[1] | Benaroch M, Shah S, Jeffery M. On the valuation of multi-stage IT investments embedding nested real options[R].[S.l]: Syracuse University, 2006.
|
[2] | 王文轲, 赵昌文.研发投资动态多阶段决策模型及其应用研究:基于多期复合实物期权[J].软科学,2010,24(1):12-16. Wang Wenke, Zhao Changwen. Research on the dynamic multi-stage decision model of R&D investment and its application: based on multi-stage compound real option[J]. Soft Science, 2010,24(1):12-16. (in Chinese)
|
[3] | Pindyck R. Irreversible investment, capacity choice, and the value of the firm[J]. The American Economic Review, 1988,78:969-985.
|
[4] | He H, Pindyck R S. Investments in flexible production capacity[J]. Journal of Economic Dynamics and Control, 1992,16:575-99.
|
[5] | Myers S C, Majd S. Abandonment value and project life[J]. Advances in Futures and Options Research, 1990,4:1-21.
|
[6] | Kulatilaka N. Valuing the flexibility of flexible manufacturing systems[J]. IEEE Transactions in Engineering Management, 1988,35(4):250-257.
|
[7] | Kulatilaka N. The value of flexibility: the case of a dual-fuel industrial stream boiler[J]. Financial Management, 1993,22(3):271-280.
|
[8] | Huchzermeier Arnd, Loch Christoph H. Project management under risk: using the real options approach to evaluate flexibility in R&D[J]. Management Science, 2001,47(1):85-101.
|
[9] | Miller B, Clarke J P. Real options and strategic guidance in the development of new aircraft programs[R].[S.l]: Real Options Conference, 2005.
|
[10] | Childs P D, Ott S H, Triantis A J. Capital budgeting for interrelated projects: a real options approach[J]. Journal of Financial and Quantitative Analysis, 1998,33(3):305-334.
|
[11] | Childs P D, Triantis A J. Dynamic R&D investment policies[J]. Management Science, 1999,45(10):1359-1377.
|
[12] | Suh E, de Weck O, Chang O. Flexible product platforms: framework and case study[J]. Research in Engineering Design, 2007,18(2):67-89.
|
[13] | De Weck O, de Neufville R, Chaize M. Staged deployment of communications satellite constellations in low earth orbit[J]. Journal of Aerospace Computing, Information, and Communication, 2004,1(3):119-136.
|
[14] | Hassan R, de Neufville R, de Weck O, et al. Value-at-risk analysis for real options in complex engineered systems[C]//IEEE International Conference on Large Scale Infrastructure. Hawaii:.[S.n], 2005:3697-3704.
|
[15] | Wang T, de Neufville R. Identification of real options "in" projects[C]//Proceedings of 16th Annual Symposium, International Council on Systems Engineering. Orlando, Florida:[s.n], 2006:1124-1133.
|
[16] | Kalligeros K. Platforms and real options in large-scale engineering systems[D]. Boston: MIT, 2006.
|
[17] | Silver M, de Weck O. Time-expanded decision networks: a framework for designing evolvable complex systems[J]. Systems Engineering, 2007,10(2):167-186.
|
[18] | de Neufville R, Wang Scholtes. Real options by spreadsheet: parking garage case example[J]. Journal of Infrastructure Systems, 2006,12(3):107-111.
|
[19] | Shishko R, Ebbeler D H, et al. NASA technology assessment using real options valuation[J]. Systems Engineering, 2004,7:1-12.
|
[20] | Joseph S H, Gregory M, Jordan N C. Flexibility: a multidisciplinary literature review and a research agenda for designing flexible engineering systems[J]. Journal of Engineering Design, 2009,20(3):307-323.
|
[21] | Roos D. Engineering systems at MIT-the development of the engineering systems division[C]//Proceedings of Engineering Systems Symposium. Boston: MIT, 2004.
|
[22] | 米洁,邓家褆.观测卫星概念方案设计及其不确定性研究[J].中国机械工程,2007,18(7):781-792. Mi Jie, Deng Jiati. Research on conceptual architecture design and uncertainty of observation satellite[J]. China Mechanical Engineering, 2007,18(7):781-792. (in Chinese)
|
[23] | 孙康文,黄俊,熊雯.飞行器设计中不确定性因素分析[J].飞行力学,2008,26(3):1-4. Sun Kangwen, Huang Jun, Xiong Wen. Analysis of uncertainty in aircraft design[J]. Flight Dynamics, 2008,26(3):1-4. (in Chinese)
|
[24] | 李晓斌,向杨蕊,金振中,等.不确定性设计优化理论与方法研究[J].机械设计,2007,24(9):1-4. Li Xiaobin, Xiang Yangrui, Jin Zhenzhong, et al. Study on the optimization theory and methodology of uncertainty design[J]. Journal of Machine Design, 2007,24(9):1-4. (in Chinese)
|
[25] | 吕明云,孙康文,马云鹏,等.基于不确定性的设计方案经济可承受性分析[J].北京航空航天大学学报,2010,36(1):118-122. Lü Mingyun, Sun Kangwen, Ma Yunpeng, et al. Economic affordability of aircraft conceptual/preliminary scheme based on uncertainty[J]. Journal of Beijing University of Aeronautics and Astronautics, 2010, 36(1):118-122. (in Chinese)
|
[26] | 张为华,李晓斌.飞行器多学科不确定性设计理论概述[J].宇航学报,2004,25(6):702-706. Zhang Weihua, Li Xiaobin. Survey on the theory of aircraft multidisciplinary uncertainty design[J]. Journal of Astronautics, 2004, 25(6): 702-706. (in Chinese)
|
[27] | Neely J E. Improving the valuation of research and development: a composite of real options, decision analysis and benefit valuation frameworks[D]. Boston: MIT, 1998.
|
[28] | Myles Alexander Walton. Managing uncertainty in space systems conceptual design using portfolio theory[D]. Boston: MIT, 2002.
|
[29] | McManus H, Hastings D E. A framework for understanding uncertainty and its mitigation and exploitation in complex systems[J]. Engineering Management Review, 2006,34(3):81-100.
|
[30] | Cardin M A, de Neufville R. A survey of state-of-the-art methodologies for identifying and valuing flexible design opportunities in engineering systems[R]. Boston: MIT, 2008.
|
[31] | Lin Jijun. Exploring flexible strategies in engineering systems using screening models applications to offshore petroleum projects[D]. Boston: MIT, 2008.
|
[32] | de Neufville R. Architecting/designing engineering systems using real options[R].[S.l.]: ESD Internal Symposium, 2003.
|
[33] | Trigeorgis L. Real options: managerial flexibility and strategy in resource allocation[M].[S.l.]: The MIT Press, 1998.
|
[34] | Saleh J H. Weaving time into system architecture: new perspectives on flexibility, spacecraft design lifetime, and on-orbit servicing[D]. Boston: MIT, 2002.
|
[35] | Mikaelian T. An integrated real options framework for model-based identification and valuation of options under uncertainty[D]. Boston: MIT, 2009.
|
[36] | ESD Symposium Committee. ESD terms and definitions[EB/OL].[2001-10-19].http://esd.mit.edu/wps/esd-wp-2002-01.pdf.
|
[37] | Myers S. Determinants of corporate borrowing[J]. Journal of Financial Economics, 1977,5(2):147-175.
|
[38] | Dixit A, Pindyck R. Investment under uncertainty [M]. New Jersey: Princeton University Press, 1994.
|
[39] | Trigeorgis L. Real options: managerial flexibility and strategy in resource allocation[M]. Boston: The MIT Press, 1998.
|
[40] | Smit H T J, Trigeorgis L. Strategic investment: real options and games[M]. New Jersey: Princeton University Press, 2004.
|
[41] | Schulmerich M. Real options valuation: the importance of interest rate modelling in theory and practice[M]. Berlin: Springer, 2005.
|
[42] | Mun J. Real options analysis: tools and techniques for valuing strategic investments and decisions[M]. New Jersey: John Wiley & Sons, Inc. Publication, 2006.
|
[43] | de Neufville R. Class notes for engineering systems analysis for design, MIT engineering school-wide elective[EB/OL].[2001-11-30]. http://ardent.mit.edu/real_options/Common_course_materials/slides.html.
|
[44] | Wang Tao. Real options "in" projects and systems design identification of options and solution for path dependency[D]. Boston: MIT, 2005.
|
[45] | Saleh J H, Hastings D E, Newman D J. Flexibility in system design and implications for aerospace systems[J]. Acta Astronautica, 2003,53(12):927-944.
|
[46] | Kalligeros Konstantinos C, de Weck Olivier. Flexible design of commercial systems under market uncertainty: framework and application[C]//Proceedings of AIAA. New York:[s.n.], 2004:1-14.
|
[47] | Ross A M, Hastings D E. Assessing changeability in aerospace systems architecting and design using dynamic multi-attribute tradespace exploration[R]. San Jose: AIAA, 2006.
|
[48] | Roshanak Nilchiani. Measuring space systems flexibility: a comprehensive six-element framework[D]. Boston: MIT, 2005.
|
[49] | Cardin M A, de Neufville R. A survey of state-of-the-art methodologies for identifying and valuing flexible design opportunities in engineering systems[R]. Boston: MIT, 2008.
|
[50] | Nilchiani R, Hastings D E, Joppin C. Calculations of flexibility in space systems[C]//Proceedings of the INCOSE 15th International Symposium. New York:[s.n.], 2005:1565-1578.
|
[51] | Black F, Scholes M. The pricing of options and corporate liability[J]. Journal of Political Economy, 1973,81:637-654.
|
[52] | Cox J C, Ross S A, Rubinstein M. Option pricing: a simplified approach[J]. Journal of Financial Economics, 1979,7:229-263.
|
[53] | Boyle P P. Options: a Monte Carlo approach[J]. Journal of Financial Economics, 1977,4:323-338.
|
[54] | Tilley J A. Valuing american options in a path simulation model[J]. Transaction of the Society of Actuaries, 1993,45:83-104.
|
[55] | Barraquand J, Martineau D. Numerical valuation of high dimensional multivariate american securities[J]. Journal of Financial and Quantitatives Analysis, 1995,30(3):383-405.
|
[56] | Broadie M, Glasserman P. Pricing American-style securities using simulation[J]. Journal of Economic Dynamics and Control, 1997,21:1323-1352.
|
[57] | Longstaff F A, Schwarz E S. Valuing American options by simulation: a simple least-squares approach[J]. The Review of Financial Studies, 2001,14(1):113-147.
|
[58] | Carriere J F. Valuation of the early-exercise price for options using simulations and nonparametric regression[J]. Insurance: Mathematics and Economics, 1996,19:19-30.
|
[59] | Clément E, Lamberton D, Protter P. An analysis of a least squares regression method for American option pricing[J]. Finance and Stochastics, 2002,6:449-471.
|
[60] | Gamba A. Real options: a Monte Carlo approach[R].[S.l.]: Department of Economics University of Verona,2003.
|
[61] | Chan Ngaihang, Wong Hoiying. Simulation techniques in financial risk management[M]. New Jersey: John Wiley & Sons, Inc. Publication, 2006.
|
[62] | Phelim Boyle, Mark Broadie, Paul Glasserman. Monte Carlo methods for security pricing[J]. Journal of Economic Dynamics and Control, 1997,21:1267-1321.
|
[63] | Lenos Trigeorgis. Real options and interactions with financial flexibility[J]. Financial Management, 1993,22(3):202-224.
|
[64] | McDonald R, Siegel D. The value of waiting to invest[J]. The Quarterly Journal of Economics, 1986,101(4):707-728.
|
[65] | 夏轶群,陈俊芳.技术不确定的研发项目投资时机期权博弈分析[J].科研管理,2009,30(2):126-130. Xia Yiqun,Chen Junfang. Optiongame analysis for the entrance time of R&D projects investment under technology uncertainty[J]. Science Research Management,2009,30(2):126-130. (in Chinese)
|
[66] | Sylvia Panayi, Lenos Trigeorgis. Multi-stage real options: the cases of information technology infrastructure and international bank expansion[J]. The Quarterly Review of Economics and Finance, 1998,38:675-692.
|
[67] | 冉伦.基于实物期权理论的企业R&D项目投资决策研究[D].北京:北京理工大学管理与经济学院,2005. Ran Lun. Investment decision of enterprise research and development projects based on real options[D]. Beijing: School of Management and Economics, Beijing Institute of Technology, 2005. (in Chinese)
|