PENG Chuan-sheng. Container terminal apron number of device configuration [J]. Containerization, 2005(7): 23-27.(in Chinese)
[3]
[1] IMAI A, NAGAIWA K, TAT C W. Efficient planning of berth allocation for container terminals in Asia[J]. Journal of Advanced Transportation, 1997, 31(1): 75-94.
[4]
[2] NAM K C, KWAK K S, YU M S. Simulation study of container terminal performance[J]. Transportation Research Part E, 2002, 128(3): 126-132.
[5]
[3] DRAGOVIC B, PARK N K, RADMILOVIC Z. Ship-berth link performance evaluation :simulation and analytical approaches[J]. Maritime Policy and Management, 2006, 33(3): 281-299.
[6]
[4] IMAI A, NISHIMURA E, PAPADIMITRIOU S. Berthing ships at a multi-user container terminal with a limited quay capacity[J]. Transportation Research Part E, 2008, 44(1): 136-151.
[7]
[5] GIALLOMBARDO G, MOCCIA L, SALANI M. The tactical berth allocation problem with quay crane assignment and transhipment-related quadratic yard costs[J]. European Transport Conference, 2008: 1-27.
[8]
[6] MEISEL F, BIERWIRTH C. Heuristics for the integration of crane productivity in the berth allocation problem[J]. Transportation Research Part E, 2009, 45(1): 196-209.
[9]
[7] LIANG C, HUANG Y. A quay crane dynamic scheduling problem by hybird evolutionary algorithm for berth allocation planning[J]. Computers and Industrial Engineering, 2009, 56(3): 1021-1028.
[10]
[8] ZHANG H, KIM K H. Maximizing the number of dual-cycle operations of quay cranes in container terminals[J]. Computers and Industrial Engineering, 2009, 56(3): 979-992.
[11]
[9] BIERWIRTH C, MEISEL F. A survey of berth allocation and quay crane scheduling problem in container terminals[J]. European Journal of Operational Research, 2010, 202(3): 615-627.
[12]
[10] BUHRKAL K, ZUGLIAN S, ROPKE S. Models for the discrete berth allocation problem: A computational comparison[J]. Transportation Research Part E, 2011, 47(4): 461-473.
[13]
[11] MEISEL F, BIERWIRTH C. A unified approach for the evaluation of quay crane scheduling models and algorithms[J]. Computers and Operations Research, 2011, 38(3): 683-693.
[14]
[12] JIN Z, LI N. Optimization of quay crane dynamic scheduling based on berth schedules in container terminal[J]. Journal of Transportation Systems Engineering and Information Technology, 2011, 11(3): 58-64.
[15]
[13] DEMIRCI E. Simulation modelling and analysis of a port investment[J]. Simulation, 2003, 79(2): 94-105.
[16]
[14] KIM K H, PARK Y M. A crane scheduling method for port container terminals[J]. European Journal of Operational Research, 2004, 156(3): 752-768.
[17]
[15] CHEN H C, IMAI A, NISHIMURA E. The simultaneous berth and quay crane allocation problem[J]. Transportation Research Part E, 2008, 44(5): 900-920.
[18]
[16] BIERWIRTH C, MEISEL F. A fast heuristic for quay crane scheduling with interference constraints[J]. Journal of Scheduling, 2009, 12(4): 345-360.
[19]
[17] TAVAKKOLI-MOGHADDAM R, MAKUI A, SALAHI S. An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports[J]. Computers and Industrial Engineering, 2009, 56(1): 241-248.
[20]
[18] WANG S, ZHENG J, ZHENG K. Multi resource scheduling problem based on an improved discrete particle swarm optimization[J]. Physics Procedia, 2012, 25: 576-582.
[21]
[19] YANG C, WANG X, LI Z. An optimization approach for coupling problem of berth allocation and quay crane assignment in container terminal[J]. Computers and Industrial Engineering, 2012, 63(1): 243-253.
[22]
[20] OLIVEIRA R M D, MAURI G R, LORENA L A N. Clustering search for the berth allocation problem[J]. Expert Systems with Applications, 2012, 39(5): 5499-5505.
[23]
[21] 彭传圣. 岸桥集装箱起重机作业能耗分析[J]. 港口装卸, 2010(5): 8-11.
[24]
PENG Chuan-sheng. Analysis on operation energy consumption of quayside container crane[J]. Port Operation, 2010(5): 8-11.(in Chinese)