YAN Shi,JIN Chun-fu,NIU Peng.Numerical simulation on me-chanical performance of steel pipes during new tubular roof con-struction[J].Construction Technology,2009,38(12):376-380.
[6]
Takeda N,Nishimura T,Kakuya E,et al.Observational construc-tion method for the underground cavern of the Kyogoku Hydropowerplant project[C].Helsinki,Finland:Proceedings of World TunnelCongress 2011-Underground Spaces in the Service of a Sustainable Society,2011:132-133.
Jeongyoon K,Innjoon P,Kyonggon K.A study on the applicabilityof underground structure using steel tubular in Korean geotechnicalcondition[J].Tunneling Technology(Korean),2003,5(4):401-409.