Popov E P,Mahin S A,Zayas V A.Inelastic cyclic behavior of tubular braced frames[J].Journal of Structural Engineering,1980,106:2375~2390.
[2]
邵永松.焊接T形截面单斜支撑杆件滞回性能的试验研究[D].哈尔滨:哈尔滨建筑大学,1990.
[3]
Rai D C,Goel S C.Seismic evaluation and upgrading of chevron braced frames[J].Journal of Constructional Steel Research,2003,59:971~994.
[4]
Bertero V V,et al.Earthquakes miulator testing of concentric braced dual system[J].Journal of Structural Engineering,1989,115:1877~1894.
[5]
Ikeda K,Mahin S A.Cyclic response of steel braces[J].Journal of Structural Engineering,1986,112:361~377.
[6]
Goel S C,Tang X.Brace failures in dualbracing systems[M].New York:Orlando,FL,USA,1987.
[7]
Lee C S.Seismic behavior of hollow and concrete-filleds quaretubular bracingm embers[D].Michigan:The University of Michigan,1987.
[8]
Liu Z,Goel S C.Investigation of concrete-filleds teeltubular cyclic bending bucklingm embers[D].Michigan:The University of Michigan,1987.
[9]
张耀春,连尉安,张文元.焊接工字形截面钢支撑低周疲劳性能试验研究[J].建筑结构学报,待发表.
[10]
Elchalakani M,Zhao X L,Grzebieta R.Tests of cold-formed circulartubular braces undercyclic axial loading[J].Journal of Structural Engineering,2003,129:507~514.