ZHU Ci-xiang,WU Wen-you,JIANG Chuan-gang.Long spanslant legged rigid frame bridge demolition construction key technol-ogies[J].Highway Traffic Science and Technology:ApplicationTechnology Edition,2009(8):23-25.
[4]
ZHENG Yue,TIAN Zhong-ya.Push method in bridge demolishingapplication[J].Highway,2000(2):59-61.
[5]
刘显晖,谭柳芳,杨帆,等.一种旧桥拆除的创新方法[J].施工技术,2005,34(9):4-6.
[6]
ZHU zhi-xiang,ZHOU Ci-fei.Large span concrete continuousbeam bridge demolition method and technology[J].Highway Traf-fic Science and Technology:Application Technology Edition,2010(10):72-77.
[7]
黄绍金,刘陌生.装配式公路钢桥多用途使用手册[M].北京:人民交通出版社,2002:21-32.
[8]
SHEN Shi-feng,SUN Ling-zhi.Pontoon duyun method in the re-moval of cantilever bridge structure in the application[J].EastRoad,2005(5):76-79.
[9]
WANG Wang-quan,XIANG Rui,ZHOU Xi-long.The pouring se-quence segment cutting method in old bridge demolition application[J].Traffic Science and Technology,2007(4):34-36.