张超勇,饶运清,李培根,等.柔性作业车间调度问题的两级遗传算法[J].机械工程学报,2007,43(4):119-124. Zhang Chaoyong, Rao Yunqing, Li Peigen, et al. Bilevel genetic algorithm for the flexible job-shop scheduling problem[J]. Chinese Journal of Mechanical Engineering, 2007,43(4):119-124. (in Chinese)
[2]
Xing Lining, Chen Yingwu, Yang kewei. Multi-objective flexible job shop scheduling: design and evaluation by simulation modeling[J]. Applied Soft Computing, 2009,9(1):362-376.
[3]
谢志强.工件间有约束的复杂产品工序调度研究[D].哈尔滨:哈尔滨理工大学,2009. Xie Zhiqiang. Study on operation scheduling of complex product with constraint among jobs[D]. Harbin: Harbin University of Science and Technology, 2009. (in Chinese)
[4]
Xie Zhiqiang, Hao Shuzhen, Ye Guangjie, et al. A new algorithm for complex product flexible scheduling with constraint between jobs[J]. Computers & Industrial Engineering, 2009,57(3):766-772.
[5]
谢志强,辛宇,杨静.基于设备空闲事件驱动的综合调度算法[J].机械工程学报,2011,47(11):139-147. Xie Zhiqiang, Xin Yu, Yang Jing. Integrated scheduling algorithm based on event driven by machines\' idle[J]. Chinese Journal of Mechanical Engineering, 2011,47(11):139-147. (in Chinese)
[6]
谢志强,辛宇,杨静.可回退抢占的设备驱动综合调度算法[J].自动化学报,2011,37(11):1332-1343. Xie Zhiqiang, Xin Yu, Yang Jing. Machine-driven integrated scheduling algorithm with rollback-preemptive[J]. Acta Automatica Sinica, 2011,37(11):1332-1343. (in Chinese)
[7]
Xie Zhiqiang, Wang Peng, Gui Zhongyan, et al. Integrated scheduling algorithm based on dynamic essential short path[J]. Advances in Intelligent and Soft Computing, 2012,169:709-715.