Gara F,Ranzi G,Leoni G.Partial interaction analysis with shear-lag effects of composite bridges:a finite element implementation for design applications[J].Advanced Steel Construction,2011,7(1):1-16.
[2]
Luo Q Z,Li Q S,Tang J.Shear lag in box girder bridges [J].Bridge Engineering,2002,7(5):308-313.
[3]
Zhou S J.Finite beam element considering shear-lag effect in box girder [J]. Mechanical Engineering,2010,136(9):1115-1122.
[4]
Lertsima C,Chaisomphob T,Yamaguchi E.Stress concentration due to shear lag in simply supported box girders [J].Engineering Structures,2004,26(8):1093-1101.
[5]
Zhang Y H,Lin L X.Shear lag analysis of thin-walled box girders based on a new generalized displacement[J].Engineering Structures,2014,61(1):73-83.
[6]
聂建国,李法雄,樊健生,等.钢-混凝土组合梁考虑剪力滞效应实用设计方法[J].工程力学,2011,28(11):45-51.(Nie Jian-guo ,Li Fa-xiong ,Fan Jian-sheng ,et al.Practical design method for steel-concrete composite beam considering shear lag effect [J].Engineering Mechanics,2011,28(11):45-51.)
[7]
蔺鹏臻,周世军,刘凤奎.抛物线型剪滞翘曲位移函数引起的附加轴力分析[J].工程力学,2010,27(8):90-93. (Lin Peng-zhen,Zhou Shi-jun ,Liu Feng-kui.Additional axial force analysis caused by parabolical warping displacement about shear lag[J].Engineering Mechanics,2010,27(8):90-93.)
[8]
Reissner E.Analysis of shear lag in box beams by the principle of minimum potential energy[J].Quarterly of Applied Mathematics,1946,5(3):268-278.
[9]
Chang S T.Shear lag effect in simply supported prestressed concrete box girder[J].Journal of bridge Engineering,2004,9(2):178-184.
[10]
李平.钢-混凝土组合箱梁剪力滞效应的试验研究[D].苏州:苏州科技学院,2009.(Li Ping.Experimental research of steel-concrete composite box beam shear lag effect[D].Suzhou:Suzhou University of Science and Technology,2009.)