全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

液化天然气汽车加气站建设投资规划模型及其应用

, PP. 128-132

Keywords: 液化天然气(LNG)汽车加气站,投资规模,投资时间,整数规划模型

Full-Text   Cite this paper   Add to My Lib

Abstract:

全面考虑建设成本、固定成本、变动成本、融资成本、税金和销售收入等影响液化天然气汽车加气站(LNG加气站)项目建设与运营的各项成本与效益因素,提出LNG加气站建设投资整数规划模型,解决规划期内于目标小区建设加气站的最优投资规模与最优投资时机问题.模型充分考虑由液化天然气汽车推广程度差异造成的各地区市场需求的不均衡性,统筹规划资本分配与利用,求解得到的投资方案具有区域和时间上的层次性,符合现实背景与企业资本约束.运用该方法为某企业制定辽宁省LNG加气站项目建设投资决策,并由敏感性分析得出结论,不同参数设置下求解得到的投资方案在各目标小区的总建站数量基本一致,计算结果适应性强;项目的总体收益、投资时间分别对加气站的售气量、初始建设成本敏感.

References

[1]  [1] LIN W S, ZHANG N, GU A Z. LNG (liquefied natural gas): A necessary part in China’s future energy infrastructure[J]. Energy, 2010, 35:4383-4391.
[2]  [2] ARTECONI A, BRANDONI C, EVANGELISTA D, et al. Life-cycle greenhouse gas analysis of LNG as a heavy vehicle fuel in Europe[J]. Applied Energy, 2010,87: 2005-2013.
[3]  [3] 李竹林. LNG汽车加气站及车辆技术应用[J].城市车辆, 2007(10):34-39.
[4]  LI Z L. Application of LNG refueling stations and vehicle technology[J]. City Vehicle, 2007(10):34-39.(in Chinese)
[5]  [4] 陈叔平,任永平,殷劲松,等.撬装式LNG加气站的应用[J].煤气与热力,2010,30(1):11-14.
[6]  CHEN S P, REN Y P, YIN J S, et al. Application of skid-mounted LNG vehicle filling station[J]. Gas & Heat, 2010,30(1):11-14.(in Chinese)
[7]  [5] FRICK M, AXHAUSEN K W, CARLE G, et al. Optimization of the distribution of compressed natural gas(CNG)refueling stations: Swiss case studies[J]. Transportation Research Part E, 2007,12:82-829.
[8]  [6] BERSANI C, MINCIARDI R, SACILE R. Network planning of fuelling service stations in a near-term competitive scenario of the hydrogen economy[J]. Socio-EconomicPlanning Sciences,2009, 43:55-71.
[9]  [7] WANG Y W, LIN C C. Locating road-vehicle refueling stations[J]. Transportation Research Part E, 2009,45:82-829.
[10]  [8] SHUKLA A, PEKNY J, VENKATASUBRAMANIAN V. An optimization framework for cost effective design of refueling station infrastructure for alternative fuel vehicles[J]. Computers and Chemical Engineering, 2011, 35:1431-1438.
[11]  [9] KUBY M, LIM S.The flow-refueling location problem for alternative-fuel vehicles[J]. Socio-Economic Planning Sciences, 2005,39:125-145.
[12]  [10] KUBY M, LINES L, SCHULTZ R, et al. Optimization of hydrogen stations in Florida using the flow-refueling location model[J]. International Journal of Hydrogen Energy, 2009,34:6045-6064.
[13]  [11] 阳军,孟卫东,熊维勤.不确定条件下最优投资时机和最优投资规模决策[J].系统工程理论与实践, 2012,32(4):752-759.
[14]  YANG J, MENG W D, XIONG Q W. Optimal investment timing and investment scale decision making under uncertainty[J]. Systems Engineering-Theory & Practice, 2012,32(4):752-759.(in Chinese)
[15]  [12] MELAINA M W. Initiating hydrogen infrastructures: preliminary analysis of a sufficient number of initial hydrogen stations in the US[J]. International Journal of Hydrogen Energy, 2003,28:743-755.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133