蓝 天,张毅刚.大跨度屋盖结构抗震设计[M].北京:中国建筑工业出版社, 2000:1-2. LAN Tian, ZHANG Yigang. Seismic design of long-span roof structures[M]. Beijing:China Architecture &Building Press,2000:1-2.(in Chinese)
[2]
李惠强,汪志香,方召欣,等.施工状态大跨钢管拱桁架结构受力变形监测与分析[J].施工技术,2006,35(3):70-72. LI Huiqiang, WANG Zhixiang, FANG Zhaoxin, et al. Deformation monitoring and analysis of large-span steel-pipe arch truss in construction state[J]. Construction Technology,2006,35(3):70-72.(in Chinese)
[3]
叶芳芳,余志武,袁俊杰.重庆大剧院大悬挑结构卸载分析[J].建筑科学与工程学报,2009,26(3):122-126. YE Fangfang, YU Zhiwu, YUAN Junjie. Unloading analysis for large cantilever structure of chongqing grand theatre[J]. Journal of Architecture and Civil Engineering,2009,26(3):122-126.(in Chinese)
[4]
高 颖,傅学怡,杨想兵.济南奥体中心体育场钢结构支撑卸载全过模拟[J].空间结构,2009,15(1):20-34. GAO Ying, FUXueyi, YANG Xiangbing. Whole removal process simulation of temporary support of Ji’nan Olympic Stadimu[J]. Spatial Structures,2009,15(1):20-34.(in Chinese)
[5]
钱稼茹,张微敬,赵作周,等.北京大学体育馆钢屋盖施工模拟与监测[J].土木工程学报,2009,42(9):13-20. QIAN Jiaru, ZHANG Weijing,ZHAO Zuozhou, et al. Simulation and monitoring for the construction of the steel roof the Peking University Gymnasium[J]. China Civil Engineering Journal,2009,42(9):13-20.(in Chinese)