全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

可修系统预防性维修时间的确定

DOI: 10.3969/j.issn.1005-3026.2014.01.020, PP. 84-87

Keywords: 预防性维修时间,单位时间平均收益,优化,工作时间,维修时间

Full-Text   Cite this paper   Add to My Lib

Abstract:

提出一种针对复杂可修系统确定预防性维修时间的方法.定义寿命周期,建立工作时间和维修时间的联合密度函数.考虑系统正常运行过程中产生的收益和各种维修活动所造成的损失,应用随机变量函数的数学期望的相关理论,计算单位寿命周期内系统运行单位时间的平均收益关于预防性维修时间T的函数,以最大单位时间收益为目标对T进行优化.运用Newton迭代法确定系统的最佳预防维修时间,并计算最佳预防维修时间所对应的可靠性.通过实例具体说明所提出预防性维修时间确定方法的建模求解过程,并分析系统寿命分布参数对最佳预防性维修时间的影响.

References

[1]  [1]Moghaddam K S ,Usher J S.Sensitivity analysis and comparison of algorithms in preventive maintenance and replacement scheduling optimization models[J].Computer & Industrial Engineering,2011,61(1):64-75.
[2]  Nahas N ,Khatab A,Ait-Kadi D,et al.Extended great deluge algorithm for the imperfect preventive maintenance optimization of multi-state systems[J].Reliability Engineering and System Safety,2008,93(11):1658-1672.
[3]  Zhou X J ,Xi L F,Lee J.Opportunistic preventive maintenance scheduling for a multi-unit series system based on dynamic programming[J].International Journal of Production Economics,2009,118(2):361-366.
[4]  Wu J ,Xie M,Sheng T,et al.On a general periodic preventive maintenance policy incorporating warranty contracts and system aging losses[J].International Journal of Production Economics,2011,129(1):102-110.
[5]  Chen C T .Dynamic preventive maintenance strategy for an aging and deteriorating production system[J].Expert Systems with Application,2011,38(5):6287-6293.
[6]  Nodem F I D ,Kenne J P,Gharbi A.Simultaneous control of production,repair/replacement and preventive maintenance of deteriorating manufacturing systems[J].International Journal of Production Economics,2011,134(1):271-282.
[7]  Fitouhi M C ,Nourelfath M.Integrating noncyclical preventive maintenance scheduling and production planning for a single machine[J].International Journal of Production Economics,2012,136(2):341-351.
[8]  魏瑛源.混合随机变量的分布[J].河西学院学报,2008,24(2):19-22.(Wei Ying-yuan.The distribution function of mixture random variable[J].Journal of Hexi University,2008,24(2):19-22.)
[9]  Polyak B T .Newton’s method and its use in optimization[J].European Journal of Operational Research,2007,181(3):1086-1096.
[10]  于晓红,张来斌,王朝晖,等.基于新的威布尔分布参数估计法的设备寿命可靠性分析[J].机械强度,2007,29(6):932-936.(Yu Xiao-hong,Zhang Lai-bin,Wang Zhao-hui,et al.Reliability life analysis of the equipment based on new Weibull distribution parameter estimation method[J].Journal of Mechanical Strength,2007,29(6):932-936.)

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133