of low voltage test of circuit breaker[J]. Shandong Electric Power,2010(6):1-4.